Line 1 (Xuzhou Metro)
Line 1 | |
---|---|
1 | |
Overview | |
Native name | 徐州地铁1号线 |
Status | Operational |
Locale | Xuzhou, Jiangsu |
Termini | |
Stations | 18 |
Service | |
Type | Rapid transit |
System | Xuzhou Metro |
Rolling stock | 6-car Type B (CRRC Nanjing Puzhen) |
History | |
Opened | 28 September 2019[1] |
Technical | |
Line length | 21.970[2] km (13.652 mi) |
Number of tracks | 2 |
Character | Underground, elevated |
Operating speed | 80 km/h (50 mph) |
Line 1 of the Xuzhou Metro (Chinese: 徐州地铁1号线; pinyin: Xúzhōu dìtiě yī hào xiàn) is a rapid transit line in Xuzhou city, Jiangsu province, China. Construction commenced in February 2014, and the line was opened on September 28, 2019.[1] It is the first metro line to open in Xuzhou.
Line 1 runs primarily east-west through Xuzhou's main commercial areas, from Luwo in the west to Xuzhou East railway station in the east. It connects the old city, Bashan area, Chengdong New Area, People's Square, Huaihai Square, and Pengcheng Square. It also connects to both major railway stations in the city.
Opening timeline
[edit]Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Luwo — Xuzhoudong Railway Station | 28 September 2019 | 21.967 km (13.65 mi)[2] | 18 | Phase 1 |
Line overview
[edit]Station Name | Platform Type | Connections | Location | |
---|---|---|---|---|
English | Chinese | |||
Luwo | 路窝 | Elevated, side | Tongshan | |
Xingshanzi | 杏山子 | Underground, island | S3 | Tongshan / Quanshan |
Hanshan | 韩山 | Quanshan | ||
Gongnonglu | 工农路 | |||
Renminguangchang | 人民广场 | 5 | ||
Sudilu | 苏堤路 | |||
The Affiliated Hospital of Xuzhou Medical University | 徐医附院 | |||
Pengchengguangchang | 彭城广场 | 2 | Gulou / Yunlong | |
Minzhubeilu | 民主北路 | Gulou | ||
Xuzhou Railway Station | 徐州火车站 | 3 | Gulou / Yunlong | |
Zifangshan | 子房山 | Yunlong | ||
Tongshanlu | 铜山路 | |||
Huangshanlong | 黄山垅 | 5 | ||
Qingfenglu | 庆丰路 | |||
Xuzhou Medical University | 医科大学 | |||
Qiaojiahu | 乔家湖 | 4 | ||
Jinlonghu | 金龙湖 | Jiawang | ||
Xuzhoudong Railway Station | 徐州东站 | 6 7 |
History
[edit]As of June 2018, the civil engineering work was reported to be 95% complete, leaving mostly track laying, decorations, and electromechanical installations to be completed.[3] On August 30, 2018, railway work was declared complete, and electromechanical installations and decorations declared as "under intense progress".[4]
References
[edit]- ^ a b "徐州地铁1号线一期9月28日10:00正式开通". 2019-09-26.
- ^ a b "定了,徐州地铁1号线6月7日试运行!". 2019-05-06.
- ^ "轨道公司组织媒体集中报道1号线建设进展情况" [The railway company organized the media to report on the construction progress of Line 1]. Xuzhou Rail Transit (in Chinese). 2018-06-06. Retrieved 2018-07-19.
- ^ "轨道交通1号线一期工程顺利实现"轨通"" [Smooth implementation of railway on Metro Line 1]. Xuzhou Rail Transit (in Chinese). 2018-08-30. Retrieved 2018-08-30.