Kodigehalli metro station

Coordinates: 13°03′25″N 77°35′38″E / 13.05702°N 77.59386°E / 13.05702; 77.59386
From Wikipedia, the free encyclopedia

Kodigehalli
Namma Metro station
Under construction of this metro station as of October 2024 under Phase 2B of Blue Line of Namma Metro
General information
LocationAmruthnagar, Byatarayanapura, Bengaluru, Karnataka 560092
Coordinates13°03′25″N 77°35′38″E / 13.05702°N 77.59386°E / 13.05702; 77.59386
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line
PlatformsIsland platform (TBC)
Platform-1 → Krishnarajapura / Central Silk Board
Platform-2 → KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningJune 2026; 17 months' time (June 2026) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Hebbal Blue Line
(Future Service)
Jakkur Cross
Location
Map

Kodigehalli is an upcoming important elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. This metro station will mainly serve the Brigade Corporate Offices, consisting of Magnum, Opus, Triumph and Caladium. It also serves prime locations including Aster CMI Hospital, Amruthahalli Lake Park, Godrej Woodsman Estate, RMZ Latitude and many restaurants for the general public. This metro station is slated to be operational around June 2026.[2][3][4][5]

History

[edit]

On November 17 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Kodigehalli metro station, part of the 11.678 km Reach 2B – Package 2 (Hebbala - Bagalur Cross) of the 37.692 km Blue Line of Namma Metro. On September 14 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms. [7]

Station layout

[edit]

Station Layout - To Be Confirmed

Kodigehalli track layout
P#
P#
Station with two tracks and one Island platform
** Under Construction & Proposed
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Ticket/token, shops
L2 Platform #
Northbound
Towards → KIAL Terminals
Next Station: Jakkur Cross
Island platform | Doors will open on the right Disabled access
Platform #
Southbound
Towards ← Krishnarajapura / Central Silk Board
Next Station: Hebbala
Change at the next station for Orange Line
or Red Line

Connections

[edit]

Entry/Exit

[edit]

See also

[edit]

References

[edit]
  1. ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.
  6. ^ "NCC Wins Bangalore Metro Airport Line's Construction Work". The Metro Rail Guy. 14 September 2021. Retrieved 24 October 2024.
  7. ^ Service, Express News (16 September 2021). "Nagarjuna Construction Company wins bid to build Namma Metro's Airport Line". The New Indian Express. Retrieved 24 October 2024.
[edit]
  • BMRCL English - BMRCL Official Website
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.