Jump to content

Talk:Telangana Super Thermal Power Project

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Please edit with the following content.

[edit]

Ramagundam Power Complex, Peddapalli district. 1. NTPC 2600MW Thermal Power stn. 2. TSTPP (1600MW under construction + 2400 MW under proposal). 3. RTS B power house : 62.5 MW. 4. Singareni power stn : 18 MW. 5. NTPC : 10 MW solar PV stn.

   ( 15 MW PV under proposal).

Merger Discussion

[edit]

Request received to merge articles: Telangana Super Thermal Power Project into NTPC Limited; dated: September 2024. Proposer's Rationale: Owned by NTPC and there is little to no reason to have separate article, All plants are owned by one company. Discuss here. Thewikizoomer (talk) 18:39, 23 September 2024 (UTC)[reply]

The reasoning that ownership alone negates the need for a separate article is flawed. NTPC owns over 40 power plants, each with its own unique history, specifications, and role in the power grid, which merits individual coverage. By this logic, assets like ships and submarines wouldn't require separate articles simply because they belong to a Navy, which clearly is not the case. Just as vessels have distinct operational details and historical relevance, power plants, including Telangana Super Thermal Power Station, deserve their own space on Wikipedia to provide comprehensive information to readers. Consolidating all into the parent company's article would diminish the depth of detail that each asset offers. iAshwinDeshmukh Deshmukh.3851 talk 22:11, 24 September 2024 (UTC)[reply]
Closing, given the uncontested objection with no support and stale discussion. I also note that omnibus disucssions are much more efficient than multiple distinct discussions on several pages. Klbrain (talk) 18:43, 5 December 2024 (UTC)[reply]