Lighthouse metro station
This article relies largely or entirely on a single source. (May 2019) |
Chennai Metro station | |||||||||||
General information | |||||||||||
Location | Kamarajar Salai, Mylapore, Chennai, Tamil Nadu | ||||||||||
Owned by | Chennai Metro | ||||||||||
Operated by | Chennai Metro Rail Limited (CMRL) | ||||||||||
Line(s) | Orange Line | ||||||||||
Platforms | Island platforms Platform-1 → Lighthouse metro station Platform-2 → Poonamallee Bypass metro station | ||||||||||
Construction | |||||||||||
Structure type | Underground, Double Track | ||||||||||
History | |||||||||||
Opened | Under construction | ||||||||||
Electrified | Single phase 25 kV, 50 Hz AC through overhead catenary | ||||||||||
Services | |||||||||||
|
Lighthouse Metro station is a Metro railway station under construction in phase II of the Chennai Metro. The station is one among the 30 stations along Line 4 of the Chennai Metro and one of the 12 underground stations in that corridor. It is the terminal station for the stretch between Lighthouse and Poonamallee Bypass. The station will serve the neighbourhoods of Triplicane, Mylapore, and Santhome.
History
[edit]Construction of the station began in 2021. The construction is being funded by Asian Development Bank (ADB).[1] It is expected to open in 2027.[2]
Station
[edit]Lighthouse is an underground metro station situated on Line 4. It will be built at a depth of about 18 to 20 metres below the ground. It will be built at the Dr. Radhakrishnan Salai and Kamarajar Salai junction, beneath the Gandhi statue on the Marina beach.[3]
Station layout
[edit]There will be two entrances for the Lighthouse metro station, one of which will be near the lighthouse.[3]
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Ticket/token, shops |
L2 | Side platform | Doors will open on the left | |
Platform 1 Southbound |
Towards → Poonamalle Bypass next station is Foreshore Estate Road | |
Platform 2 Northbound |
Towards ← Lighthouse Terminus | |
Side platform | Doors will open on the left | ||
L2 |
Facilities
[edit]It was originally estimated that by 2025, about 5,000 people would be using the Lighthouse metro station every day.[3]
Lighthouse track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and one Island platform
|
See also
[edit]References
[edit]- ^ "Kodambakkam to Poonamalee Chennai Metro stretch to be operational by June 2024". The New Indian Express. Chennai: Express Publications. 13 August 2021. Retrieved 30 December 2021.
- ^ Bureau, The Hindu (3 February 2024). "Metro Rail's Light House to Poonamallee corridor likely to be opened by end of 2027". The Hindu. ISSN 0971-751X. Retrieved 16 July 2024.
{{cite news}}
:|last=
has generic name (help) - ^ a b c Sekar, Sunitha (26 April 2019). "Soon, Marina on the Metro map". The Hindu. Chennai: Kasturi & Sons. Retrieved 2 May 2019.
External links
[edit]- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.