Wind power in Scotland

From Wikipedia, the free encyclopedia

Whitelee Wind Farm with the Isle of Arran in the background.
Ardrossan Wind Farm from Portencross, just after sunrise

Wind power is the fastest-growing renewable energy technology in Scotland, with 16,648 megawatts (MW) of installed wind power capacity by Q2 2024. This included 9,756 MW from onshore wind in Scotland and 2,971 MW of offshore wind generators.[1] The largest onshore wind farm in the UK is Whitelee, just south of Glasgow, with 215 turbines and a total capacity of 539 MW.

There is further potential for expansion, especially offshore given the high average wind speeds, and a number of large offshore wind farms are planned. As offshore wind farms are moving into deeper water, floating wind turbines are being used. Hywind Scotland off the coast of Peterhead was the world's first floating offshore wind farm, commissioned in October 2017.[2]

Targets

[edit]

The Scottish Government has achieved its target of generating 50% of Scotland's electricity from renewable energy by 2015, and hoped to achieve 100% by 2020, which was raised from the lower target of 50% in September 2010.[3] The majority of this was expected to come from wind power.[4] Renewables produced the equivalent of 97.4% of Scotland's electricity consumption in 2020, mostly from wind.

The target for 2030, made in 2023, was for 11GW of offshore wind by 2030. This would represent an increase of 400% in offshore wind and a 60% increase in total wind generated power[5] and form part of the 50GW of offshore wind planned by the UK by 2030.[6] The EU North Seas Energy Cooperation group plans on having 76GW in the North Sea by 2030.[7]

Historical Installations

[edit]

The wind turbine was invented by James Blyth and installed at his home in Marykirk in the Mearns, in 1887, leading to a second being installed at the Montrose Lunatic Asylum in 1895 at the Sunnyside Royal Hospital.

The first recorded public electricity system was installed on Wormit hill to supply the houses built by Alexander Stewart who built much of the village[8] This initially consisted of a "Windmill" on Wormit Hill and backup Steam Generator before replacement with a diesel generator in the 1930s.

Contribution to the Scottish Power Grid

[edit]

On Sunday 7 August 2016, a combination of high wind and low consumption caused more wind power generation (106%) than consumption in Scotland. Scottish wind turbines provided 39,545 MWh during the 24 hours of that date, while consumption was 37,202 MWh. It was the first time that measurements were available to confirm that fact. Renewables produced the equivalent of 97.4% of Scotland's electricity consumption in 2020, mostly from wind.[9] In 2020, 3.6 TWh of Scottish wind power was curtailed.[10]

In 2004, wind power produced nearly 850 GWh of electricity in Scotland, around 1.7% of all generation, and by 2010,this had increased to nearly 4.9 TWh (9.9%). In 2017, wind generated over a quarter (27%) of the electricity in Scotland. In 2020 it was 23.1 TWh (45%), although this dropped in 2021 to 19.9 TWh (42%). In 2022, wind generation in Scotland reached 28.8 TWh (55%). Over this period, the total annual electricity generation in Scotland has remained fairly constant, at around 50 TWh.[11]

Graph showing wind generation in Scotland increasing from 1.2TWh (2.6%) in 2005 to nearly 28TWh (55%) in 2022
Graph showing total (TWh, blue crosses, left axis) and share (%, green dots, right axis) of wind power generation in Scotland from 2005 to 2022.[11]

Large wind farms

[edit]

Black Law Wind Farm

[edit]
Two of the wind turbines at the Black Law Wind Farm

The 54-turbine Black Law Wind Farm has a total capacity of 124 MW.[12] It is located near Forth in Lanarkshire and was built on old opencast coalmine site, with an original capacity of 97 MW[13] from 42 turbines. It employs seven permanent staff on site and created 200 jobs during construction. A second phase saw the installation of a further 12 turbines. The project has received wide recognition for its contribution to environmental objectives.[13] Over the period April 2009 to March 2010, Black Law Wind Farm produced 19.19% of its rated capacity.[14]

Braes of Doune Wind Farm

[edit]

The Braes of Doune Wind Farm opened in 2007 and is located close to Stirling. The wind farm has 36 Vestas 2 MW wind turbines. The farm was built and is run by Airtricity.[15]

Clyde Wind Farm

[edit]
Clyde Wind Farm

The Clyde Wind Farm is a 522 MW wind farm near Abington in South Lanarkshire, Scotland. The 152-turbine project by Scottish and Southern Energy,[16] which was approved by the Scottish Parliament in July 2008, is capable of powering 300,000 homes.[17] Turbines have been built either side of the M74 motorway.[18] Construction of the wind farm, which is budgeted for £600 million, started in early 2009 and finished in 2012.[19] The farm was opened at a ceremonial ribbon cutting by First Minister of Scotland Alex Salmond in September 2012.[20]

Crystal Rig Wind Farm

[edit]

Crystal Rig Wind Farm is an operational onshore wind farm located on the Lammermuir Hills in the Scottish Borders region of Scotland. When it was completed in May 2004 it was the largest wind farm in Scotland. As a result of 3 extensions it is currently the 2nd largest wind farm in the UK, both in terms of nameplate capacity and number of turbines. The whole site has 85 turbines and a nameplate capacity of 200.5 MW.

Farr Wind Farm

[edit]

Farr Wind Farm is located some 10 miles south of Inverness, and comprises 40 wind turbines with a total installed capacity of 92 MW. Every year the wind farm generates enough clean electricity to meet the average annual needs of some 54,000 homes.[21]

Hadyard Hill Wind Farm

[edit]
Hadyard Hill wind farm. Located on the B734 between Old Dailly and Barr.

Hadyard Hill Wind Farm, owned and operated by Scottish and Southern Energy (SSE), became the first wind farm in the UK with a capacity of over 100 MW. The 120 MW, 52-turbine wind farm in South Ayrshire cost £85 million and in a year generates enough electricity to power 80,000 homes, sufficient to supply every household in a city the size of York. The production of zero carbon electricity at the wind farm is expected to reduce emissions of carbon dioxide by almost 300,000 tonnes a year, equivalent to taking 70,000 cars off the road.[22]

Novar Wind Farm

[edit]

Novar Wind Farm is a 50 turbine, 53.8MW wind farm located in the Scottish Highlands. Constructed in 1997, Novar was of the earlier developments of Scottish on-shore wind generation. It provided a significant contribution to the local economy during construction and through its Community Benefit Fund. In 2010 an additional 16 turbines were constructed taking the yearly generation capacity to 53.8MW.

Viking Wind Farm

[edit]

The Viking Wind Farm in the Shetland Islands was first proposed as a 600 MW 150 turbine project in 2009. After reduction in scope due to environmental concerns about effects of wildlife and peat bog carbon release during construction, as well as potential interference with equipment at Scatsta Airport the scheme was approved in 2012 as a 103 turbine scheme of 370 MW.[23][24][25] The scheme is expected to achieve high capacity factors due to wind conditions in Shetland, as the Burradale has a capacity factor just over 50%.[26] A high-voltage cable was laid to link Shetland to the UK electricity grid. The subsea cable and 103 turbine scheme capable of generating 443 MW was completed in August 2024.[27]

Whitelee Wind Farm

[edit]

Whitelee Wind Farm, near Eaglesham, East Renfrewshire is the largest on-shore wind farm in the United Kingdom with 215 Siemens and Alstom wind turbines and a total capacity of 539 MW.[28]

There are many other large onshore wind farms in Scotland, at various stages of development, including some that are in community ownership.

A panoramic view of the Whitelee wind farm with Lochgoin Reservoir in the foreground.

Under construction or proposed

[edit]

Whitelaw Brae Wind Farm

[edit]

Whitelaw Brae windfarm is located approximately 3 miles south of Tweedsmuir in the Scottish Borders. It is planned to commence generation in winter 2026/27. The windfarm is funded using a co-operative model by Ripple Energy,[29] allowing for small investments from individuals based on offsetting their own annual electricity consumption. According to project developers BayWa r.e.[30] Whitelaw Brae Wind Farm will feature up to 14 turbines with an expected generating capacity of up to 57 MW, which is enough energy to supply approximately 43,000 homes.

Lethans Wind Farm

[edit]

Lethans Wind Farm, east of New Cumnock was approved in 2020 as the tallest wind farm at 220m with 22 turbines with a capacity of 105MW.[31]

Offshore wind farms

[edit]
REpower 5 MW wind turbine under construction at Nigg fabrication yard on the Cromarty Firth

Scotland is the home to two offshore wind demonstration projects: The two turbine, 10 MW Beatrice Demonstrator Project located in the Moray Firth, and the single turbine, 7 MW Fife Energy Park Offshore Demonstration Wind Turbine in the Firth of Forth. There are also several other commercial-scale and demonstration projects in the planning stages.[32]

Scotland's first offshore wind turbine was placed near the Beatrice Oil Field, 24 km (15 mi; 13 nmi) off the east coast in the Moray Firth, North Sea, in August 2006. This was the world's largest wind turbine at the time, an REpower 5M, with a maximum output of 5 MW. A second identical turbine joined it and the wind farm began supplying electricity in August 2007.[33] As of February 2010, Beatrice Wind Farm is the deepest and northernmost offshore wind installation in the world.[34]

This was the first time such large offshore wind turbines had been tested, and the first time any wind turbine generators have been assembled in such deep (44 metres) water.[35] Such large wind turbine generators are ideally suited to the offshore environment due to high consistent wind speeds and minimal turbulence. According to historical measures of wind speeds at the Beatrice offshore location, it is expected that the turbines will run 96% of the time (8440 hours per year), and at 10 MW full power 38% of the time (3300 hours per year).[35]

In January 2010 contracts were awarded for a major expansion of offshore wind power in the seas around Scotland. Moray Offshore Renewables will develop offshore wind power in the Moray Firth, and SeaGreen Wind Energy will develop offshore wind in the Firth of Forth. These developments could lead to 1,000 new wind turbines generating nearly 5,000 MW of power. Jobs "could also be created in manufacturing, research, engineering, installation, operation and services".[36] In July 2016, RSPB challenged development in the Firth of Forth and Firth of Tay.[37][38]

ScotWind leasing round

[edit]

In January 2022, results of the ScotWind leasing round were announced by Crown Estate Scotland who manage the seabed off the coast of Scotland. Seventeen projects totalling around 25 GW were awarded option agreements, which could raise £700m in option fees. While noting offshore wind has a role to plan in addressing climate change, RSPB Scotland criticised the projects, claiming they could kill hundreds of seabird.[39] In August 2022, a further 2.8 GW from three three floating wind projects to the east of Shetland were awarded in the clearing process.[40] The Scottish Government faced some criticism it was undervaluing the seabed, initially setting the option agreements at up to £10k per km2 although this was revised to £100k per km2 before the auction. Crown Estate Scotland expects that the rent paid by projects that get built, at £1.07 per MWh produced would be more than the £756m in option fees.[41]

INTOG leasing round

[edit]

In 2022, Crown Estate Scotland announced a further leasing round for Innovation and Targeted Oil & Gas (INTOG) projects. Rather than just supplying electricity to the National Grid, these were to help decarbonise North Sea hydrocarbon production. This offered two "pots", firstly for small (less than 100 MW) innovative deep water wind arrays, the "IN" part of INTOG. Secondly, larger Targeted Oil & Gas (TOG) farms supplying power to existing offshore infrastructure.[42][43]

Thirteen projects were offered exclusivity agreements in March 2023.[43] All five small scale innovation (IN) projects with a total capacity of 449 MW signed these by May 2023.[44] In November, seven of the eight TOG projects signed the exclusivity agreements.[45] These projects can now progress with the planning and design stages.

List of INTOG offshore wind projects under development [46][47]
Project name Potential power (MW) Lead developer IN/TOG Location
Aspen 1,008 Cerulean Winds TOG
Beech 1,008 TOG
Cedar 1,008 TOG
Cenos 1,350 Flotation Energy TOG
Culzean 3 TotalEnergies TOG
Flora 50 BP Alternative Energy Investments IN East of Peterhead
Green Volt 560 Flotation Energy TOG
Judy 15 Harbour Energy TOG
Malin Sea Wind 100 ESB Group IN Between Islay and Portrush.[48]
Salamander 100 Simply Blue Energy IN East of Fraserburgh
Scaraben 99.45 BlueFloat Energy/Renantis partnership IN 47 km (29 mi) north of Fraserburgh.[49]
Sinclair 99.45 IN

List of offshore wind farms

[edit]

The complete list of sites including power updates and developer name changes:

Wind farms in Scottish waters
Site Name Potential
power (MW)
Developer Notes
Robin Rigg Wind Farm 180 Statoil Sited at Robin Rigg, a sandbank midway between the Galloway and Cumbrian coasts in the Solway Firth.
60 Vestas V90-3MW wind turbines [50]
Beatrice 588 SSE Renewables plc and Talisman Energy SSE owns 40%, Copenhagen Infrastructure Partners (CIP) (35%) and SDIC Power (25%). Application approved by Marine Scotland in March 2014, Construction to begin early 2017.[51] Fully operational in June 2019[52]
Inch Cape (1000) Repsol Nuevas Energias SA
EDP Renewables
Repsol owns 51%, EDPR owns 49%. Application approved by Marine Scotland in October 2014.
72 V236-15.0 MW turbines.
Hywind Scotland 30 Statoil floating wind farm 15 miles (24 km) off Peterhead Constructed between July and September 2017, power generation started in October 2017.[53][54][55][56] As of 2021, it has averaged a capacity factor in excess of 50%.[57]
Seagreen Offshore Wind Farm 1,075 SSE Renewables 114 Vestas V164-10.0 MW turbines
27km off the Angus coast in the North Sea’s Firth of Forth
Operational from October 2023[58]
Neart Na Gaoithe (450) Mainstream Renewable Power Ltd Application approved by Marine Scotland in October 2014. Scheduled for 2024 [59]
Moray East 950 Ocean Winds, KEPCO, Mitsubishi Corporation Operational as of 2021 [60]
Moray West (882) Scheduled for 2025 [61]
Islay SSE Renewables No further investment from SSE into the project for the foreseeable future.[62]
Solway Firth E.ON Climate & Renewables UK Developments Dormant – Unsuitable for development
Wigtown Bay DONG Wind (UK) Dormant – Unsuitable for development
Kintyre Airtricity Holdings (UK) Ltd Cancelled due to proximity to local communities and Campbeltown Airport[63]
Forth Array Fred. Olsen Renewables Ltd Cancelled. Fred. Olsen pulled out to concentrate on its onshore developments[64]
Bell Rock Airtricity Holdings (UK) Ltd
Fluor Ltd
Cancelled due to radar services in the area.[65]
Argyll Array ScottishPower Renewables Cancelled due to ground conditions and presence of basking sharks[66]
Total 2,200

Community ownership of wind farms

[edit]
The wind turbines at Findhorn, which make the Ecovillage a net exporter of electricity.

Community-owned schemes in Scotland include one on the Isle of Gigha. The Heritage Trust set up Gigha Renewable Energy to buy and operate three Vestas V27 wind turbines, known locally as The Dancing Ladies or Creideas, Dòchas is Carthannas (Gaelic for Faith, Hope and Charity).[67] They were commissioned on 21 January 2005 and are capable of generating up to 675 kW of power. Revenue is produced by selling the electricity to the grid via an intermediary called Green Energy UK. Gigha residents control the whole project and profits are reinvested in the community.[68]

Findhorn Ecovillage has four Vestas wind turbines which can generate up to 750 kW. These make the community net exporters of renewably generated electricity. Most of the generation is used on-site with any surplus exported to the National Grid.[69]

Boyndie Wind Farm Co-operative is part of the Energy4All group, which promotes community ownership.[70] A number of other schemes supported by Community Energy Scotland are in the pipeline.

Debate

[edit]

The siting of turbines is often an issue, but multiple surveys have shown high local community acceptance for wind power in Scotland.[71][72][73] Existing public policy with regard to wind power has become a topic of debate in recent years.

Public opinion surveys

[edit]
Which should be increased in Scotland?[74]

In 2003, MORI Scotland was commissioned by the Scottish Executive to undertake a study examining the attitudes of people living close to Scottish wind farms. The survey showed that people living near Scotland's ten largest wind farms strongly support more of Scotland's energy needs being produced by the wind. 82% wanted an increase in electricity generated from wind power, whilst more than 50% supported an increase in the number of wind turbines at their local wind farm. 20% say their local wind farm has had a broadly positive impact on the area, as opposed to a negative impact (7%).[72]

A survey conducted in 2005, and commissioned by the renewable energy industry, showed that 74% of people in Scotland agree that wind farms are necessary to meet current and future energy needs. When people were asked the same question in a Scottish Renewables study conducted in 2010, 78% agreed. The increase is significant as there were twice as many wind farms in 2010 as there were in 2005. The 2010 survey also showed that 52% disagreed with the statement that wind farms are "ugly and a blot on the landscape". 59% agreed that wind farms were necessary and that how they looked was unimportant. The 2010 study suggests that the majority of people in Scotland are in support of clean energy. However this survey has been widely criticised for its methodology, in that it used a weighting scale such that the opinion those who lived nearer windfarms was rated as of lesser importance.[71][75][76]

In 2013, a YouGov energy survey concluded that:

New YouGov research for Scottish Renewables shows Scots are twice as likely to favour wind power over nuclear or shale gas Over six in ten (62%) people in Scotland say they would support large scale wind projects in their local area, more than double the number who said they would be generally for shale gas (24%) and almost twice as much as nuclear (32%). Hydro power is the most popular energy source for large scale projects in Scotland, with an overwhelming majority (80%) being in favour.[77]

In 2022, an official survey found that 80% of Scots approve of offshore wind farms.[78]

Aesthetics and environmental issues

[edit]
The Ardrossan Wind Farm.

Siting of wind turbines has sometimes been an issue, as most people are concerned about the value of natural landscapes. The John Muir Trust has stated that "the best renewable energy options around wild land are small-scale, sensitively sited and adjacent to the communities directly benefiting from them".[79][80] A small-scale scheme proposed by North Harris development trust has been supported by the John Muir Trust.[81] A 2013 poll carried out by the John Muir Trust, suggests that 75% of Scots would like to see their wild areas protected from further development.[82][83] Wind farm developers sometimes offer "community benefit funds" to help address any disadvantages faced by those living adjacent to wind farms.[84][85][86]

The Ardrossan Wind Farm on the west coast of Scotland has been "overwhelmingly accepted by local people".[87] Instead of spoiling the landscape, local people believe it has enhanced the area. According to one of the town's councillors: "The turbines are impressive looking, bring a calming effect to the town and, contrary to the belief that they would be noisy, we have found them to be silent workhorses".[87]

The £90 million Black Law Wind Farm is located near Forth in Lanarkshire and has been built on an old opencast coalmine site which was completely restored to shallow wetlands during the construction programme. It employs seven permanent staff on site and created 200 jobs during construction.[13]

However, concerns over inappropriate siting of turbines has been voiced by groups in Fife, in particular, where the number of planning applications for turbines has risen sharply.[88] This also is true of Berwickshire, which is home to the second largest windfarm in the UK, Crystal Rig Wind Farm, and where hundreds more turbines are due to be situated, contrary to the wishes of many residents of the county, and the John Muir Trust.[89][90][91]

Also, the siting of turbines in environmentally sensitive areas has led to the deaths of migratory and native birds, such as on Harris where a rare visitor to Scotland, a white-throated needletail was witnessed being killed by a turbine.[92]

Inevitably carbon emissions are produced during construction and transport. Manufacturers typically state that carbon emissions are 'paid back' within 3–18 months of production, but recent research claims that turbines located on peat bogs create incidental emissions that may increase this to 8 years or more.[93] A 2013 financial analysis of utility companies such as the SSE (formerly Scottish and Southern Electricity) concluded that utilities were haemorrhaging cash. Construction of wind farms by the electrical generating industry lead to duplication of existing power plants which were still needed as backup without increasing the utilities customer base or their output.[94]

Scottish Natural Heritage has stated that the decommissioning of ageing turbine structures in the future would be more deleterious to the environment than leaving the bases in place, thus littering Scotland's wild land with concrete which though they could be covered with topsoil, could lead to "oxidising and subsequent staining/contamination" and would lead to irreversible damage to the sensitive peatlands on which many are built. Alternatively, new wind farms could be built on the same site, minimising overall damage.[95]

Tourism impacts

[edit]

Some Scottish wind farms have become tourist attractions. According to a 2002 poll carried out by MORI Scotland, "nine out of ten tourists visiting some of Scotland's top beauty spots say the presence of wind farms makes no difference to the enjoyment of their holiday, and twice as many people would return to an area because of the presence of a wind farm than would stay away". The Whitelee Wind Farm Visitor Centre has an exhibition room, a learning hub, a café with a viewing deck and also a shop. It is run by the Glasgow Science Centre.[96]

Economic impact studies have also been undertaken that looked at the impact of the development of onshore wind on the local tourism sector.[97] This found that wind farms did not harm the employment in the tourism sector in the areas surrounding wind farm and in fact, in the majority of the case studies the tourism sector in the immediate local area performed better than in the wider local authority.

A 2016 study found no connection between tourism and wind power.[98]

Wind variability

[edit]

Most turbines in the European Union produce electricity at an average of 25% of their rated maximum power due to the variability of wind resources,[99] but Scotland's wind regime provides average capacity factor of 31% or higher on the west and northern coasts. The load factor recorded for the onshore North Rhins windfarm near Stranraer was 40%, which is typical for well-sited mainland windfarms. A small wind farm in Shetland with five Vestas V47 660 kW turbines recently achieved a world record of 58% capacity over the course of a year. This record is claimed by Burradale windfarm, located just outside Lerwick and operated by Shetland Aerogenerators Ltd. Since opening in 2000, the turbines at this wind farm have had an average capacity factor of 52% and, according to this report, in 2005 averaged a world record 57.9%.[26][100] However, a Scottish opposition group found 124 separate occasions from 2008 to 2010 when the nation's wind output fell to less than 2% of installed capacity.[101] On the west and northern coasts Scotland's wind regime can provide an average of 40% or higher.

Potential

[edit]

It is estimated that 11.5 GW of onshore wind potential exists, enough to provide about 45 TWh of energy in a year, allowing for wind variability. More than double this amount exists on offshore sites[102] where mean wind speeds are greater than on land.[103] The total offshore potential is estimated at 25 GW, and although more expensive to install could be enough to provide almost half the total energy used in Scotland.[102]

According to a recent report, the world's wind market offers many opportunities for Scottish companies, with total global revenue over the next five years estimated at £35 billion and continued growth forecast until at least 2025.[104]

See also

[edit]

References

[edit]
  1. ^ "Energy Trends: UK renewables. Renewable electricity capacity and generation (ET 6.1 - quarterly)". GOV.UK. 14 November 2024. Retrieved 30 November 2024.
  2. ^ Snieckus, Darius (18 October 2017). "World's first floating wind farm powers up off Scotland". rechargenews.com. Aberdeen. Retrieved 30 November 2024.
  3. ^ "Target for renewable energy now 80 per cent". Scottish Government. 23 September 2010. Archived from the original on 10 May 2013. Retrieved 15 November 2010.
  4. ^ Europe's Largest Onshore Wind Farm Is Switched on in Scotland Archived 11 September 2014 at the Wayback Machine Renewable Energy World, 20 May 2009.
  5. ^ "Ministers downgrade Scottish offshore energy projection". BBC News. 13 November 2023.
  6. ^ "Offshore wind". Retrieved 14 November 2023.
  7. ^ "The North Seas Energy Cooperation". Retrieved 14 November 2023.
  8. ^ "Wormit from the Gazetteer for Scotland". Archived from the original on 14 November 2020. Retrieved 13 November 2020.
  9. ^ "Renewables met 97% of Scotland's electricity demand in 2020". BBC News. 25 March 2021. Archived from the original on 3 June 2021. Retrieved 31 March 2021.
  10. ^ Lempriere, Molly (25 June 2021). "Drax to expand pumped storage hydro station Hollow Mountain". Solar Power Portal. Archived from the original on 25 June 2021.
  11. ^ a b "Energy Trends: December 2023, special feature article - Electricity generation and supply in Scotland, Wales, Northern Ireland and England, 2018 to 2022". GOV.UK. 21 December 2023. Retrieved 1 December 2024.
  12. ^ "Press Releases". scottishpowerrenewables.com. Archived from the original on 21 October 2019. Retrieved 29 May 2018.
  13. ^ a b c "UK's most powerful wind farm could power Paisley". bwea.com. Archived from the original on 20 January 2012. Retrieved 4 July 2007.
  14. ^ "UK Renewable Energy Generation - Summary April 2009 to March 2010" (PDF). clowd.org.uk. Archived from the original (PDF) on 4 March 2011. Retrieved 6 January 2011.
  15. ^ "Braes of Doune". airtricity.com. Archived from the original on 21 November 2008. Retrieved 10 March 2009.
  16. ^ "SSE Clyde Wind Farm website". Archived from the original on 10 April 2018. Retrieved 16 July 2015.
  17. ^ Haworth, Jenny (22 July 2008). "Wind farms: now we've got the biggest in Europe". Archived from the original on 8 June 2011. Retrieved 22 July 2008.
  18. ^ Johnson, Simon (21 July 2008). "Europe's largest onshore wind farm is to be built in Scotland costing £600m". The Daily Telegraph. London. Retrieved 22 July 2008.[dead link]
  19. ^ "Green light for massive wind farm". BBC News. 21 July 2008. Archived from the original on 20 February 2009. Retrieved 22 July 2008.
  20. ^ "Salmond opens SSE's Clyde wind farm". Archived from the original on 8 October 2012. Retrieved 8 June 2013.
  21. ^ AG, RWE. "RWE Group - Corporate Website". npower-renewables.com. Archived from the original on 3 October 2009. Retrieved 10 March 2009.
  22. ^ "Hadyard Hill becomes the first wind farm in the UK to generate over 100 MW of power". bwea.com. Archived from the original on 20 November 2010. Retrieved 5 July 2007.
  23. ^ "Viking wind farm approved". The Government of Scotland. 4 April 2012. Archived from the original on 7 April 2012. Retrieved 8 April 2012.
  24. ^ "Shetland wind farm plans by Viking Energy approved by Scottish government". BBC News. 4 April 2012. Archived from the original on 6 April 2012. Retrieved 8 April 2012.
  25. ^ Carrell, Severin (4 April 2012). "Shetland Islands to host 'world's most productive' windfarm". The Guardian. London. Archived from the original on 3 December 2013. Retrieved 8 April 2012.
  26. ^ a b "Burradale Wind Farm Shetland Islands - REUK.co.uk". reuk.co.uk. Archived from the original on 10 February 2007. Retrieved 23 May 2007.
  27. ^ "New Shetland windfarm could power nearly 500,000 homes". BBC News. 28 August 2024. Retrieved 24 November 2024.
  28. ^ http://www.whiteleewindfarm.co.uk/about_windfarm?nav Archived 27 February 2014 at the Wayback Machine Whitelee Windfarm
  29. ^ "Ripple Energy | Whitelaw Brae Wind Farm".
  30. ^ "Whitelaw Brae Wind Farm | About the Project | BayWa r.e."
  31. ^ "Scotland's tallest wind farm given green light in East Ayrshire". Scottish Construction Now. 20 October 2020. Archived from the original on 1 November 2020. Retrieved 30 November 2020.
  32. ^ Scottish Government (8 December 2009). "Current Marine Renewable Energy Projects". gov.scot. Archived from the original on 15 July 2015. Retrieved 15 July 2015.
  33. ^ "beatricewind.co.uk - beatricewind Resources and Information". beatricewind.co.uk. Archived from the original on 8 November 2019. Retrieved 8 February 2010.
  34. ^ "Beatrice is currently the northernmost and deepest offshore wind farm in the world". myiris.com. Archived from the original on 14 July 2011. Retrieved 24 November 2021.
  35. ^ a b "Worlds Largest Wind Turbine Generator - REUK.co.uk". reuk.co.uk. Archived from the original on 11 June 2007. Retrieved 23 May 2007.
  36. ^ New offshore wind farm contracts announced Archived 4 March 2016 at the Wayback Machine BBC News, 8 January 2010.
  37. ^ "Wind farm legal challenge victory". BBC News. 19 July 2016. Archived from the original on 29 October 2018. Retrieved 20 June 2018.
  38. ^ "Scots offshore wind 'pretty much dead'". BBC News. 20 July 2016. Archived from the original on 11 November 2018. Retrieved 20 June 2018.
  39. ^ "ScotWind offshore auction raises £700m". BBC News. 17 January 2022. Retrieved 24 November 2024.
  40. ^ Tisheva, Plamena (22 August 2022). "ScotWind leasing round awards further 2.8 GW via clearing". Renewables Now. Retrieved 24 November 2024.
  41. ^ "What is ScotWind and why was it controversial?". theferret.scot. 2 February 2024. Retrieved 24 November 2024.
  42. ^ Snieckus, Darius (10 August 2022). "Scotland leaves harbour on world's first auction for floating wind-fuelled oil & gas projects". rechargenews.com. Retrieved 30 November 2024.
  43. ^ a b "Offshore wind farm leasing round expected to raise £260m". BBC News. 24 March 2023. Retrieved 30 November 2024.
  44. ^ Buljan, Adrijana (22 May 2023). "Scottish INTOG Innovation Projects Clear First Stage with Crown Estate Scotland". Offshore Wind. Retrieved 30 November 2024.
  45. ^ Memija, Adnan (29 November 2023). "Seven INTOG Offshore Wind Projects Ink Exclusivity Agreements". Offshore Wind. Retrieved 30 November 2024.
  46. ^ "INTOG Map and Applicant Listing" (PDF). Crown Estate Scotland. November 2023. Retrieved 30 November 2024.
  47. ^ "Offshore wind - UK offshore wind farm projects from leasing rounds through to operational phases". The Crown Estate. 30 September 2024. Retrieved 30 November 2024.
  48. ^ "Project Information". Malin Sea Offshore Wind. Retrieved 30 November 2024.
  49. ^ "BlueFloat Energy | Renantis Partnership Signs Exclusivity Agreements to Develop Its Sinclair and Scaraben 'INTOG' Projects". www.bluefloat.com. 19 May 2023. Retrieved 30 November 2024.
  50. ^ "Robin Rigg Wind Farm website". Archived from the original on 16 July 2015. Retrieved 16 July 2015.
  51. ^ "Major boost to far north economy as Nigg is awarded Beatrice contract – and Helmsdale may benefit too". northern-times.co.uk. Archived from the original on 20 December 2016. Retrieved 28 June 2016.
  52. ^ "Beatrice Offshore Windfarm Ltd". beatricewind.com.
  53. ^ Harrabin, Roger (23 July 2017). "World's first floating wind farm emerges off coast of Scotland". BBC News. Archived from the original on 6 August 2018. Retrieved 23 July 2017.
  54. ^ "Nå starter monteringen av Statoils flytende vindmøller". SYSLA. 17 February 2017. Archived from the original on 21 February 2017. Retrieved 20 February 2017.
  55. ^ "Floating turbines deliver first electricity". BBC News. 18 October 2017. Archived from the original on 21 August 2019. Retrieved 18 October 2017.
  56. ^ Geuss, Megan (18 October 2017). "First floating wind farm, built by offshore oil company, delivers electricity". Ars Technica. Archived from the original on 18 October 2017. Retrieved 18 October 2017.
  57. ^ "UK offshore wind capacity factors – Energy Numbers". energynumbers.info. 1 March 2021. Archived from the original on 23 May 2021.
  58. ^ "Scotland's largest offshore wind farm now fully operational". 17 October 2023.
  59. ^ EDF Renewables. "About Neart Na Gaoithe". nngoffshorewind.com. Retrieved 9 February 2021.
  60. ^ "Moray East Offshore Wind Farm Achieves Full Output". Offshore Engineer Magazine. 7 April 2022. Archived from the original on 9 May 2022.
  61. ^ renews.bix (3 October 2023). "Installation works kick off at Moray West".
  62. ^ "Review of offshore wind farm development". sse.com. Archived from the original on 12 January 2015. Retrieved 9 June 2015.
  63. ^ BBC News report-SSE ditches plans for Kintyre offshore wind farm. BBC.co.uk (1 March 2011).
  64. ^ Fred.Olsen Forth Array News Archived 11 July 2011 at the Wayback Machine. Fortharray.com.
  65. ^ Staff Writer. "Bell Rock Offshore Wind Farm". 4C Offshore. Retrieved 26 January 2023.
  66. ^ "Welcome". argyllarray.com. 29 April 2015. Retrieved 9 June 2015.
  67. ^ "Let's Talk Renewables" (PDF). HIE. Archived from the original (PDF) on 7 April 2008. Retrieved 6 January 2008.
  68. ^ "Green Energy press release". greenenergy.uk.com. 26 January 2005. Archived from the original on 21 December 2006. Retrieved 1 February 2007.
  69. ^ "Ecovillage Findhorn". ecovillagefindhorn.com. Archived from the original on 18 October 2019. Retrieved 6 July 2007.
  70. ^ Boyndie Co-operative Archived 10 October 2012 at the Wayback Machine Retrieved 6 July 2007.
  71. ^ a b "Rise in Scots wind farm support". BBC News. 18 October 2010. Archived from the original on 18 September 2018. Retrieved 20 June 2018.
  72. ^ a b Scottish Government (2003). "Public Attitudes to Windfarms: A Survey of Local Residents in Scotland". Archived from the original on 4 October 2012. Retrieved 13 July 2012.
  73. ^ Scottish Renewables (22 October 2010). "Scots support wind farms". Sustainable Scotland. Archived from the original on 19 January 2013. Retrieved 31 March 2012.
  74. ^ Braunholtz, Simon (2003) Public Attitudes to Windfarms Archived 24 January 2013 at the Wayback Machine. Scottish Executive Social Research.
  75. ^ "Scots support wind farms". Sustainable Scotland. 22 October 2010. Archived from the original on 19 January 2013. Retrieved 31 March 2012.
  76. ^ "Public Perceptions ✭ - WAG - Windfarm Action Group - the growing blight on the good earth ☯". windfarmaction.com. Archived from the original on 4 March 2016. Retrieved 22 August 2012.
  77. ^ Cordelia Nelson (20 March 2013). "Scots support renewable energy". YouGov. Archived from the original on 25 April 2013. Retrieved 22 June 2013.
  78. ^ Buljan, Adrijana (10 August 2022). "Scots Overwhelmingly Pro-Offshore Wind". Offshore Wind.
  79. ^ "What's Your View on Wild Land?". Pitlochry: John Muir Trust. 2006. Archived from the original on 18 May 2007. Retrieved 13 November 2007.
  80. ^ John Muir Trust. "Renewable Energy Policy". Archived from the original on 16 May 2008. Retrieved 20 April 2008.
  81. ^ "North Harris Community Wind Farm Approved". John Muir Trust. 18 February 2008. Archived from the original on 6 January 2011. Retrieved 21 April 2008.
  82. ^ "Public 'backs wild land turbine ban'". BBC News. 26 June 2013. Archived from the original on 16 July 2018. Retrieved 20 June 2018.
  83. ^ "Scotsman. Retrieved 27 June 2013". Archived from the original on 30 June 2013. Retrieved 27 June 2013.
  84. ^ "Wind farm community benefits". berwickshirenews.co.uk. Archived from the original on 10 June 2013. Retrieved 19 September 2012.
  85. ^ "Residents 'devastated' at wind farm decision". berwickshirenews.co.uk. Archived from the original on 10 June 2013. Retrieved 19 September 2012.
  86. ^ "Uproar over wind farm vote". berwickshirenews.co.uk. Archived from the original on 10 June 2013. Retrieved 19 September 2012.
  87. ^ a b Gourlay, Simon (11 August 2008). "Response: Wind farms are not only beautiful, they're absolutely necessary". The Guardian. Archived from the original on 5 October 2013. Retrieved 13 December 2016.
  88. ^ "Eftag - Collection of Chair Design Ideas". Eftag. Archived from the original on 26 February 2021. Retrieved 24 November 2021.
  89. ^ "Petition to protect the country's wild lands". berwickshirenews.co.uk. Archived from the original on 13 December 2012. Retrieved 1 July 2012.
  90. ^ "Fallago Rig wind farm development sold". BBC News. 2 February 2012. Archived from the original on 12 November 2018. Retrieved 20 June 2018.
  91. ^ "Scottish Borders Council windfarm applications up to 1 July 2012". scotborders.gov.uk. Archived from the original on 4 October 2013. Retrieved 1 July 2012.
  92. ^ "Twitchers see rare bird hit turbine". BBC News. 27 June 2013. Archived from the original on 28 October 2018. Retrieved 20 June 2018.
  93. ^ Douglas E. (8 July 2006) "Gone with the Wind". London. New Scientist.
  94. ^ Evans, Richard (4 May 2013) Experts warn of threat to utility shares' income Archived 22 July 2018 at the Wayback Machine The Telegraph. Retrieved 7 May 2013
  95. ^ Johnson, Simon (25 June 2013). "Old wind farms bases 'could be left in countryside'". The Daily Telegraph. Archived from the original on 30 May 2018. Retrieved 2 April 2018.
  96. ^ "Whitelee Windfarm". Scottish Power Renewables. Archived from the original on 2 March 2012. Retrieved 9 March 2012.
  97. ^ BiGGAR Economics (26 July 2016). "Onshore Wind Energy and Tourism in Scotland". BiGGAR Economics. Archived from the original on 7 August 2016. Retrieved 2 August 2016.
  98. ^ "Onshore Wind Energy & Tourism in Scotland". Biggar Economics. 26 July 2016. Archived from the original on 7 August 2016. Retrieved 10 August 2016. Report Archived 12 July 2017 at the Wayback Machine
  99. ^ "ECN report on Renewables" (PDF). Archived (PDF) from the original on 8 November 2006. Retrieved 4 February 2007.
  100. ^ Severin Carrell (20 May 2009), "Shetland stirred by giant Viking wind farm plan", The Guardian, London, archived from the original on 12 December 2013, retrieved 8 April 2012
  101. ^ "Analysis of UK Wind Generation" Archived 16 January 2017 at the Wayback Machine 2011
  102. ^ a b RSPB Scotland, WWF Scotland and FOE Scotland (February 2006) The Power of Scotland: Cutting Carbon with Scotland's Renewable Energy.
  103. ^ "Global wind power at 80 m". stanford.edu. Archived from the original on 25 May 2008. Retrieved 23 May 2007.
  104. ^ "Huge potential growth forecast for Scottish wind industry". scottish-enterprise.com. Archived from the original on 4 March 2016. Retrieved 23 May 2007.
[edit]