Jump to content

Template talk:East Lancashire Line

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Accrington

[edit]

Accrington station was triangular, with platforms on two of the three sides, but this RDT has been drawn with a station dot on only one side, that between Church and Huncoat. The missing platforms were on the south-to-east curve, that is, the side used by trains running from Bury to Colne. The RDT should be fixed to reflect that; but I don't know the best way of doing it. The station dot should be drawn in pink, to denote that the platforms are closed. --Redrose64 🌹 (talk) 21:27, 4 June 2023 (UTC) [reply]

Rishton Tunnel
Rishton- first station
Rishton- second station
Church and Oswaldtwistle
Great Harwood
Accrington
Simonstone
Huncoat- second station
Huncoat- first station
Hapton
Padiham
Rose Grove
@Redrose64: With reference to [1], Like this? — Preceding unsigned comment added by Bazza 7 (talkcontribs) 15:47, 5 June 2023 (UTC)[reply]
@Bazza 7: Yes, that's right. --Redrose64 🌹 (talk) 21:39, 5 June 2023 (UTC)[reply]
@Redrose64: Done. Bazza (talk) 08:24, 6 June 2023 (UTC)[reply]
Thank you --Redrose64 🌹 (talk) 11:41, 6 June 2023 (UTC)[reply]