Guiyang Metro
Guiyang Metro | |
---|---|
Overview | |
Owner | Guiyang Urban Rail Transit Co., Ltd |
Area served | Baiyun District Guanshanhu District Yunyan District Nanming District Huaxi District |
Locale | Guiyang, Guizhou Province, China |
Transit type | Rapid transit |
Number of lines | 3 |
Number of stations | 82 |
Website | www |
Operation | |
Began operation | December 28, 2017[1] |
Operator(s) | Guiyang Urban Rail Transit Corporation |
Technical | |
System length | 118.73 km (73.78 mi)[2] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 1500 V overhead line |
Average speed | 80 km/h (50 mph) |
The Guiyang Metro is a rapid transit system in the city of Guiyang, Guizhou province, China. It is operated and branded as Guiyang Urban Rail Transit (GYURT).
A short northern section of Line 1 opened on 28 December 2017,[1] with the full line entering operation on 1 December 2018.[3] Line 2 opened on 28 April 2021.[4] Line 3 opened on 16 December 2023.[2] Line S1 and Line T2 are also under construction.[5][6]
Fares
[edit]Fares are determined based on the distance traveled, with a maximum fare of RMB 6. Children under 1.3 meters in height ride for free, while other children pay half-price. Individuals over 70 years old enjoy free travel on public transportation in Guiyang.
Lines in operation
[edit]Line | Terminals (District) |
Commencement | Newest Extension |
Length km |
Stations | |
---|---|---|---|---|---|---|
1 | Douguan (Guanshanhu) |
Xiaomeng Industrial Park (Huaxi) |
2017 | 2019 | 35.11[7][8] | 25 |
2 | North Baiyun Road (Baiyun) |
Zhongxing Road (Nanming) |
2021 | 40.6[4] | 32 | |
3 | Luowan (Wudang) |
Tongmuling (Huaxi) |
2023 | 43.03[2] | 29 |
Line 1
[edit]Line 1 was approved for construction on 6 May 2013, and approved for plan in 2006. The line goes through Guanshanhu, Yunyan, Nanming and Huaxi Districts. The line twice crosses Nanming River and connects the downtown area with a number of outlying districts. The line depots are Xiaohe Depot and Guanshanhu Depot.[1] The railway electrification system uses an overhead line. Line 1 runs northwest to south.
Line 2
[edit]Line 2 is 40.6 km with 32 stations,[9] including 30 underground stations and 2 elevated stations.[10] Line 2 runs north to southeast. It opened on April 28, 2021.[4]
Line 3
[edit]The first phase of Line 3 is 43.03 km in length and has 29 stations. Line 3 runs from northeast to south. It opened on 16 December 2023.[2]
Lines under construction
[edit]Line S1
[edit]The first phase of Line S1 is under construction. It will be 30.32 km in length,[11] including a 22.64 km underground section and 7.68 km elevated section.[12] It is expected to open in 2024.[5]
Line T2
[edit]The first phase of Line T2 is under construction. It will be 10.92 km in length, with 13 stations.[13][14] It is expected to open in 2024.[5]
Future development
[edit]Lines 4, S2, S3, S4, and Line G1 which passes through the Gui'an New Area, are in the planning stage.[15]
See also
[edit]Notes
[edit]References
[edit]- ^ a b c "贵阳地铁今日13时启程" (in Chinese). 黔讯网. 2017-12-28. Archived from the original on 2017-12-28. Retrieved 2017-12-28.
- ^ a b c d "贵阳轨道交通3号线正式开通运营". 中国新闻网. 16 December 2023.
- ^ "贵阳,地铁来了!". news.gzdsw.com. Archived from the original on 2018-11-23. Retrieved 2019-03-19.
- ^ a b c "贵阳轨道交通2号线4月28日全线开通运营". Archived from the original on April 26, 2021.
轨道交通2号线开通初期运营后,贵阳市有2条地铁线路开通运营,全网线路长度增加到75.7公里,其中,1号线35.1公里,2号线40.6公里
- ^ a b c "贵阳地铁3号线一期、S1线一期、T2线一期建成投用时间". 2023-01-09.
确保2023年3号线一期建成投用,2024年S1线一期、T2线一期建成投用
- ^ "贵阳有轨电车T2线正式开工". 贵阳晚报.
- ^ "贵阳市轨道交通1号线全线正式开通初期运营". 2018-12-01. Archived from the original on October 25, 2019.
- ^ "贵阳轨道交通1号线全线开通运营 全长35.11公里设25座车站". 2018-12-01.
- ^ "官宣!贵阳地铁2号线全线试运行,票价及站名公布(附换乘攻略)". Retrieved 2020-12-30.
- ^ "贵阳地铁2号线试运行 部分市民代表参加试乘体验". 2020-12-29.
- ^ "贵阳市轨道交通S1线正式开工!". 2019-11-07.
- ^ "刚刚,贵阳轨道交通S1线正式开工!". 2019-11-07.
- ^ "正公示!贵阳有轨电车T2线一期工程计划8月开工!13座车站公布→".
- ^ "贵阳市有轨电车示范线(T2线一期工程) 首次环境影响评价信息公开". 贵阳轨道交通.
- ^ "贵阳市城市轨道交通远景年线网规划图". 2016-07-11.
External links
[edit]