Jump to content

Yuancun station (Guangzhou Metro)

Coordinates: 23°06′57″N 113°21′49″E / 23.115768°N 113.363663°E / 23.115768; 113.363663
From Wikipedia, the free encyclopedia
Yuancun

员村
Guangzhou Metro
Line 5 platform
Chinese name
Simplified Chinese员村站
Traditional Chinese員村站
Transcriptions
Standard Mandarin
Hanyu PinyinYuáncūn Zhàn
Yue: Cantonese
Yale RomanizationYùhnchyūn Jaahm
JyutpingJyun4cyun1 Zaam6
General information
LocationIntersection of Huacheng Avenue East (花城大道东) and Yuancun 2nd Cross Road (员村二横路), Yuancun Subdistrict
Tianhe District, Guangzhou, Guangdong
China
Coordinates23°06′57″N 113°21′49″E / 23.115768°N 113.363663°E / 23.115768; 113.363663
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Line 5
     Line 11
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code516 1103
History
Opened28 December 2009; 15 years ago (2009-12-28)
(Line 5)
20 December 2019; 5 years ago (2019-12-20)
(Line 21)
28 December 2024; 50 days ago (2024-12-28)
(Line 11)
Closed2 October 2024; 4 months ago (2024-10-02)
(Line 21)
Services
Preceding station Guangzhou Metro Following station
Tancun
towards Jiaokou
Line 5 Keyun Lu
Tianhe Park
Outer Circle
Line 11 Pazhou
Inner Circle

Yuancun station (simplified Chinese: 员村站; traditional Chinese: 員村站; Cantonese Yale: Yùhnchyūn Jaahm) is an interchange station between Line 5 and Line 11 of Guangzhou Metro.[1] It is located under the junction of Huacheng Avenue East (Chinese: 花城大道东) and Yuancun 2nd Cross Road (Chinese: 员村二横路) in Tianhe District. It lies to the east of Zhujiang New Town and to the north of Pazhou,[2][3][4] and was opened on 28 December 2009.[5] Line 11 started operations at this station on 28 December 2024.[6]

Prior to the opening of Line 11, the dismantling work of the section from this station to Tianhe Park of Line 21 took place between 2 October 2024 and 27 December 2024, and the terminus of Line 21 was adjusted north to Tianhe Park. The 6B train type's shielding doors and glass panel false walls of the outer platform were removed, and then the appropriate shielding doors of the 8A train type were installed. At the same time, it was necessary to dismantle the outer platform and the third track between the station and the Tianhe Park station area and replace the signal system to Line 11 standards.[7]

Usage

[edit]

There are many residential communities and natural estates around the station, and there are also many primary and secondary schools nearby, so there is a large number of passengers entering and exiting on weekdays. After the opening of the remaining section of Line 21, the station became an interchange station for Line 5 and Line 21, attracting a large number of passengers to transfer at this station, making the station more congested during peak hours and increasing the passenger pressure of Line 5.[8] After Line 21 was shortened to Tianhe Park in October 2024, the congestion at the station during peak hours was greatly alleviated.[9]

Currently, passenger flow control measures are in place between 07:45 and 09:30 on weekdays.[10]

Station layout

[edit]

Line 5

[edit]
G - Exits B, C, D
L1
Concourse
 5  Lobby Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities, Towards  11  Upper concourse
L2
Platforms
Platform 2 arrow for L  5  towards Jiaokou (Tancun)
Island platform, doors will open on the left
Platform 1  5  towards Huangpu New Port (Keyun Lu) arrow for R
- Station equipment

Line 11

[edit]
G - Exits E & F
L1
Concourse
 11  Upper Lobby Ticket Machines, Customer Service, Shops, Safety Facilities, Towards  5  concourse
Exit A Mezzanine Level Safety Facilities, Towards Exit A and lower concourse
L2  11  Lower Lobby Ticket Machines, Customer Service
L3 - Station equipment
L4
Platforms
Platform 3 arrow for L  11  Inner Circle (Pazhou)
Island platform, doors will open on the left
Platform 4  11  Outer Circle (Tianhe Park) arrow for R

Exits

[edit]
Exit letter Gallery Exit location Nearby
A Yuancun 2nd Cross Road Chengjie West (Yuancun Metro Station) Public Bus Stop (Northbound)
B Yuancun 2nd Cross Road Yuancun Sanheng Road, Yuancun New Street, Yuancun Workers' Cultural Palace, Sixth Affiliated Hospital of Sun Yat-sen University
C Yuancun 2nd Cross Road Chengjie West (Yuancun Metro Station) Public Bus Stop (Southbound)
D Yuancun 2nd Cross Road Linjiang Avenue
E
Yuancun 2nd Cross Road
F Yuancun 2nd Cross Road
[edit]

History

[edit]
Line 21 is undergoing construction behind the enclosed area on the side of the Line 5 concourse

Planning

[edit]

Yuancun Station first appeared in 1997 in the "Guangzhou City Expressway, Traffic Line Planning Study (Final Report)", and the station was located on Line 3 at that time, in which the location was essentially the same as the current one. Later, in the 2003 plan, the original Line 3 was renamed Line 5, and the station was still placed and set for construction.[11] Later, in the 2008 proposal, Line 8, which was planned as a circular line at that time, also passed through this station and became one of the interchange stations with Line 5.[12] Later, in the 2010 plan, the ring line was changed to a completely new project, and the number was adjusted to Line 11. The station thus became an interchange between Lines 5 and 11.[13]

In the further design of Line 21, it was considered that by the time that Line 21 opened, Lines 11 and 13 at its intended terminus at Tianhe Park had not yet been completed and opened, making Line 21 a "dead end" when it reached the terminal station. Therefore, Line 21 temporarily borrowed a section of line from Line 11 by running from Tianhe Park Station to this station, so that Line 21 can interchange with Line 5 and provide better access to the line network. On the eve of the completion of Line 11, the section was dismantled from Line 21 and returned to Line 11 for operation.[14]

Construction

[edit]

On 20 December 2013, the construction of the Line 21 station began, which was the first station of Line 21 to start construction.[15] In response to the construction of the Line 21 station, the original paid area of the Line 5 concourse was changed from the original north side to the south side, the shops were demolished, and the police station was relocated. In July 2018, the main structure of the station of Line 21 was topped out.[16] On 6 December 2018, in order to cooperate with the construction of Line 21, Exit A, which was originally located near Exit D, was closed.[17]

On 20 December 2019, the Line 21 station was opened with the opening of the remaining section of Line 21, and the station code was set as 2101 at the time. Exit A, which was closed earlier, had been relocated to the east side of Yuancun 2nd Cross Road near Shidong Primary School and reopened on the same day.[18]

During the construction of the Line 21 station, a platform that can accommodate 8-car A-type cars (the model used by Line 11) was directly built at the time of construction. Since Line 21 itself uses 6-car group B type cars, the platform screen door is installed according to the 6B-type train, and the extra length is directly closed by the glass plate false wall. During the dismantling and transformation project, the original 6B-type screen door and glass plate false wall of the platform were dismantled, and the screen door suitable for the 8A-type was installed at the same time. Moreover, the contact network required for Line 11 has also been installed in advance by Line 21, the switchback line and the section from this station to Tianhe Park Station, and the third track of the section will be removed and the signaling system used by Line 11 will be replaced at the same time. With the imminent opening of Line 11, on 2 October 2024, the dismantling project of Line 21 will be initiated, and the station body part of Line 21 (platforms 3-4, concourse, Exits A, E, and F) will be temporarily closed until after the opening of Line 11.[19] After this part of the station was transferred to Line 11, the existing storage line will also be used to store the spare trains of Line 11. At the end of the same month, the station renovation project was completed and the "three powers" transfer was completed.[20] On 28 December 2024, the original station body of Line 21 was handed over and resumed with the opening of Line 11.[21]

References

[edit]
  1. ^ Metro Line 5 Opens This December
  2. ^ 廣州地鐵五號線投標申請人報名提交資料一覽表 (in Simplified Chinese).
  3. ^ 2005年度广州市地名命名更名变更 (in Simplified Chinese).
  4. ^ 5号线让员村和CBD更“亲密” (in Simplified Chinese).
  5. ^ Guangzhou Metro line Five to Open in December 2009
  6. ^ 何钻莹 (2024-12-28). ""环"游广州|下一站,天河·员村" ["Circle" Tour of Guangzhou - Next stop, Tianhe·Yuancun]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2025-01-02. Retrieved 2025-02-08.
  7. ^ 李天研 (2024-09-11). "广州首条地铁环线11号线年底开通!10月2日起,21号线"天河公园-员村"段停运拆解" [Guangzhou's first subway loop line, Line 11, will open at the end of the year! Starting from October 2, the "Tianhe Park-Yuancun" section of Line 21 will be dismantled]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-09-11. Retrieved 2024-10-02.
  8. ^ 刘俊 (2019-12-23). "二十一号线开通后,员村站换乘五号线有多难?" [After Line 21 opens, how difficult is it to transfer to Line 5 at Yuancun Station?]. Information Times (in Simplified Chinese). Archived from the original on 2022-05-30. Retrieved 2025-02-08.
  9. ^ 李佳文 (2024-10-08). "广州地铁21号线拆解施工后迎来首个工作日 员村站客流压力大减" [Guangzhou Metro Line 21 welcomes its first working day after dismantling and construction, and passenger flow pressure at Yuancun Station is greatly reduced]. Xin Kuai Bao (in Simplified Chinese). Archived from the original on 2024-10-08. Retrieved 2025-02-08.
  10. ^ 李天研 (2019-12-17). "21号线或周五全线通车" [Line 21 may be fully open to traffic on Friday]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2022-05-28. Retrieved 2025-02-08.
  11. ^ 黄影霞 (2004-04-13). "地铁五号线走向及站点设置向公众咨询 市民都盼家门口设个站" [Metro Line 5's route and station layout open to the public; citizens hope to have a station near their homes]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2004-08-27. Retrieved 2025-02-08 – via Sina Corporation.
  12. ^ 李佳文 (2009-09-14). "广州地铁拟建特大环线 原设想可能放弃" [Guangzhou Metro plans to build a super-large loop line, but the original idea may be abandoned]. Xin Kuai Bao (in Simplified Chinese). Archived from the original on 2022-05-30. Retrieved 2025-02-08 – via Sohu.
  13. ^ 李佳文 (2010-03-04). "广州地铁十年织巨网 两年后新增五条新线路" [Guangzhou Metro has built a huge network in ten years and added five new lines two years later]. Xin Kuai Bao (in Simplified Chinese). Archived from the original on 2022-05-30. Retrieved 2025-02-08 – via Sina Corporation.
  14. ^ 李天研 (2014-02-21). "地铁21号线拿到"出世纸"可动工 首设快慢车" [Metro Line 21 gets the "birth certificate" and can start construction, with first fast and slow trains]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2022-05-30. Retrieved 2025-02-08 – via People's Daily Online.
  15. ^ "二十一号线今日全线开通!七年建设历程全回顾" [Line 21 is fully opened today! A review of the seven-year construction process]. Guangzhou Metro. 2019-12-20. Archived from the original on 2019-12-21 – via Official WeChat Account.
  16. ^ 郭苏莹 (2018-07-24). "广州地铁21号线员村站主体结构封顶 预计年底开通" [The main structure of Guangzhou Metro Line 21 Yuancun Station has been capped and is expected to open by the end of the year]. Information Times (in Simplified Chinese). Archived from the original on 2022-05-30. Retrieved 2025-02-08 – via Sina Corporation.
  17. ^ "悠播报:员村站A口施工围蔽" [Youbo News: Construction enclosure at Exit A of Yuancun Station]. Guangzhou Metro (in Simplified Chinese). 2018-12-05. Archived from the original on 2019-10-31. Retrieved 2025-02-08 – via Sina Online.
  18. ^ 魏星 (2019-12-21). "21号线21座站 广州这条地铁全线开通 增城1小时到市中心" [Line 21 has 21 stations. The Guangzhou Metro line is fully opened. Zengcheng is only 1 hour away from the city center.]. CCTV News (in Simplified Chinese). Archived from the original on 2019-12-24. Retrieved 2025-02-08.
  19. ^ 李天研 (2024-09-11). "广州首条地铁环线11号线年底开通!10月2日起,21号线"天河公园-员村"段停运拆解" [Guangzhou's first subway loop line, Line 11, will open at the end of the year! Starting from October 2, the "Tianhe Park-Yuancun" section of Line 21 will be dismantled]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-09-11. Retrieved 2025-02-08.
  20. ^ 李天研 (2024-11-05). "拆解段站台门"焕新",地铁十一号线全面进入运营调试阶段" [The platform doors of the dismantled section are "renovated" and Metro Line 11 has fully entered the operation and commissioning stage]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-11-05. Retrieved 2025-02-08.
  21. ^ 李天研 (2024-12-25). "定了!广州首条地铁环线12月28日14时开通" [It's settled! Guangzhou's first subway loop line will open at 14:00 on December 28]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-12-26. Retrieved 2025-02-08.
[edit]