Talk:Tunnel A1 (Ivan)
Appearance
This article is rated Stub-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | |||||||||||||||||||||||||||||||
|
Tunnel Ivan beginning redesign this year!
[edit]As of January 2020, preparations have begun on Hercegovina point of the tunnel (Tarcin). Tunnel Ivan will take 30 months to upgrade the tunnel.[1] User:AustroHungarian1867
Categories:
- Stub-Class AfC articles
- AfC submissions by date/29 January 2020
- Accepted AfC submissions
- Stub-Class Bosnia and Herzegovina articles
- Unknown-importance Bosnia and Herzegovina articles
- All WikiProject Bosnia and Herzegovina pages
- Stub-Class Transport articles
- Unknown-importance Transport articles
- WikiProject Transport articles