Jump to content

List of tallest buildings in Nashville

From Wikipedia, the free encyclopedia

William R. Snodgrass Tennessee TowerNashville City CenterOne Nashville PlaceUBS TowerLife & Casualty TowerViridian TowerSheraton Nashville DowntownRenaissance NashvilleAT&T BuildingBridgestone Tower505Fifth Third CenterThe Pinnacle at Symphony PlaceFour Seasons Hotel and Residences
Skyline of Nashville in 2024 (Use cursor to identify buildings)
US Navy Blue Angels over Nashville in 2020

This list of the tallest buildings in Nashville ranks skyscrapers in Nashville, in the U.S. state of Tennessee, by height. The tallest building in the city and the state is the AT&T Building, which rises 617 feet (188 m) in downtown Nashville and was completed in 1994.[1] The second-tallest skyscraper in the city is the Four Seasons Hotel and Residences, which rises 542 feet (165 m).

Nashville Yards Development in 2022

High-rise buildings first appeared in Nashville with the construction of the First National Bank Building, now the Downtown Courtyard Hotel, in 1905; this building rises 168 feet (51 m) and 12 floors.[2] As of May 2024, there are 207 completed high-rises in the city, as defined by Emporis. Twenty high-rises have been completed in the past three years, with another twenty currently in construction, fifteen approved, and another 25 high-rises approved and proposed. Nashville has demonstrated quick approval of many major projects, such as One22One. It was announced in February 2019, with the previous building demolished and ground breaking expected in September 2019.[3] As of July 2022, there are 45 cranes in Downtown and Metro Nashville.

Since 2000, Nashville has seen two urban construction booms, one prior to the Great Recession of 2008 and the other from 2015 to 2023, which have yielded multiple high-rises. Of the city's 36 towers of 300 feet or taller, as of April 2024, 24 have been completed since 2015. In addition, 7 towers are currently under construction, and another 10 approved for construction.

Tallest buildings

[edit]

This list ranks Nashville skyscrapers completed or structurally topped out that stand at least 300 feet (91 m), based on standard height measurement. There are at least 20 additional high rises in Nashville between 236 feet and 299 feet tall not shown here.

Name Rank Image Height
feet
Height
meters
Floors Year Primary Purpose Notes
333 Commerce[4] 1 617 188 33 1994 Office Tallest building in Tennessee. Previously named the AT&T Building & BellSouth Building.[1][5]
Four Seasons Hotel and Residences 2 542 165 40 2021 Hospitality/Residential Located at 151 First Avenue South, will offer 236 hotel rooms in addition to private residences.[6]
505 3 523 159 46 2018 Residential Tallest residential building in Tennessee.[7][8][9][10][11]
The Pinnacle at Nashville Yards 4 504 154 35 2024 Office Currently the tallest tower in the multi-tower Nashville Yards project.
Bridgestone Tower 5 460 140 30 2017 Office Started construction 2015. Bridgestone Americas headquarters[12]
Prime 6 456 139 38 2024 Residential Prime is one of two Giarantana towers that are both residential and complimentary in styles.
William R. Snodgrass Tennessee Tower 7 452 138 31 1970 Office Originally the National Life Center.[13][14]
Fifth Third Center 8 435 133 31 1986 Office Originally known as the Third National Financial Center.[15]
The Place at Fifth + Broadway 9 433 132 34 2019 Residential Topped out. Tallest for-rent residential building in Tennessee.[16][17]
The Pinnacle at Symphony Place 10 432 132 29 2010 Office [18]
Amazon Tower Two 11 421 128 28 2023 Office Second of two towers, in the Nashville Yards Development, for Amazon's Operations Center of Excellence.[19][20]
Alcove 12 418 127 34 2024 Residential First of three Giarratana-led residential towers surrounding the Nashville Yards development.[21]
Life & Casualty Tower 13 409 125 30 1957 Office This building is commonly referred to as the L & C Building[22][23]
Conrad Hotel and Residences 14 406 124 35 2021 Hospitality/Residential Located at 1600 West End Avenue, in the Broadwest Development, this building has a 14 floor hotel in addition to 220 condominiums[24]
Nashville City Center 15 402 123 27 1988 Office [25][26]
James K. Polk State Office Building 16 392 119 24 1981 Office [27][28]
JW Marriott Nashville 17 386 118 34 2018 Hospitality [29][30]
Renaissance Nashville Hotel 18 385 117 31 1987 Hospitality [31][32]
Embassy Suites 19 384 117 30 2021 Residential Located across from the Nashville Convention Center, the Embassy Suites is the third hotel in a suite of hotels in this development: Embassy Suites, One Hotel and Cambria Hotel[33][34]
Viridian Tower 20 Viridian.jpg 378 115 31 2006 Residential It is the fourth tallest residential building in Nashville, TN.
805 Lea 21 370 110 30 2021 Residential Located in Nashville's SoBro District, will have a total of 354 residential units.[35]
The Pullman at Gulch Union 22 365 111 28 2024 Residential Located at 1222 Demonbreun[36]
One Nashville Place 23 359 109 25 1985 Office [37][38]
One22One Tower 24 356 109 28 2022 Office [39]
UBS Tower 25 354 108 28 1974 Office [40][41]
The SoBro 26 345 105 33 2016 Residential [42][43][44]
1200 Broadway 27= 344 105 27 2019 Residential Also known as Endeavor Tower[45]
Amazon Tower One 27= 344 105 21 2020 Office Located at 1010 Church Street, in the Nashville Yards Development, this is the first of two towers being developed for Amazon's Operations Center of Excellence.[46]
Westin Hotel 29 337 103 27 2016 Hospitality [47][48][49]
501 Commerce 30 331 101 26 2020 Office [50]
222 2nd Avenue South 31= 326 99 25 2017 Office [51][52]
Broadwest Office Tower 31= 326 99 21 2021 Office Located at 1600 West End Avenue, in the Broadwest development, this tower will offer 21 floors of class A office space.[53]
Grand Hyatt 33 320 98 25 2020 Hospitality This Grand Hyatt 27 floor tower opened in 2020 in downtown Nashville.
West End Tower 34 306 93 21 2021 Residential Located on the edge of the Vanderbilt University campus and West End Avenue, this tower houses student apartments.
2012 West End Ave 35= 300 91 25 2020 Residential Located at 2012 Wested End Avenue this building is a 29 floor residential building.
Sheraton Nashville Downtown 35= 300 91 27 1975 Hospitality [54][55]

Tallest under construction

[edit]

Buildings approved that are currently under construction, in site prep, or demolition phase. Buildings listed are planned to rise above 300 feet (91 m).

Name Height
feet
Height
meters
Floors Year Status Primary Purpose Notes
Paramount Tower 750 230 60 2027 Under Construction Residential Will be, once completed, Tennessee's tallest building. Located at 1010 Church Street, the Nashville based Giarratana Development is developing the with 500 residential units. The YMCA of Nashville will be updating their building.[56]
The Emory at Nashville Yards 420 130 35 2024 Topped Residential One of 3 or 4 upcoming Nashville Yards residential towers
The Everett at Nashville Yards 409 125 34 2024 Topped Residential One of 3 or 4 upcoming Nashville Yards residential towers
Ray Nashville 360 110 32 2026 Under Construction Mixed use Located at 601 Lafayette St. Will house 411 residential units. Will have 373 parking spaces and 6,000 square feet of retail.
Peabody Union 350 110 27 2025 Topped Residential Located at 30 Peabody Street, is adjacent to a 6-story office owned by Eakin partners completed in 2019[57]
Albion Music Row, Tower One 320 98 29 2025 Under construction Residential Located at 14th and McGavock, this would be the taller of two residential towers planned for the site and would offer 452 units. The second tower should be 20 stories and rise 220 feet with 380 units offered.
Modera McGavock 310 94 29 2025 Under Construction Residential Located at 1212 McGavock. Will have 400 residential units[58]

Tallest proposed or pending construction

[edit]

These buildings have either been issued permits and approved, or buildings that are in its planning stage that stand 300 feet (91 m) using standard measurement.

Name Height
feet
Height
meters
Floors Year Status Primary Purpose Notes
St. Regis Hotel and Condominiums 651 198 46 2027 Proposed Hospitality and Residential To be built on the park lot next to the JW Marriott. Groundbreaking sought for 2025.
800 Lea 610 190 45 2024-25 Approved Residential Located at 800 Lea st. The developer will be Giarratana. The design will be a curved tower.[59] They say it could be 18 months for permits to be approved and the construction will take 3.5 years to take on. A permit has been issued to allow grading work to start[60]
133 Korean Vets 574 175 49 TBD Proposed Mixed-use Located at 133 Korean veterans Blvd.
Ritz Carlton Hotel & Residences 569 173 46 TBD Proposed Hospitality/Residential Optimistically adding this circle project back as scuttlebutt says property owner still wants to do the project.
11 North, Tower One 525 160 47 TBD Proposed Residential Tallest of three residential towers planned for a 10 year build out.
133 Korean Vets, Peabody Tower 512 156 49 TBD Proposed Mixed-use Located at 133 Korean veterans Blvd.
The Motley, Tower Three 500 150 44 TBD Proposed Residential Four tower project at the old dairy processing lot in midtown.
Whites Hotel Tower 485 148 35 2025 Approved Hotel Will be developed by a firm from Indiana. Located across the street from the JW Marriott Hotel and Music City Center.
Reed Tower One 473 144 40 2023 Proposed Mixed used Located at 1525 Church Street, The Jim Reed redevelopment will have 6 towers over 20 stories. It will have 1.5 million square feet of office space, 100,000 square feet in retail, 1,000 residential units and 350 hotel rooms. Eyeing a start mid 2023
Centrum Residential Tower One 447 136 39 2025 Proposed Residential Located at 500 2nd Ave S. The Chicago developer will be looking for a 3 tower project. 39 story residential, a 29-story hotel, and a 32-story residential.[61][62]
531 Second Ave., Tower One 433 132 36 2024 Approved Residential 531 Second ave. The Boston developer who is developing the 40 story Four Seasons hotel. The developer has downgraded to 38 stories now 36 stories and has added a 18-story building to the proposal.[63]
10th & Clark Residential, Tower One 409 125 37 2025 Proposed Residential 10th + Clark Residential will be a two tower project. Tower one will stand 37 stories/409’ and yield 414 units. The site encompasses 2.16 acres at 810 Lea Ave. and 905 Clark Place, just to the west of The Westin Hotel.
Rutledge Hill, Tower Two 400 120 35 TBD Proposed Residential Tallest of a three tower project proposed for a new culinary arts district in Southbank.
Ritz Carlton Apartments 396 121 32 TBD Proposed Residential Optimistically adding this circle project back as scuttlebutt says property owner still wants to do the project.
The Motley, Tower Two 393 120 32 TBD Proposed Residential Four tower project at the old dairy processing lot in midtown.
531 Second Ave. Tower Two 375 114 32 2023 Approved Residential located at 531 Second ave.[63]
901 Dr Martin Luther King Blvd 375 114 33 2025 Approved Residential Newest Tony Giarrantana's residential project. There will be an affordable housing component included.
2416 West End 374 114 27 2024 Proposed Mixed-use Located at 2416 West End Ave.[64]
Gulch Union Tower Three 362 110 28 2024 Approved Residential Located at 1207 McGavock st. Demolition of the existing building on the site is in progress.
Paseo South Gulch Tower Two 359 109 30 2025 Approved Residential/Hospitality Located at 700 8th Ave South, Tower 2 of Paseo South Gulch will now be 30 stories, 359’, 183 room hotel (unknown brand), 112 condos, 4,400 sq. ft. of retail, and 5 levels of underground parking with unknown capacity.
1100 Porter Edition Hotel 355 108 28 2025 Approved Hospitality/Residential Scale, use, and height have been updated as 12 floors were added to the project. Will now include both the hotel and condos.
10th & Clark Residential, Tower Two 354 108 34 2025 Proposed Residential 10th + Clark Residential will be a two tower project. Tower Two will stand 32 stories/354’ and yield 354 units. The site encompasses 2.16 acres at 810 Lea Ave. and 905 Clark Place, just to the west of The Westin Hotel.
Paseo South Gulch Tower Four 350 110 22 2024 Proposed Residential Is a new addition to the Paseo South development. Will include plans of 1,500 parking spaces, 396 units, 11,180 of retail square feet.[65]
Centrum Residential Tower Two 338 103 32 2025 Proposed Residential Located at 500 2nd Ave S. The Chicago developer will be looking for a 3 tower project. 39 story residential, a 29-story hotel, and a 32-story residential.[61]
1414 Church Street Tower 332 101 30 2024 Proposed Hospitality 1414 Church St. will be a 30 story/332' hotel with 192 rooms, and ground level retail.
Reed Tower Two 330 100 27 2023 Proposed Mixed used Located at 1525 Church Street, The Jim Reed redevelopment will have 6 towers over 20 stories. It will have 1.5 million square feet of office space, 100,000 square feet in retail, 1,000 residential units and 350 hotel rooms. Eyeing a start mid 2023
Reed Tower Three 330 100 27 2023 Proposed Mixed used Located at 1525 Church Street, The Jim Reed redevelopment will have 6 towers over 20 stories. It will have 1.5 million square feet of office space, 100,000 square feet in retail, 1,000 residential units and 350 hotel rooms. Eyeing a start mid 2023
Reed Tower Four 330 100 27 2023 Proposed Mixed used Located at 1525 Church Street, The Jim Reed redevelopment will have 6 towers over 20 stories. It will have 1.5 million square feet of office space, 100,000 square feet in retail, 1,000 residential units and 350 hotel rooms. Eyeing a start mid 2023
Centrum Hotel Tower 325 99 29 2025 Proposed Residential Located at 500 2nd Ave S. The Chicago developer will be looking for a 3 tower project. 39 story residential, a 29-story hotel, and a 32-story residential.[61]
Centrum Residential Hotel Tower 325 99 29 2025 Proposed Residential Located at 500 2nd Ave S. The Chicago developer will be looking for a 3 tower project. 39 story residential, a 29-story hotel, and a 32-story residential.[61]
125 11th Ave North Tower 322 98 26 2026 Proposed Residential

125 11th Ave. North will be a 26-story, 322' residential tower featuring 387 units, 17,000 sq. ft. of ground level restaurant/retail, and internal garage (2 levels below grade, 2 above) with about 425 spaces. It is being developed by Flank, Inc., and will serve as a companion tower to their 21-story Gibson Residences currently U.C. directly to the west. There will be an upper patio/plaza that connects the two over Comer's Alley and fronting the Church Street Viaduct.[66]

Reed Tower Five 320 98 26 2023 Proposed Mixed used Located at 1525 Church Street, The Jim Reed redevelopment will have 6 towers over 20 stories. It will have 1.5 million square feet of office space, 100,000 square feet in retail, 1,000 residential units and 350 hotel rooms. Eyeing a start mid 2023
11 North, Tower Two 313 95 28 2033 Proposed Residential Second tallest of a three tower residential project with 1,475 total units.
11 North, Tower Three 311 95 29 2033 Proposed Residential Third of a three tower residential project off Church St with a total of 1,475 units.
The Motley, Tower One 300 91 26 TBD Approved Residential Four tower project at the old dairy processing lot in midtown.

Timeline of tallest buildings

[edit]

This lists buildings that once held the title of tallest building in Nashville. The first skyscraper in the city was the First National Bank Building, now the Courtyard Hotel, from 1905 until 1908.

Name Street address Years as tallest Height
feet
Height
meters
Floors Reference
First National Bank Building 170 Fourth Avenue North 1905–1908 170 52 12 [2]
The Stahlman 211 Union Street 1908–1957 180 55 12 [67]
Life & Casualty Tower 401 Church Street 1957–1970 409 125 30 [22]
William R. Snodgrass Tennessee Tower 312 Rosa L. Parks Boulevard 1970–1994 452 138 31 [13]
333 Commerce 333 Commerce Street 1994–present 617 188 33 [1]

References

[edit]
General
  • "High-rise Buildings of Nashville". Emporis.com. Archived from the original on March 22, 2015. Retrieved November 14, 2008.{{cite web}}: CS1 maint: unfit URL (link)
Specific
  1. ^ a b c "BellSouth Building". Emporis.com. Archived from the original on March 22, 2007. Retrieved January 1, 2009.{{cite web}}: CS1 maint: unfit URL (link)
  2. ^ a b "Courtyard Nashville Downtown". Emporis.com. Archived from the original on March 3, 2007. Retrieved November 15, 2008.{{cite web}}: CS1 maint: unfit URL (link)
  3. ^ "Nashville Skyscraper Map". SkyscraperPage.com. Retrieved April 16, 2019.
  4. ^ "Home". 333 Commerce. Cushman & Wakefield. Retrieved August 17, 2024.
  5. ^ "BellSouth Building". SkyscraperPage.com. Retrieved December 12, 2007.
  6. ^ Bowles, Laken (March 18, 2019). "Four Seasons hotel, private residences coming to downtown Nashville". NewsChannel5.com. Retrieved March 20, 2019.
  7. ^ Williams, William (September 16, 2015). "Mid-November groundbreaking slated for 505 skyscraper". Nashville Post. Archived from the original on September 21, 2015. Retrieved September 16, 2015.
  8. ^ Sichko, Adam (April 2, 2015). "Giarratana lands more money for downtown skyscraper — with a new look". Nashville Business Journal. Archived from the original on April 7, 2015. Retrieved April 7, 2015.
  9. ^ Ward, Getahn (April 2, 2015). "Giarratana raises $60M for 505 tower, releases renderings". The Tennessean. Archived from the original on April 7, 2015. Retrieved April 7, 2015.
  10. ^ Skovira, Kristen (June 12, 2017). "Take A Look Inside Nashville's Tallest Residential Tower, 505 Nashville". WTVF. Retrieved September 2, 2017.
  11. ^ "505". The Skyscraper Center. Retrieved October 15, 2024.
  12. ^ GmbH, Emporis. "Bridgestone Tower, Nashville | 1217963 | EMPORIS". Emporis. Archived from the original on September 13, 2017. Retrieved September 13, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  13. ^ a b "William R. Snodgrass Tennessee Tower". Emporis.com. Archived from the original on February 11, 2007. Retrieved November 15, 2008.{{cite web}}: CS1 maint: unfit URL (link)
  14. ^ "William R. Snodgrass Tennessee Tower". SkyscraperPage.com. Retrieved January 1, 2009.
  15. ^ https://documents.nashville.gov/Request/Open/83bf5637-dae0-485d-889d-f6c5190fbc5d_CA-Permits-20171101_15445116_1
  16. ^ "Fifth + Broadway apartment tower topped". Nashville Post. July 31, 2019. Retrieved July 31, 2019.
  17. ^ GmbH, Emporis. “Emporis.” EMPORIS, www.emporis.com/buildings/1241609/the-place-at-fifth-broadway-nashville-tn-usa.
  18. ^ "The Pinnacle". Emporis.com. Archived from the original on June 4, 2011. Retrieved February 17, 2010.{{cite web}}: CS1 maint: unfit URL (link)
  19. ^ "Work set to resume on second Amazon tower". April 12, 2021.
  20. ^ Mazza, Sandy. “New Designs Presented for Nashville Yards, the City's Biggest Development.” USA Today, Gannett Satellite Information Network, 27 Jan. 2020, www.usatoday.com/story/money/2020/01/06/nashville-yards-new-designs-reveal-plans/2806296001/.
  21. ^ "Alcove by Giarratana".
  22. ^ a b "Life & Casualty Tower". Emporis.com. Archived from the original on March 3, 2007. Retrieved January 1, 2009.{{cite web}}: CS1 maint: unfit URL (link)
  23. ^ "Life & Casualty Tower". SkyscraperPage.com. Retrieved January 1, 2009.
  24. ^ Mazza, Sandy. “At Broadwest, Nashville Scores Another Luxury Hotel: 'It's Going to Be Absolutely Beautiful'.” The Tennessean, The Tennessean, 22 May 2019, www.tennessean.com/story/money/2019/05/22/hilton-conrad-hotel-nashville-broadwest-project/3711429002/.
  25. ^ "Nashville City Center". Emporis.com. Archived from the original on May 4, 2007. Retrieved January 1, 2009.{{cite web}}: CS1 maint: unfit URL (link)
  26. ^ "Nashville City Center". SkyscraperPage.com. Retrieved January 1, 2009.
  27. ^ "James K. Polk Building". Emporis.com. Archived from the original on February 23, 2007. Retrieved January 1, 2009.{{cite web}}: CS1 maint: unfit URL (link)
  28. ^ "James K. Polk Building". SkyscraperPage.com. Retrieved January 1, 2009.
  29. ^ Ward, Getahn (October 11, 2017). "Could the JW Marriott Nashville become downtown's largest hotel?". The Tennessean. Retrieved June 12, 2018.
  30. ^ Fetterling, Jessie (November 30, 2017). "JW Marriott Nashville Preps for Music City Debut". Prevue. Archived from the original on June 12, 2018.
  31. ^ "Renaissance Nashville Hotel". Emporis.com. Archived from the original on February 24, 2007. Retrieved January 1, 2009.{{cite web}}: CS1 maint: unfit URL (link)
  32. ^ "Renaissance Nashville Hotel". SkyscraperPage.com. Retrieved January 1, 2009.
  33. ^ "Construction Milestone Achieved for 1 Hotel Nashville and Embassy Suites Nashville Towers Across from Music City Center". March 31, 2021.
  34. ^ https://epermits.nashville.gov/download.aspx?id=636117
  35. ^ “805 Lea.” Hastings Architecture, www.hastingsarchitecture.com/project/805-lea/.
  36. ^ "Permit Patrol: 4 October 2021". Nashville Post. October 4, 2021.
  37. ^ "One Nashville Place". Emporis.com. Archived from the original on March 13, 2007. Retrieved January 1, 2009.{{cite web}}: CS1 maint: unfit URL (link)
  38. ^ "One Nashville Place". SkyscraperPage.com. Retrieved January 1, 2009.
  39. ^ "One22One". www.one22one.com/. Retrieved February 8, 2022.
  40. ^ "Regions Center". Emporis.com. Archived from the original on March 13, 2007. Retrieved January 1, 2009.{{cite web}}: CS1 maint: unfit URL (link)
  41. ^ "AmSouth Building". SkyscraperPage.com. Retrieved January 1, 2009.
  42. ^ "SoBro Apartment Tower". Emporis.com. Archived from the original on October 27, 2014. Retrieved January 28, 2015.{{cite web}}: CS1 maint: unfit URL (link)
  43. ^ "Live | Giarratana Development | Nashville". Giarratana.com. Retrieved November 21, 2011.
  44. ^ Morgan, Nathan (December 15, 2016). "See inside Tony Giarratana's The SoBro, Nashville's tallest apartment tower". Nashville Business Journal. Retrieved December 27, 2016.
  45. ^ "1200 Broadway". The Skyscraper Center.
  46. ^ “Notes: Major Permit Issued for Amazon Tower.” Nashville Post, 4 Nov. 2019, www.nashvillepost.com/business/construction/article/21095476/notes-major-permit-issued-for-amazon-tower.
  47. ^ "Westin Nashville". Emporis.com. Archived from the original on October 27, 2014. Retrieved October 26, 2014.{{cite web}}: CS1 maint: unfit URL (link)
  48. ^ Ward, Getahn (September 22, 2014). "D.F. Chase picked to build Westin's Nashville hotel". The Tennessean. Retrieved October 26, 2014.
  49. ^ Roberts, Katie (October 27, 2016). "Westin Hotels & Resorts Checks In to Music City" (Press release). Marriott International. Retrieved December 27, 2016.
  50. ^ “Fifth + Broadway Office Tower Tops Out.” Nashville Post, 12 Feb. 2020, www.nashvillepost.com/events/media-gallery/21115726/fifth-broadway-office-tower-tops-out.
  51. ^ "222 2nd Avenue South". The Skyscraper Center. Retrieved June 12, 2018.
  52. ^ "222 Second Avenue South". Gresham, Smith and Partners. Retrieved June 12, 2018.
  53. ^ “Broadwest Lands First Office Tower Tenant.” Nashville Post, 24 June 2019, www.nashvillepost.com/business/finance/banking/article/21074737/broadwest-lands-first-office-tower-tenant.
  54. ^ "Sheraton Nashville Downtown". Emporis.com. Archived from the original on February 23, 2007. Retrieved January 1, 2009.{{cite web}}: CS1 maint: unfit URL (link)
  55. ^ "Nashville Sheraton Hotel". SkyscraperPage.com. Retrieved January 1, 2009.
  56. ^ Roche, Daniel Jonas (August 14, 2024). "Paramount by Goettsch Partners is slated to be Nashville's tallest building". The Architect's Newspaper. Retrieved October 22, 2024.
  57. ^ Williams, William (August 19, 2021). "Notes: Image finalized for project planned for One City-area site". Nashville Post.
  58. ^ "Permit Patrol: 13 June 2022". June 13, 2022.
  59. ^ "Curving tower eyed for SoBro Roundabout | Nashville Post". Archived from the original on April 16, 2021.
  60. ^ "Permit Patrol: 27 September 2021". Nashville Post. September 27, 2021.
  61. ^ a b c d http://maps.nashville.gov/MPC/2021DTC-019-001_plan.pdf [bare URL PDF]
  62. ^ "New images released for three-tower project". October 11, 2021.
  63. ^ a b Williams, William (August 17, 2021). "MDHA OKs concept plan for three-tower SoBro project". Nashville Post.
  64. ^ Williams, William. "Future tower at West End corridor split could rise 27 floors". Nashville Post.
  65. ^ "Two more towers planned for Gulch development". April 27, 2022.
  66. ^ "Images released for North Gulch building to front viaduct". November 5, 2021.
  67. ^ "Stahlman Building". Emporis.com. Archived from the original on February 24, 2007. Retrieved November 15, 2008.{{cite web}}: CS1 maint: unfit URL (link)