Overview
Native name无锡地铁
LocaleWuxi, China
Transit typeRapid transit
Number of lines5 【A total of 11 routes are planned in the future】
Number of stations97
Daily ridership1,103,200 (31 December 2023), record paying[1]
Annual ridership184,600 million (2023)[2]
Websitehttp://www.wxmetro.net/front/index.html
Operation
Began operationJuly 1, 2014; 10 years ago (2014-07-01)[3]
Operator(s)Wuxi Metro Corporation
CharacterMostly underground, with some elevated alignment
Train length6–cars
Technical
System length145 km (90 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC third rail

Wuxi Metro is the rapid transit system of Wuxi, Jiangsu province, China. Line 1 began operations on 1 July 2014,[3] and Line 2 on 28 December 2014.[4][5] Line 3 opened on 28 October 2020. Line 4 opened on 17 December 2021.

Wuxi Metro (Wuxi Metro) is an urban rail transit system serving Wuxi City, Jiangsu Province, China. Its first line, Wuxi Metro Line 1, was officially opened for operation on July 1, 2014, making Wuxi the 22nd in mainland China. It is the third city in Jiangsu Province to open rail transit.

As of December 2021, there are 4 operating lines in Wuxi Metro, namely Wuxi Metro Line 1, Wuxi Metro Line 2, Wuxi Metro Line 3 Phase I, and Wuxi Metro Line 4 Phase I, all of which are metro lines covering Liangxi District, Binhu District, Xishan District, Xinwu District, and Huishan District are five municipal districts, with an operating mileage of 113.53 kilometers and a total of 85 stations.

As of December 2023, there are 4 lines under construction in Wuxi Metro, namely Wuxi Metro Line 4 Phase 2, Wuxi Metro Line 5 Phase 1, Wuxi Metro Line 6 Phase 1, S2, and S1.

In 2016, the annual passenger volume of Wuxi Metro was 81.468 million, with an average daily passenger volume of more than 223,200. In 2015, its annual passenger volume was 71 million, with an average daily passenger volume of more than 195,000. In the second half of 2014, its annual passenger volume was 17.7025 million, with an average daily passenger volume of more than 97,000. On February 10, 2024, the average daily passenger flow of Wuxi subway lines reached 1,233,400 passengers (but free), exceeding the previous record of 1,103,200 passengers (paying) on December 31, 2023, setting a new record high.

On February 16, 2024, the Wuxi subway network carried 1.4112 million passengers, a record high.[6]

Lines in operation

[edit]
Map of Wuxi Metro
Map of Wuxi Metro
Line Termini
(District)
Commencement Newest
Extension
Length
km
Stations
 1  Yanqiao
(Huishan)
Nanfangquan
(Binhu)
2014 2019 34.6 27
 2  Meiyuan Kaiyuan Temple
(Binhu)
Wuxi East Railway Station
(Xishan)
2014 26.3[7] 21[a]
 3  Sumiao
(Binhu)
Sunan Shuofang International Airport
(Xinwu)
2020 28.5 21
 4  Liutan Wuxi Taihu International Expo Center 2021 25.4 18
 S1 
Yanqiao Jiangyin Waitan 2024 30.4 km 10 [8]
Total 145 97
  1. ^ Anzhen station is not opened.
Map of Wuxi Metro with lines under construction.

Line 1

[edit]

Line 1 runs north to south for 34.6 kilometers (21.5 mi) serving 27 stations. Most of the route is underground, with only 5 stations[3] and 7 kilometers (4.3 mi) running on an elevated alignment. CSR Zhuzhou supplied 23 six-car trainsets for the line.[9]

Line 2

[edit]

Line 2 runs east to west for 26.3 kilometers (16.3 mi)[7] with 21 stations (originally 22 stations, but Anzhen station is not opened), with 6.7 kilometers (4.2 mi) being elevated[7] and the remainder underground. CSR Puzhen supplied a fleet of 120m-long six-car Type B metro trains for the line.[5]

Line 3

[edit]

Line 3 runs east to west for 28.5 kilometers (17.7 mi) with 21 stations. The entire line is underground.

Line 4

[edit]

Line 4 is 25.4 kilometers in length with 18 stations. The entire line is underground.

Line S1

[edit]

Line S1 of Wuxi Metro, also known as Wuxi–Jiangyin intercity railway (无锡至江阴城际轨道交通) or Xicheng line (锡澄线) started construction on October 17, 2019.[10] It will be 30.4 km in length with 9 new stations, including 5 underground stations and 4 elevated stations. The line will run from Yanqiao station on Line 1 to Jiangyin Waitan station in Jiangyin (a county-level city administered by Wuxi).[8] Line S1 will through-operate with Line 1.[10] The line will have distinct express and local services.[11]

Under construction

[edit]
Wuxi Metro Urban Area Planning
S1
S2

Line S2

[edit]

Line S2 of Wuxi Metro, also known as Wuxi–Yixing intercity railway (无锡至宜兴城际轨道交通) or Xiyi line (锡宜线) is under construction. Yixing is a county-level city administered by Wuxi. It will be 59.56 km in length from Yixing railway station to Taihu Xincheng station. Construction of the first phase (Yixing railway station to Zhoutie, about 26 km) started in January 2023.[12]

Route Name Termini Planned Opening Length Stations Status Ref.
 S2  Wuxi–Yixing intercity railway or Xiyi line Zhoutie Yixing Railway Station 2029 59.56 km 9 Under construction[12] [12]

Phase 3 construction plan (2021-2026)

[edit]

The Phase 3 construction plan (2021-2026) of Wuxi Metro will add 59.8 km of new lines and extensions.[13]

Route Name Termini Planned Opening Length Stations Status References
 4  2nd Phase Wuxi Taihu International Expo Center Xishi Road 2025 12.4 km 8 Under Construction [13]
 5  1st Phase Tangcheng Xinyun Road 2026 28.9 km 22 Under Construction [13]
 6  1st Phase Gonghu Wetland Park Guangyuan Road 2028 22.3 km 16 Reviewing [13]

Long-term plans

[edit]

According to the long-term planning of Wuxi Metro, it will form a network of 8 lines and 1 branch line, S1、S2 and the network would be 350 km (220 mi) long in long-term planning.[13]

Lines 1, 2 and 3 would be the main lines, radiating from the city center, while Lines 4,5,6,7,8would be the tangential lines for suburb to suburb traffic. Environmentally friendly and energy efficient designs will be integrated into construction and design of the stations.[14][15][16]

Route Name Termini Planned Opening Length Stations Status References
 2  Wuxi East Railway Station Anzhen
 3  North extension Sumiao Tangpinghu 13.52 8
 3  South extension Sunan Shuofang International Airport
(Xinwu)
Changjiangdonglu
 3  Branch line Sumiao Hudai
 4  3rd Phase Xishi Road Yingyuehu Park
 5  2nd Phase
 6  2nd Phase Guangyuan Road Shixin Road 6.2 4
 7  Planning North Yunlin Guansheshan
 8  Planning Jinghui Temple Yanqiao
Wuxi Metro Overall Planning
[edit]

References

[edit]
  1. ^ "Sina Visitor System".
  2. ^ "Sina Visitor System".
  3. ^ a b c 无锡地铁7月1日开通 全长29.42公里 [Wuxi Metro with a total length of 29.42km opening July 1] (in Chinese). Jiangsu Real Estate Association. 27 June 2014. Retrieved 2014-07-02.
  4. ^ Barrow, Keith (31 December 2014). "Wuxi launches second metro line". International Railway Journal. Retrieved 2015-01-15.
  5. ^ a b "Chinese cities open 10 more metro lines". Railway Gazette International. 31 December 2014. Retrieved 2015-01-15.
  6. ^ "昨天,又创新高了!_澎湃号·政务_澎湃新闻-The Paper". www.thepaper.cn. Retrieved 2024-02-19.
  7. ^ a b c "无锡地铁2号线昨通车 8分钟一班". 2014-12-29.
  8. ^ a b "无锡至江阴城际轨道交通工程《初步设计》汇报结束,为下一步施工图设计打下基础". 2019-07-08.
  9. ^ "Wuxi metro begins trial operation". Railway Gazette International. 29 May 2014. Retrieved 2014-07-01.
  10. ^ a b "锡澄S1线今日正式开工!". 2019-10-17.
  11. ^ "无锡地铁s1号线列车速度- 无锡本地宝". m.wx.bendibao.com (in Chinese (China)). Retrieved 2023-01-14.
  12. ^ a b c ""四线四路"共建,无锡新一轮重大基础设施建设按下"快进键"". 据悉,锡宜S2线全长约58.44公里,全线共设站9座。此次开工的一期工程总体走向为自北向南,线路起自宁杭高铁宜兴站,沿东氿大道、太湖大道、范蠡大道敷设,止于周铁镇,路线全长约26公里
  13. ^ a b c d e "无锡市城市轨道交通第三期建设规划(2021-2026 年)" (PDF). Archived from the original (PDF) on 2021-11-24.
  14. ^ "Wuxi metro". www.wuxinews.com.cn. Retrieved 2017-03-22.
  15. ^ 无锡苏州也将轨交通沪? 目前有规划但尚无时间表. Eastday (in Chinese). 18 October 2013. Retrieved 28 October 2013.
  16. ^ "上海11号线、17号线有望接轨苏州S1线、4号线". sh.sina.com.cn. Retrieved 2016-08-26.
[edit]