Metrolinx
Agency overview | |
---|---|
Formed | June 22, 2006 | (as the Greater Toronto Transportation Authority)
Type | Crown agency |
Jurisdiction | Government of Ontario |
Headquarters | Union Station 97 Front Street West Toronto, Ontario, Canada |
Agency executives |
|
Child agencies | |
Key document | |
Website | www |
Metrolinx is a transportation agency in Ontario, Canada. It is a Crown agency that manages and integrates road and public transportation in the Greater Toronto and Hamilton Area (GTHA). It was created as the Greater Toronto Transportation Authority on June 22, 2006, and adopted its present name as a brand name in 2007 and eventually as the legal name in 2009. It is headquartered at Union Station in Toronto.
Metrolinx serves as the central procurement agency on behalf of Ontario municipalities for local transit vehicles, equipment and services. It is also responsible for operating the GO Transit system, the Presto card used across the GTHA and by OC Transpo in Ottawa and the Union Pearson Express airport rail link to Toronto Pearson International Airport.[1]
Metrolinx is also responsible for the construction of transit expansion projects worth nearly $30 billion in Toronto – including Line 5 Eglinton, the Ontario Line, the Line 1 subway extension into Richmond Hill in York Region, and the Line 2 extension – following a 2020 agreement with the City of Toronto.[2]
History
[edit]The Greater Toronto Transportation Authority was created by legislation and introduced in the Legislative Assembly of Ontario on April 24, 2006. The bill was passed and received royal assent on June 22, 2006. In April 2007, a transition team seconded from the Ontario Public Service began work at the GTTA's headquarters at 20 Bay Street in Toronto.
On December 4, 2007, the GTTA adopted the name 'Metrolinx' for public use. At the same time, it launched a new web site, and released the first of its series of green papers on transportation issues, part of the process of creating the Regional Transportation Plan. From June 2008, Metrolinx began using a new logo in printed and electronic communications.
Timeline
[edit]- 2008:
- December 17: Metrolinx announced that, together with twelve municipalities, it had made a collective bus purchase for 160 buses.[3]
- 2009:
- March 30: the Ontario government introduced legislation to merge GO Transit and Metrolinx into a single entity, with "Metrolinx" as its legal name.[4] The legislation received royal assent on May 14, 2009, taking immediate effect. This resulted in the replacement of the previous board structure with a new one in which 15 private-sector appointees are made by the province. The legislation makes other changes to Metrolinx's powers and abilities. GO's trackage used to be owned entirely by Canada's two major commercial railways: the large majority by the Canadian National Railway (CNR) and the remainder by Canadian Pacific Railway (CPR). Before Metrolinx's creation, GO Transit had only acquired partial ownership of the Lakeshore East, Barrie, Stouffville and Milton lines. However, ever since its inception Metrolinx has been expanding its ownership of the rail corridors on which GO Transit operates by acquiring nonessential rail lines from both CN and CP.
- April 8: Metrolinx announced that it had acquired the Weston Subdivision, part of the Kitchener line, then known as the Georgetown line, for $160 million from CN.[5][6]
- June 27: GO Transit introduced summer weekend GO train service between Toronto and Niagara Falls.[7]
- December 15: Metrolinx announced that it had acquired the lower portion of the Newmarket subdivision for $68 million from CN, giving it full ownership of the Barrie line.[8]
- 2010:
- March 31: Metrolinx announced that it had acquired a key piece of track from CN for $168 million.[9] This purchase was for a portion of the Oakville subdivision from Union station to 30th Street in Etobicoke just west of GO's Willowbrook Rail Maintenance Facility.
- July 30: Metrolinx announced its plan to build, own and operate the air rail link between Union Station and Toronto Pearson International Airport.[10]
- 2011:
- January 24: Metrolinx and the Regional Municipality of York awarded contracts for early construction on work on the York Viva Bus Rapid Transit way.[11]
- March 30: Metrolinx announced that it had acquired the portion of the Kingston line on which that GO trains operate from CN for $299 million, giving them full ownership of the Lakeshore East line.[12]
- June 16: Metrolinx announced that, together with 12 municipalities, it purchased 287 new transit buses.[13]
- August 24: Metrolinx division GO Transit announced that the Presto card was available across its entire GTHA network.[14]
- December 19: GO Transit expanded its weekday GO train service to include stations in Kitchener-Waterloo and Guelph.[15]
- 2012:
- January 29: Metrolinx division GO Transit opened the new Allandale Waterfront GO Station in Barrie.
- March 27: Metrolinx announced that it had acquired key portions of multiple subdivisions from CN for $310.5 million. This purchase included the southern portions of the Bala subdivision up to CN's main east-west freight line the York subdivision, part of the Richmond Hill line and a large portion of the Oakville subdivision from 30th Street in Etobicoke to a point just west of Fourth line in Oakville.[16]
- May 10: GO Transit announced summer weekend and GO train service between Toronto and Barrie.[17]
- November 15: GO Transit launched the GO Train Service Guarantee, a fare credit policy for train delays.[18]
- November 29: Metrolinx announced the Next Wave of Big Move projects.[19]
- 2013:
- January 5: GO Transit began serving the new Acton GO Station.
- March 22:, Metrolinx completed an additional purchase of the Oakville subdivision from CN for $52.5 million. This purchase was for the portion from Fourth Line in Oakville to a point just east of where CN's freight main line joins the Oakville Subdivision in Burlington.[20]
- April 13: Presto's smart farecard is available across the entire OC Transpo network in Ottawa.[21]
- May 27, 2013, Metrolinx announced its Investment Strategy, a series of recommendations for sustaining transit growth in the region.[22]
- June: Metrolinx had ownership of 68% of the corridors on which it operates, up from 6% in 1998.[23] It has complete ownership of the Barrie, Stouffville and Lakeshore East lines and majority ownership of the Lakeshore West line (to a point just west of Burlington GO station) and Richmond Hill line (to Doncaster Junction, a point in between Old Cummer and Langstaff GO stations). Metrolinx owns comparatively small portions of the Kitchener and Milton lines, a situation that is unlikely to change as the lines are heavily used by freight traffic.
- June 5: Metrolinx crews began tunnelling the western underground portion of the Eglinton Crosstown light rail transit line.[24]
- June 28: GO Transit introduced its biggest expansion in 46 years with 30-minute service on the Lakeshore lines.[25]
- November 29: Metrolinx opened the Strachan Avenue underpass, allowing GO trains to operate below the road without disrupting road traffic.[26] Metrolinx and the City of Mississauga announced the start of construction for the west segment of the Mississauga Transitway, scheduled for completion in 2016.[27]
- 2014:
- February 28: Metrolinx revealed plans to increase train service to Hamilton and build the new West Harbour GO Station.
- March 31: Metrolinx division Presto announced that one million transit riders were using the electronic fare card across the GTHA and Ottawa.[28]
- July 17: it was reported that Metrolinx had purchased stations at Georgetown, Brampton and Oshawa.[29][30]
- September 24: Metrolinx announced the purchase of the segment of the Kitchener line between Kitchener and Georgetown.[31]
- September 30: Metrolinx announced a partnership with Ivanhoé Cambridge to redevelop a new GO Bus Terminal that serves as a major transit, commercial and community hub.[32]
- 2015
- February 2: 36 GO stations and terminals began offering free WiFi, providing coverage to approximately 80 per cent of customers.[33]
- February 12: Metrolinx announced a major expansion of Stouffville GO Line, adding additional tracks and improving the corridor to increase train.[34]
- March 10: Metrolinx announced a major expansion of Barrie GO line, adding additional tracks and improving the corridor to increase train capacity.[35]
- April 24: the new York GO Concourse was opened, a major part of the ongoing revitalization of Union Station, adding 50 per cent more capacity than the Bay Concourse.[36]
- June 6: the new Union-Pearson Express was launched, linking Toronto's Pearson International Airport with Union Station via a 25-minute two-stop express train.[37]
- July 9: the new West Harbour GO Station was opened in Hamilton, in time for the Toronto 2015 Pan Am Games.[38]
- 2018:
- January: Metrolinx claimed that their computer systems were hacked by North Korea, but did not provide any further details.[39]
- March 14: the Whitby Rail Maintenance Facility was substantially completed.[40]
Responsibilities
[edit]The Metrolinx Act, 2006, formerly known as the Greater Toronto Transportation Authority Act, 2006, describes two of Metrolinx's primary responsibilities as being:[41]
- to provide leadership in the co-ordination, planning, financing and development of an integrated, multi-modal transportation network that conforms with transportation policies of growth plans prepared and approved under the Places to Grow Act, 2005 applicable in the regional transportation area and complies with other provincial transportation policies and plans applicable in the regional transportation area, and
- to act as the central procurement agency for the procurement of local transit system vehicles, equipment, technologies and facilities and related supplies and services on behalf of Ontario municipalities.
The Big Move regional transportation plan
[edit]The Big Move: Transforming Transportation in the Greater Toronto and Hamilton Area was one of Metrolinx's first deliverables. It is a Regional Transportation Plan (RTP) including a rolling five-year capital plan and Investment Strategy for the GTHA. The plan builds on 52 GO train, subway, light rail and bus rapid transit projects proposed by the Government of Ontario in its MoveOntario 2020 plan announced on June 15, 2007, and includes new projects to support them.
A draft version of the Big Move was provided to Metrolinx on September 26, 2008, and a final version was approved on November 27, 2008.[42]
Progress
[edit]Planning and construction is underway for some projects supporting the Regional Transportation Plan.
The three levels of government have provided $16 billion toward the first wave of projects, which are already underway. The next wave of projects were still in the planning phase at the time of the Big Move's release, and still subject to funding. Some of these projects have since attained approved funding, while others have not.
Funding investment strategy
[edit]The Metrolinx Investment Strategy, released in May 2013, proposes a series of 24 recommendations as part of a four-part plan to integrate transportation, growth and land use planning in the GTHA, maximize the value of public infrastructure investment, optimize system and network efficiencies, and dedicate new revenue sources for transit and transportation. These recommendations included revenue tools and policy recommendations.[43]
Metrolinx also advised that funds raised by all the new taxes would be put in a dedicated transportation trust fund, one that would be administered by a board separate from Metrolinx.[44]
The Investment Strategy was given to the government for consideration in 2013.
Current projects
[edit]As of May 2024[update], Metrolinx is managing the following public transit projects:[45]
Type | Transit service | Project | Start | End | Description |
---|---|---|---|---|---|
Commuter rail | |||||
GO Expansion: two-way frequent electrified GO train service along portions of certain corridors[46][47] | Barrie line | Aurora GO Station | August 21, 2023 | ||
Bloor–Lansdowne GO Station | February 2024 | November 2027 |
| ||
Bradford GO Station[54] | |||||
King City GO Station | |||||
Maple GO Station |
| ||||
Rutherford GO Station | July 11, 2022[59] |
| |||
Corridor Improvements |
| ||||
Kitchener line | Bramalea GO Station | 2020 | May 15, 2023[62] |
| |
King–Liberty GO Station | January 2024 | March 2028 |
| ||
St. Clair–Old Weston GO Station | January 2024 | December 2028 |
| ||
Weston GO Station | 2019 |
| |||
Corridor Improvements |
| ||||
Kitchener Extension | May 2022[68] |
| |||
Bloor GO Station |
| ||||
Lakeshore East line | Bowmanville Extension |
| |||
East Harbour Transit Hub | November 2022 | August 2028 |
| ||
Eglinton GO Station | September 24, 2022 | Late 2024 |
| ||
Corridor Improvements |
| ||||
Lakeshore West line | Confederation GO Station | October 11, 2022[74] | 2025[75] | ||
Long Branch GO Station | December 2023[77] | ||||
Mimico GO Station | 2022[81][82][83] |
| |||
Niagara Extension |
| ||||
Corridor Improvements | |||||
Milton line | Cooksville GO Station | November 2, 2017 | September 3, 2022[90] | ||
Kipling Bus Terminal | April 13, 2018[93] | May 20, 2021[94][95] |
| ||
Richmond Hill line | Bloomington GO Station | Sprint 2017[97] | June 28, 2021[98] | ||
Stouffville line | Agincourt GO Station | May 7, 2018 | September 21, 2023[101] | ||
Finch–Kennedy GO Station | October 2023 | August 2027 |
| ||
Milliken GO Station | 2019 | September 2023[105] |
| ||
Old Elm GO Station | October 27, 2023 | ||||
Unionville GO Station | May 31, 2022[110] | ||||
Corridor Improvements |
| ||||
Union Station | Union Station Enhancement Project | January 27, 2022 | Fall 2025[114] | ||
Wilson Yard expansion |
| ||||
Signalling system upgrade | |||||
Track enhancements | |||||
Rapid transit | |||||
Bus rapid transit | Dundas Street bus rapid transit | Expected: GO Transit, TTC, MiWay, Oakville Transit, Burlington Transit, Hamilton Street Railway |
| ||
Durham–Scarborough bus rapid transit | Expected: TTC, Durham Region Transit and GO Transit |
| |||
Queen Street – Highway 7 Bus Transit | |||||
Light rail | Line 5 Eglinton | 2011 | Not announced[121] |
| |
Line 6 Finch West | 2016 | Not announced[122] |
| ||
Hamilton LRT | |||||
Hazel McCallion LRT | 2020 | Not announced[123] |
| ||
Subway | Line 5 Eglinton westward extension | July 2021 |
| ||
Ontario Line | March 27, 2022 | 2031 |
| ||
Scarborough subway extension | November 30, 2022 |
| |||
Yonge North subway extension |
|
Operating divisions
[edit]This section needs additional citations for verification. (August 2013) |
GO Transit
[edit]GO Transit is the inter-regional public transit system serving the Greater Toronto and Hamilton Area and the Greater Golden Horseshoe. GO carries over 65 million passengers a year using an extensive network of train and bus services; rail service is provided by diesel locomotives pulling trains of unpowered double-deck passenger cars, while most bus service is provided by inter-city coaches.
Canada's first such public system, GO Transit began regular passenger service on May 23, 1967, under the auspices of the Ontario Ministry of Transportation. Over time it has been constituted in a variety of public-sector configurations, but it became an operating division of Metrolinx in 2009.
New and improved GO service is a top transit priority listed in the regional transportation plan. Since 2009, GO Transit has introduced seasonal train service to Barrie and Niagara Falls,[130][131] extended service to Kitchener and Lake Simcoe,[132][133] opened four new stations at Acton, Guelph Central, Allandale Waterfront, and Hamilton West Harbour.[134][133] Since June 2013, GO Trains along the Lakeshore rail lines run every 30 minutes, making the biggest expansion in GO Transit history.[25]
Union Pearson Express
[edit]The Union Pearson Express (UP Express) airport rail link service began operation on June 6, 2015, linking Union Station in downtown Toronto with Pearson International Airport in the city of Mississauga, roughly 23.3 km (14.5 mi) away. The trains run every fifteen minutes, seven days a week, and are predicted to eliminate 1.5 million car trips annually. The duration of this trip is approximately 25 minutes.
The line uses a Metrolinx-owned railway rail corridor now used by GO Transit, as part of the Georgetown South Project to allow for additional train traffic. The UP Express shares the same path as trains on the Kitchener line, before splitting off onto a separate subdivision just west of the Etobicoke North Station. It stops at the existing Bloor and Weston GO Stations.
Presto
[edit]The Presto card, originally known as the GTA Farecard, is a smartcard-based fare payment system for public transit systems in Ontario, including those in the Greater Toronto and Hamilton Area and Ottawa. The Presto system is designed to support the use of one common farecard for fare payment on various public transit systems, through electronic readers that calculate the correct fare and deduct it from a preloaded balance.
Presto will also centralize its operational logistics, such as farecard procurement, reporting services, and a customer call centre. The system was trialled from June 25, 2007, to September 30, 2008. Full implementation began in November 2009. It will be rolled out across the province in stages. Presto now serves over a million customers in the GTHA and Ottawa.
By January 2017, Presto had been fully implemented on the following 11 transit systems:
- Brampton Transit
- Burlington Transit
- Durham Region Transit
- GO Transit
- Hamilton Street Railway
- MiWay
- Oakville Transit
- OC Transpo
- Toronto Transit Commission
- UP Express
- York Region Transit
Other programs
[edit]Smart Commute is a program that, with the support of local municipalities, endeavours to fight climate change by reducing traffic congestion and increasing transit efficiency. Employers and employees in the GTHA can explore and have assistance with different commuting options, such as carpooling, transit, cycling, walking, remote work, and flextime. The program is delivered through local transportation management associations.[135]
Originally conducted under the Ontario Ministry of Transportation in 2006, the Transit Procurement Initiative involves Metrolinx assisting municipal transit operators with the procurement of vehicles, equipment, technologies, facilities and related supplies. The goal of the program is to reduce per unit cost, increase unit quality, and provide an open and transparent procurement process for municipal transit operators. To date, the program has supported 21 municipalities and transit agencies, has purchased over 400 buses, and has saved an estimated $5 million.[136]
Metrolinx also seeks partnerships with individuals and the community, and offers financial support for proposed projects that support transit.[137]
Smart Commute includes various programs for commuters, including carpool ride-matching, walking and cycling, and teleworking programs.
In July 2015, a $4.9 million plan was announced to double the size of Bike Share Toronto by 2016.[138] The bicycles and docking stations will be owned by Metrolinx, while the system will continue to be operated by the Toronto Parking Authority.[139]
In 2021, Metrolinx dropped its hydrail program.[140]
Criticism
[edit]Metrolinx has been criticized for not having enough executive power in planning transit outside of municipal politics, despite being established to take political delay out of transportation planning.[141] After Rob Ford was elected mayor of Toronto in December 2010, he declared Transit City, the provincially funded transit expansion plan of light rail lines, dead. These lines were a large component of Metrolinx's 2008 Big Move.[142] Metrolinx was again criticized when, in January 2012, its CEO declared that it would bend to what Toronto City Council wanted regarding how the Eglinton-Scarborough Crosstown LRT line should be built. The issue centred on whether the more suburban stretches of the line, from Laird Drive to Kennedy Station, should be built at street level instead of a more costly underground alignment.[143] Metrolinx was criticized after a Toronto Star investigation found that the agency has approved two transit stations, Kirby and Lawrence East, for the GO Regional Express Rail expansion due to political pressure from the Ministry of Transportation. Kirby is in the Vaughan riding of the then-transportation minister, Steven Del Duca, and Lawrence East in Scarborough is part of Toronto mayor John Tory's "SmartTrack" plan, his signature campaign promise. Both stations were not recommended to be constructed in the near term by an external consultant, AECOM, hired by Metrolinx. However, they were both shortlisted to begin construction.[144][145] Ontario's auditor general found that Metrolinx incurred about $436 million "in sunk and additional" – unrecoverable – costs between 2009 and 2018 due to numerous changes in transit plans.[146]
In Ottawa, where Metrolinx is only involved in fare collection, Jim Watson, the former mayor of Ottawa, has criticized Metrolinx for wanting to increase the fee it collects from 2% to 10%, and characterized it as a monopoly.[147][148]
Governance
[edit]Metrolinx used to be governed by a board consisting of various appointees from the Ontario government and the regions within the GTHA. After the passage of the Greater Toronto and Hamilton Area Transit Implementation Act, 2009 merging Metrolinx and GO Transit, the Metrolinx board structure was changed, with politicians specifically prohibited from serving.[149]
The Metrolinx president and CEO is Phil Verster, who also serves as a member of the board of directors.[150] Verster resigned on December 2, 2024, and will be replaced by interim president and CEO Michael Lindsay.[151]
Metrolinx's board of directors is composed of not more than 15 persons (including the CEO) appointed by the Ontario's lieutenant governor on the recommendation of the Ontario Minister of Transportation.[152] As of January 2018, the chair was Donald Wright.[153][154]
President and CEO | From | Until | Note |
---|---|---|---|
Robert MacIsaac | 2006[155] | 2009[156] | Chair |
Robert Prichard | 2009[157] | September 2010 | |
Bruce McCuaig | September 2010[158] | April 2017[159] | |
John Jensen | April 2017 | September 2017[160] | Interim CEO |
Phil Verster | October 2017[161] | December 2024[162] | |
Michael Lindsay | December 2024[163] | (incumbent) | Interim CEO |
See also
[edit]References
[edit]- ^ "Metrolinx - Public Appointments Secretariat". Public Appointments Secretariat. Retrieved May 27, 2024.
- ^ Fox, Chris (February 14, 2020). "Toronto signs preliminary agreement with province for $30B transit plan". Toronto. Retrieved March 22, 2021.
- ^ "Metrolinx – Metrolinx announces Big Purchase of Buses". Newswire.ca. Archived from the original on April 13, 2014.
- ^ Bill 163, Greater Toronto and Hamilton Area Transit Implementation Act, 2009 Archived June 11, 2011, at the Wayback Machine, Legislative Assembly of Ontario website, accessed April 1, 2009
- ^ "GO Transit – GO Transit acquires important CN rail line for expanded commuter rail service in the Greater Toronto Area". Newswire.ca. Archived from the original on December 3, 2013. Retrieved November 29, 2013.
- ^ "GO Transit acquires important CN rail line for expanded commuter rail service in the Greater Toronto Area". Toronto.on.ca.
- ^ "Newsroom : First GO Train Arrives In Niagara Falls". News.ontario.ca.
- ^ "Metrolinx buys Toronto-Barrie CN rail line". CBC News.
- ^ "CN | CN sells commuter rail line segment west of Toronto Union Station to Metrolinx for C$168 million". www.newswire.ca. Archived from the original on December 3, 2013. Retrieved January 11, 2022.
- ^ "Metrolinx to operate Union – Pearson rail link". Toronto.on.ca.
- ^ "Metrolinx and York Region award two contracts
for building Viva bus rapid transit projects – Transit Toronto – Weblog". Toronto.on.ca. - ^ "La Compagnie des chemins de fer nationaux du Canada | Metrolinx acqui..." Archived from the original on June 28, 2013.
- ^ "Welcome to New Flyer!". Newflyer.com. Archived from the original on April 13, 2014.
- ^ "Newsroom : PRESTO Makes Commuting Easier For Families On the GO". News.ontario.ca.
- ^ "Next stop, Guelph! GO Train service starts Dec. 19". Guelphmercury.com. November 25, 2011.
- ^ "CN – CN sells Greater Toronto Area rail lines to Metrolinx for GO Transit services". Newswire.ca. Archived from the original on December 2, 2013. Retrieved November 29, 2013.
- ^ "GO Transit – Weekend GO Train service pilot for Barrie corridor this summer". Newswire.ca.
- ^ Kalinowski, Tess (November 14, 2012). "GO train: 15 minutes late and it's free". Toronto Star. Retrieved January 29, 2018.
- ^ "Metrolinx Unveils Next Wave of Big Move Projects". Urbantoronto.ca. November 29, 2012.
- ^ "CN – CN sells Oakville-Burlington, Ont., line segment to Metrolinx for GO Transit commuter rail service". Newswire.ca. Archived from the original on April 14, 2015. Retrieved November 29, 2013.
- ^ "Green light on full Presto rollout: Report". Ottawa Sun.
- ^ "Metrolinx – Media Advisory – Final Metrolinx Investment Strategy to Be Released". Newswire.ca.
- ^ "GO Transit President's Board Update" (PDF). Metrolinx.com. June 2013. Archived from the original (PDF) on December 3, 2013. Retrieved May 27, 2018.
- ^ Kalinowski, Tess (June 5, 2013). "Eglinton Crosstown crews launch giant tunneling machine". Toronto Star. Retrieved January 29, 2018.
- ^ a b Kalinowski, Tess (April 19, 2013). "GO trains to run every 30 minutes all day on Lakeshore lines". Toronto Star. Retrieved January 29, 2018.
- ^ "Metrolinx Opens New Strachan Avenue Underpass". Urbantoronto.ca.
- ^ "Construction starts on west segment of the Mississauga Transitway". November 29, 2013. Archived from the original on March 5, 2014.
- ^ "Metrolinx – One Million Customers Tap On With PRESTO". Newswire.ca.
- ^ "Metrolinx purchases CN Rail stations". Building.ca.
- ^ "Oshawa Express". Oshawaexpress.ca. Archived from the original on August 8, 2014. Retrieved August 3, 2014.
- ^ "Metrolinx buys 53-km track section, touts Kitchener GO upgrades". Cbc.ca. September 24, 2014.
- ^ "Metrolinx and Ivanhoé Cambridge to redevelop GO Bus Terminal into major transit, commercial and community hub". Metrolinx.com.
- ^ "Free WiFi Coming To 22 More GO Stations". Metrolinx.com.
- ^ "Metrolinx Expanding Section of Stouffville GO Line to Get Region Moving". Metrolinx.com.
- ^ "Metrolinx Expanding Barrie GO Line to Get Region Moving". Metrolinx.com.
- ^ "Metrolinx opens the new York GO Concourse in Union Station". Metrolinx.com.
- ^ "Union Pearson Express to launch June 6". The Toronto Star. April 22, 2015.
- ^ "GO Transit's new Hamilton station opens". The Toronto Star. July 17, 2015.
- ^ "Metrolinx claims computers hit by North Korean cyberattack". CBC News. January 23, 2018. Retrieved January 27, 2018.
- ^ "Whitby Rail Maintenance Facility". Metrolinx. Archived from the original on May 2, 2021. Retrieved May 1, 2021.
- ^ "The Metrolinx Act, 2006". Ontario Legislature. 2006. Retrieved May 31, 2011.
- ^ "The Big Move". Metrolinx. 2008. Archived from the original on April 6, 2010. Retrieved January 15, 2009.
- ^ Kalinowski, Tess (May 27, 2013). "Metrolinx backs hikes in gas, sales tax, parking levy to fund the Big Move". Toronto Star. Retrieved January 29, 2018.
- ^ Torontoist (May 28, 2013). "Can the Metrolinx Investment Strategy Succeed?". Torontoist.com.
- ^ "Projects". Metrolinx. Retrieved September 25, 2021.
- ^ Niepow, Daniel (April 2018). "Ontario invests billions in ambitious plan to boost GO Transit's commuter-rail service". Progressive Railroading. TradePress Media Group. Retrieved June 22, 2018.
- ^ "GO Expansion". Metrolinx. Retrieved May 27, 2024.
- ^ "Construction getting underway for Aurora GO rail improvements". NewmarketToday.ca. August 17, 2023. Retrieved May 28, 2024.
- ^ "Ontario Investing in Aurora GO Station". Government of Ontario. August 16, 2023. Retrieved May 28, 2024.
- ^ "GO Expansion: Aurora GO" (PDF). Metrolinx. October 2021. Retrieved May 27, 2024.
- ^ "Bloor-Lansdowne GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ a b c d e "SmartTrack Stations Program". City of Toronto. March 12, 2020. Retrieved May 28, 2024.
- ^ a b c d e "SmartTrack Stations Program – Update" (PDF). City of Toronto. March 7, 2023. Retrieved May 27, 2024.
- ^ "Bradford GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "King City GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "King City GO Station: Infrastructure & Improvements" (PDF). Metrolinx. December 13, 2022. Retrieved May 27, 2024.
- ^ Pavilons, Mark (December 21, 2022). "King welcomes transit expansion plans". King Weekly Sentinel. Retrieved May 27, 2024.
- ^ "Maple GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Major construction is complete at Rutherford GO". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Rutherford GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Corridor Work". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Construction now complete at Bramalea GO". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Bramalea GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "King-Liberty GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "St. Clair-Old Weston GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Weston GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Kitchener Line GO Expansion.Corridor Work". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Key progress update for Kitchener GO Line". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Kitchener Extension". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Bloor Station (TTC Connection)". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Bowmanville Extension". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "East Harbour Transit Hub". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Eglinton GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Construction underway at new Confederation GO station in Hamilto". www.metrolinx.com. Retrieved May 28, 2024.
- ^ Hristova, Bobby (October 6, 2022). "Hamilton's Confederation GO station to be built by 2025, premier says". CBC. Retrieved May 28, 2024.
- ^ "Confederation GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ Glazer, Adrien (March 5, 2024). "Major construction at Long Branch GO Station causes commuter confusion". Skedline. Retrieved May 28, 2024.
- ^ "Long Branch GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Long Branch GO Station". www.gotransit.com. Retrieved May 28, 2024.
- ^ "Long Branch GO Station Improvements" (PDF). Metrolinx. March 24, 2022. Retrieved May 28, 2024.
- ^ Jones, Ryan Patrick (March 4, 2024). "They were supposed to get a new train station. Instead, Mimico residents are 'staring at a hole in the ground'". CBC. Retrieved May 28, 2024.
- ^ "Ontario Partners with Business to Build New Etobicoke GO Station". news.ontario.ca. October 25, 2018. Retrieved May 28, 2024.
- ^ "Ontario strikes deal with private developer to rebuild Mimico GO station". CBC. October 25, 2018.
- ^ "Mimico GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Metrolinx makes the case for a Beamsville GO station it says would draw thousands". CBC. March 16, 2022. Retrieved May 28, 2024.
- ^ Benner, Allan (March 15, 2022). "Beamsville GO train station a step closer to reality — though several years away". St. Catherine's Standard. Retrieved May 28, 2024.
- ^ "Initial Business Case for Beamsville GO Station released". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Corridor Work". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Burloak Drive Grade Separation". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Ontario Officially Opens New Cooksville GO Station". news.ontario.ca. November 10, 2020. Retrieved May 28, 2024.
- ^ "Cooksville GO Station opens new platform and pavilion". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Cooksville GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ Sienkiewicz, Alexandra (April 3, 2017). "Decades in the making, new Kipling transit hub inches closer to reality". CBC. Retrieved May 28, 2024.
- ^ "Ontario Marks Completion of New Kipling Transit Hub". news.ontario.ca. May 20, 2021. Retrieved May 28, 2024.
- ^ Fox, Chris (May 20, 2021). "Construction completed on $73M transit hub at Kipling GO Station". CP 24. Retrieved May 28, 2024.
- ^ "Kipling Transit Hub". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Ontario to Officially Open New Bloomington GO Station". news.ontario.ca. June 16, 2021. Retrieved May 28, 2024.
- ^ Faieta, Nick (February 15, 2019). "Construction update on Bloomington GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Bloomington GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "History made as Bloomington GO Station opens doors to public". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Regional Express Rail (RER) - Stouffville Corridor". Infrastructure Ontario. Retrieved May 28, 2024.
- ^ "Agincourt GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ Adler, Mike (June 9, 2023). "'What is our option?' GO train service cuts to Scarborough's Agincourt area leave residents feeling stranded". Toronto.com. Retrieved May 28, 2024.
- ^ "Finch-Kennedy GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Major improvements complete along Stouffville GO Line". Metrolinx. September 15, 2023. Archived from the original on September 15, 2023.
- ^ "Milliken GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Ontario Completes New and Improved Old Elm GO Station". news.ontario.ca. October 27, 2023. Retrieved May 28, 2024.
- ^ "Ontario Gives Lincolnville GO Station a New Name". news.ontario.ca. September 29, 2021. Retrieved May 28, 2024.
- ^ "Old Elm GO Station is now complete". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Upgrades complete at Unionville GO Station". www.metrolinx.com. May 31, 2022. Retrieved May 28, 2024.
- ^ "Unionville GO Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Ontario Upgrades Two GO Stations Along Stouffville Line". news.ontario.ca. September 13, 2023. Retrieved May 28, 2024.
- ^ "Stouffville Line GO Expansion.Corridor Work". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Project Alliance Agreement Finalized for the Union Station Enhancement Project". Infrastructure Ontario. Retrieved May 28, 2024.
- ^ "Union Station is getting a new passenger concourse". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Ex33.1 Attachment 6 - UNION STATION ENHANCEMENT PROJECT – PHASE 1 RFP RENDERINGS" (PDF). City of Toronto. Retrieved May 28, 2024.
- ^ "GO Rail Expansion - Union Station Enhancement Project". Infrastructure Ontario. Retrieved May 28, 2024.
- ^ "Wilson Yard Expansion". www.metrolinx.com. Retrieved May 28, 2024.
- ^ Geenen, Kevin (September 22, 2023). "Major transit overhaul appears on the way for Hamilton". The Hamilton Independent. Retrieved May 28, 2024.
- ^ "Dundas BRT". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Will the Eglinton Crosstown LRT open in 2024? Metrolinx is 'not going to speculate'". Global News. September 4, 2024.
- ^ "Finch West LRT project marks completion of stations and stops, but work still ongoing". CityNews. September 20, 2024.
- ^ "Hurontario LRT track trouble and delays threaten credit rating, completion timeline". Global News. October 15, 2024.
- ^ "Next steps announced for Eglinton Crosstown West subway extension into Etobicoke, Mississauga". Global News. Archived from the original on August 19, 2020. Retrieved September 7, 2020.
- ^ "Tunnelling starts on the Eglinton Crosstown West Extension". Metrolinx. April 11, 2022. Archived from the original on April 12, 2022.
- ^ "Eglinton Crosstown West Extension - FAQs". Metrolinx. Retrieved December 7, 2023.
- ^ "Scarborough Subway Extension". Infrastructure Ontario. Retrieved May 28, 2024.
- ^ "Scarborough Subway Extension". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "High Tech Station". www.metrolinx.com. Retrieved May 28, 2024.
- ^ "Weekend GO Train service pilot for Barrie corridor this summer". Newswire.ca. Retrieved May 27, 2018.
- ^ "First GO Train Arrives In Niagara Falls". News.ontario.ca. Retrieved May 27, 2018.
- ^ "GO Transit is expanding train service to Kitchener-Waterloo, Guelph and Acton". Newswire.ca. Retrieved May 27, 2018.
- ^ a b "Construction completed at the new Allandale Waterfront GO Station". Newswire.ca. Retrieved May 27, 2018.
- ^ "Media Advisory – GO Transit Adjusts Service Starting January 5". Newswire.ca. Retrieved May 27, 2018.
- ^ "Metrolinx Overview". Metrolinx.com.
- ^ "Transit procurement initiative". Metrolinx.com. Retrieved March 8, 2012.
- ^ "Community Initiatives". Metrolinx.com. Retrieved March 8, 2012.
- ^ Rumley, Jonathan (July 6, 2015). "Ontario unveils $4.9-million plan to expand Bike Share Toronto". CBC News. Retrieved July 8, 2015.
- ^ Kalinowski, Tess (July 6, 2015). "Bike Share Toronto to double with $4.9 million from Metrolinx". Toronto Star. Retrieved July 8, 2015.
- ^ "Fail, Hydrail: Metrolinx finally ditches plans for hydrogen-powered trains". TVO.org. February 16, 2021. Archived from the original on February 17, 2021.
- ^ "Peter Kuitenbrouwer: Council makes it seem easier to build rail through the Rockies than to get transit to Scarborough". National Post. February 8, 2012.
- ^ "Metrolinx's usefulness now in question". The Globe and Mail. December 2, 2010.
- ^ "James: Spineless Metrolinx is failing transit users". Toronto Star. January 25, 2012.
- ^ Spurr, Ben (October 1, 2017). "Metrolinx finally releases report on controversial GO stations". Toronto Star. Retrieved October 15, 2017.
- ^ Spurr, Ben (September 16, 2017). "What is the Kirby GO station and why did it get approved?". Toronto Star. Retrieved October 15, 2017.
- ^ Janus, Andrea (December 5, 2018). "Ontario auditor general slams transit agency for millions in cost overruns". CBC News. Retrieved December 23, 2018.
- ^ CBC Ottawa Morning radio interview, May 12, 2016
- ^ "OC Transpo costs could rise if Presto fees balloon by millions". CBC. May 12, 2016.
- ^ "Toronto Star Article".
- ^ "Metrolinx Senior Management Team". Metrolinx.com. Retrieved April 1, 2018.
- ^ https://www.cbc.ca/news/cznada/toronto/phil-verster-out-metrolinx-1.7398787
- ^ "Metrolinx Public Appointments Secretariat". Government of Ontario.
- ^ "Board of Directors". Metrolinx.com. Retrieved January 29, 2018.
- ^ "Metrolinx chair resigns from board". CBC News. July 12, 2018.
- ^ "Ontario Newsroom". news.ontario.ca. Retrieved December 4, 2024.
- ^ "Ontario Newsroom". news.ontario.ca. Retrieved December 4, 2024.
- ^ "Ontario Newsroom". news.ontario.ca. Retrieved December 4, 2024.
- ^ "Ontario Newsroom". news.ontario.ca. Retrieved December 4, 2024.
- ^ "Metrolinx CEO resigns for new federal role in midst of expansion". CityNews Toronto. March 28, 2017. Retrieved December 4, 2024.
- ^ "Ontario Newsroom". news.ontario.ca. Retrieved December 4, 2024.
- ^ Reporter, Ben Spurr Transportation (August 24, 2017). "Metrolinx appoints former head of Scottish rail firm as new CEO". Toronto Star. Retrieved December 4, 2024.
- ^ Benzie, Robert (December 4, 2024). "Metrolinx CEO Phil Verster leaving after seven years". Toronto Star. Retrieved December 4, 2024.
- ^ "Ontario Newsroom". news.ontario.ca. Retrieved December 4, 2024.