Jump to content

Talk:Toronto Pearson Terminal 1 station

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia
[edit]

Maybe this article should refer to the combined complex of the UP Express and LINK stations? For example, it would be built in 2006 for LINK, and expanded in 2015 for UPX. Reaperexpress (talk) 22:14, 5 June 2014 (UTC)[reply]

I think you are right. Much of the structure was already in place and it is really an expansion of the existing station served by the LINK Train. The Union Pearson Express station is built between the people mover tracks where concrete foundations had been already been roughed in. You have cut a lot of ballast out of this already, so you shuld continue to tell the full story. Secondarywaltz (talk) 22:31, 5 June 2014 (UTC)[reply]

Move discussion in progress

[edit]

There is a move discussion in progress on Talk:Toronto Pearson Viscount Station which affects this page. Please participate on that page and not in this talk page section. Thank you. —RMCD bot 01:32, 6 February 2018 (UTC)[reply]