Jump to content

Talk:U.S. Route 72

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Downtown Memphis Graphic

[edit]

I was just in Memphis and the signage for US64/70/79 differs from the map graphic. According to the signage, 64/70/79 follow TN 3 all the way to TN 14, then go south and not TN 1/TN 4


Exit list

[edit]
StateCountyLocationmikmExitDestinationsNotes
TennesseeShelbyMemphis US 64 / US 70 / US 79 – Chattanooga, Nashville, Clarksville, Downtown MemphisWestern terminus; west end of SR 57 concurrency
SR 23
I-240 – Jackson, Miss, NashvilleInterchange, I-240 exit 15
Germantown SR 177 – Germantown, Southaven
Collierville SR 57East end of SR 57 concurrency
SR 385Interchange
I-269 – Hernando, MemphisInterchange
 
0.00

0.00
Tennessee-Mississippi state line
MississippiMarshallByhalia
MS 302 west – Hernando
Eastern terminus of MS 302
Holly Springs
MS 311 south – Holly Springs
Northern terminus of MS 311
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Error regarding MS 5 concurrency on US-72 - Major Intersections

[edit]

Per https://wiki.riteme.site/wiki/Mississippi_Highway_5 Mississippi State Highway 5 terminates at US-72 in Benton County, Mississippi. Major Intersections shows a short concurrency, and then the route continuing north. However, the route was truncated in 1943. There is no signage on US-72 to indicate that MS-5 goes anywhere beyond that eastern junction in Benton County. If someone can find any additional verification for this, and please correct the table. Editing tables is beyond my capabilities. Thanks! 504roadtrips (talk) 15:11, 2 September 2023 (UTC)[reply]