From Wikipedia, the free encyclopedia
(Redirected from Michael Nagar metro station)

Kolkata Metro Line 4
----
Yellow Line
Under construction Yellow Line near Bagjola canal
Overview
StatusUnder construction
OwnerIndian Railways
LocaleIndia Kolkata Metropolitan Region, India
Termini
Connecting linesBlue Line Orange Line
Stations10
WebsiteIndian Railways
Service
TypeRapid transit
SystemKolkata Metro
Operator(s)Metro Railway, Kolkata
Depot(s)
  • Noapara Depot
  • Airport Depot (under construction)
  • Barasat Depot (planned)
History
Planned openingMarch 2025
Technical
Line length
  • 18.13 km (11.27 mi)
    -Under construction:6.87 km (4.27 mi)
    -Planned:11.26 km (7.00 mi)[1]
Number of tracks2
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification750 V DC[2] using third rail
Operating speed80 km/h (designed)
SignallingTPWS signalling (initially)
CBTC signalling (in future)
Route map
Noapara
Kestopur Canal
Dum Dum Cantonment
Jessore Road
Jai Hind Netaji Subhas Chandra Bose International Airport Bus interchange
Birati
Michael Nagar
New Barrackpur
Noai Canal
Madhyamgram
Hridaypur
Barasat Bus interchange

(Click to expand)

Line 4 (Yellow Line) is a rapid transit metro line of the Kolkata Metro in Kolkata, West Bengal, India. It is a 16.876 km (10.486 mi)[1] long line from Noapara to Barasat in North 24 Parganas, which is under construction. It is being built by RVNL, Senbo & ITD.[3] It will run mostly on underground tunnels, the track will be elevated until Jessore Road from Noapara and then go underground towards Barasat metro station. It will have an interchange at the Kolkata Airport with Orange Line.

Stations

[edit]

The stations of this corridor are:

Line 4 (Yellow Line)
No. Station Name Location Phase Opening Connections Layout Coordinates Notes
English Bengali
1 Noapara নোয়াপাড়া Noapara 1 10 July 2013
  • Blue Line
    • 34C Bus Stand
    • Health Care More Bus Stop
    • Gharui Paschimpara Bus Stop
Elevated
2 Dum Dum Cantonment দমদম ক্যান্টনমেন্ট Dum Dum Cantonment Trial run started from 14th December 2024 (March 2025 expected for commercial operation)
3 Jessore Road যশোহর রোড NSCB International Airport (Gate No. 1)
  • H.M.V. Gate Bus Stop
    • Airport Gate No. 1 Bus Stop
At grade Previously suburban rail used to operate in this line
4 Jai Hind জয় হিন্দ NSCB International Airport
  • Orange Line (under construction)
    • Airport AC Bus Stand
    • Airport Gate No. 1 Bus Stop
    • Airport Gate No. 2 Bus Stop
    • Airport Gate No. 2.5 Bus Stop
    • Airport Gate No. 3 Bus Stop
Underground
5 Birati বিরাটি Birati 2 Under construction
  • Birati More Bus Stop
  • Gouripur Bus Stand
6 Michael Nagar মাইকেল নগর Michael Nagar
  • Bankra Bus Stop
  • Bankra Madni Nagar Bus Stop
7 New Barrackpur নিউ ব্যারাকপুর New Barrackpore
  • B.T. College Bus Stand
  • Sukanta Nagar Bus Stop
8 Madhyamgram মধ্যমগ্রাম Madhyamgram 3 Planned
9 Hridaypur হৃদয়পুর Hridaypur
10 Barasat বারাসাত Barasat

Progress of Dum Dum Cantonment metro station

[edit]
Dum Dum Cantonment metro station

An amount of Rs 227 crore contract to build this station along with a mostly at-grade 2.16 km (1.34 mi) section from the Bagjola Canal to the existing ramp of the Airport Circular Railway track was awarded to Senbo Engineering Limited all the way back in June 2011. Since then, the station’s civil structure has been built, but work for the at-grade track section could not be started due to land acquisition issues along the line’s proposed alignment. But the rehabilitation work has completed in 2020, and the work is going smoothly. Recently girders were placed over Eastern Railway tracks. The metro station is set to be operational by 2024.

Project development

[edit]

Planning

[edit]

According to the plan, This line suppose to be a 'Circular' line. This line suppose to be start from Dum Dum metro station as single elevated line. Then this line go along the eastern railway till Dum Dum Cantonment railway station. Then it suppose to be go through then-existing same railway tracks and same stations (all will be elevated). Then after Biman Bandar railway station this line suppose to be turn left and continue through Belghoria Expressway. Above it two metro station named Shantinagar and Ramkrishna Palli were planned. Then line suppose to be turn left again near Baranagar to enter today's Noapara metro station. And then this line suppose to continue till Dum Dum metro station and terminate here.

Project development

[edit]

The project will be completed in three phases. The first phase of work from Noapara to Biman Bandar is under progress. In the second phase work from Biman Bandar to New Barrackpore will be done and in the last phase from New Barrackpore to Barasat work will be done. But the development work from New Barrackpore to Barasat got struck for the last eight years since it was sanctioned because of encroachments[4] and the Airport Authority of India objected the elevated stretches from New Barrackpore to Barasat. Later, after objections from AAI, a decision was taken to convert this into an underground stretch. On 29 June 2019 sanction for material modification for underground construction at an additional cost of 1,615 crore (US$190 million) was sent to Railway Board by Metro. For this underground tunneling AAI has agreed to shift their fuel tanks, buildings and cables and the project is expected to be started from 2020.[5]

Construction of an underground integrated station for Line 6 and Line 4 has begun at NSCBI Airport land just 150 metres (492 ft) away from the terminal building.

'The development of New Barrackpore to Barasat was supposed to go elevated to cut down the expenses, but the stretch was in doubt due to huge encroachment problem. But in February 2021, Prime Minister Narendra Modi gave his nod to construct this stretch underground, giving respite to thousands of families who were supposed to be evicted for the development of the elevated stretch.[6] In order to lower the cost of the underground work, latest technology TBM will not be used, instead old technology of cut and cover method will be used for metro.[7]

Line 4 has been divided into three phases now.

  • Phase 1: Noapara - Biman Bandar (Trial run done, finishing work is ongoing, commercial runs to begin soon)
  • Phase 2: Biman Bandar - New Barrackpore (under construction till Michael Nagar; Michael Nagar - New Barrackpur section is waiting for AAI approval)
  • Phase 3: New Barrackpore - Barasat (stucked for land acquisition)

See also

[edit]

References

[edit]
  1. ^ a b "New System Map of Kolkata Metro".
  2. ^ "CAF to supply Kolkata metro trains".
  3. ^ "Senbo Engg wins ₹532 crore underground civil contracts for Kolkata Metro Line 4 | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 12 April 2023.
  4. ^ Gupta, Jayanta (23 July 2019). "Kolkata: Metro to run below surface after airport". The Times of India. Retrieved 25 March 2020.
  5. ^ "Metro to run below surface after airport". Times of India. 26 July 2019.
  6. ^ "PM nod for underground Metro averts eviction". www.telegraphindia.com. Retrieved 14 March 2021.
  7. ^ "Senbo Engg wins ₹532 crore underground civil contracts for Kolkata Metro Line 4 | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 12 April 2023.