Jump to content

Wind power in the Netherlands

From Wikipedia, the free encyclopedia

Aerial view of Windpark Krammer

As of May 2024, wind power in the Netherlands has an installed capacity of 11,611 MW, 40.9% of which is based offshore.[1] In 2022, the wind turbines provided the country with 18.37% of its electricity demand during the year.[2] Windmills have historically played a major part in the Netherlands by providing an alternative to water driven mills.[3]

In March 2022, the Dutch government announced that by 2030 offshore wind was to become the Netherlands' biggest power source, aiming at 21 GW of installed capacity.[4]

Since 2015 there has been a trend towards the deployment and planning for large wind farms, both onshore and offshore, with a view to the approximate tripling wind power capacity from 2015 levels by 2023.[5] The first of these, the 429 MW Noordoostpolder wind farm was already partially deployed by year end 2015 whilst the 600 MW Gemini offshore wind farm was commissioned in 2017. These newer and larger wind farms are making use of some of the largest wind turbines available, in particular in the case of Noordoostpolder the Enercon E-126 7500 kW wind turbine, the largest onshore turbine available at that time. The Netherlands is also well prepared for a significant rise in the production of intermittent power from wind energy by good linkages to its neighbours via high voltage cables enabling power to be imported or exported as required. These include the 580 km NorNed submarine cable (700 MW) link to Norway, the 1,000 MW BritNed cable link to the United Kingdom and the COBRA cable link to Denmark (700 MW).

Many of the numerous smaller and older wind farms in the Netherlands consist of much smaller turbines compared to those typically deployed today. These were often manufactured by lesser known wind turbine manufacturers, sometimes producing innovative products such as the Nedwind 2 blade turbine. Many of these smaller companies were eventually acquired by the larger wind turbine manufactures such as Vestas, Siemens and Lagerwey.

Installed capacity

[edit]
  Cumulative sea-based wind capacity (MW)
  Cumulative land-based wind capacity (MW)
Installed land-based wind capacity (MW) by province in 2022[6]
Cumulative wind capacity in The Netherlands[7][8][2]
Year 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999
Installed capacity (MW) 50 83 101 131 152 250 296 324 363 410
Electricity generated (GWh) 56 88 137 173 221 314 435 489 571 642
% of electricity consumption 0.07 0.11 0.16 0.20 0.24 0.34 0.45 0.49 0.55 0.61
Capacity factor in percent[a] 12.79 12.10 15.48 15.08 16.60 14.34 16.78 17.23 17.96 17.88
Year 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Sea-based capacity (MW) 108 108 228 228
Land-based capacity (MW) 447 485 672 905 1,075 1,224 1,453 1,641 1,921 1,994
Installed capacity (MW) 447 485 672 905 1,075 1,224 1,561 1,749 2,149 2,222
Electricity generated (GWh) 744 822 1,020 1,359 1,763 2,034 2,540 3,166 3,925 4,481
% of electricity consumption 0.69 0.74 0.91 1.19 1.50 1.72 2.11 2.58 3.18 3.78
Capacity factor in percent[a] 19.00 19.35 17.33 17.14 18.72 18.97 18.57 20.66 20.85 23.02
Year 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
Sea-based capacity (MW) 228 228 228 228 228 357 957 957 957 957
Land-based capacity (MW) 2,009 2,088 2,205 2,485 2,637 3,034 3,300 3,245 3,436 3,527
Installed capacity (MW) 2,237 2,316 2,433 2,713 2,865 3,391 4,257 4,202 4,393 4,484
Electricity generated (GWh) 4,503 4,725 4,939 5,368 5,810 6,917 8,364 9,642 10,030 10,774
% of electricity consumption 3.69 3.84 4.10 4.47 4.92 5.81 6.97 7.98 8.22 8.82
Capacity factor in percent[a] 22.98 23.29 23.17 22.59 23.15 23.29 22.43 26.19 26.06 27.43
Year 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Sea-based capacity (MW) 2,460 2,460 2,570 3,978
Land-based capacity (MW) 4,188 5,214 6,185 6,771
Installed capacity (MW) 6,648 7,674 8,755 10,749
Electricity generated (GWh) 13,949 18,960 21,360 26,594
% of electricity consumption 11.54 15.51 18.17 22.79
Capacity factor in percent[a] 23.95 28.01 27.87 28.24

Future targets

[edit]

The Dutch government has set a target of 6,000 MW nameplate capacity of onshore wind power by 2020 and 4,450 MW of offshore wind power by 2023, neither of which were met.[5] This will contribute towards the Dutch target of 14% renewable energy use out of total energy use by 2020[9] and 16% by 2023.[5] In 2020 wind power provided 11.54% of Dutch electricity generation (see table above) while solar power provided an additional 7.25%, for a combined 18.79%

For offshore wind a new system of tendering is under development. New wind farm deployment is based on the SER agreement that describes a plan for five years of tendering 700 MW per year. Under this system the government chooses locations and organizes tenders for projects of 350 MW, and project developers can offer bids for each farm. These sites are also surveyed centrally by the government, allowing developers to avoid costly and multiple surveys.[10]

Offshore Wind Energy Targets Defined in the 2015 SER Agreement[10]
Call for tender (year) Capacity (MW) Expected commissioning Wind farms Capacity (MW) commissioning
2016 (early) 700 2019–2020 Borssele I–II 752 2021
2016 (late) 700 2020 Borssele III–V 750.5 2021
2017 700 2021 Hollandse Kust (Zuid) I–II 759 2024 (planned)
2018 700 2022 Hollandse Kust (Zuid) III–IV 770 2024 (planned)
2019 700 2023 Hollandse Kust (Noord) V 759 2023 (planned)
Total 3,500 by 2023 Total 3,790.5 by 2024

Turbine manufacturers and repowering

[edit]

Many small scale wind farms exist throughout the Netherlands which bear testament to earlier models of wind turbines and lesser known manufacturers which provided a range of niche products, ranging in size and power output. There are several Dutch turbine manufacturers that continue to manufacture both large and small installations for domestic and international clients. Smaller turbines are often used for off grid, bespoke and community power internationally.

Selected Dutch wind turbine manufacturers[11]
Manufacturer/ Model Notes
Lagerwey Started operations in 1979. Produced at least 19 models at 250, 750, 1500, 2000, 2300, 2500, 2600, 3000, 3600, 3800, 4000 and 4500 kW. Active 2020.
WES Established 1983. Produced at least 3 models of outputs 100, 200, 250 kW. Two of the models are still under production.
NedWind Began operating in 1990. Produced at least 8 models with power outputs of 100, 250, 500, 1000 kW.

Acquired by Neg Micon 1998

Windmaster Produced at least 14 models of 100. 150, 200, 225, 300, 500, 750, 850 and 1300 kW. Acquired by Lagerway in 1998.
2-B Energy Started operation in 2001 and is developing a 6,000 kW two blade downwind turbine. Active 2016.
EWT Founded in 2004, Produced at least 12 models at 250, 500, 750, 900 and 2000 kW. Active 2020.
XEMC-Darwind Started operations 2009. Produced at least 12 models of 2000, 4000, 4500, and 5000 kW. Active 2016.

Some of the newer larger wind farms currently under construction are replacing smaller turbines previously installed at given locations. One such example is the largest wind farm in the Netherlands, Noordoostpolder, which is installing industrial scale wind turbines such as the new Enercon onshore wind turbines, at the time the largest onshore turbines in the world rated at 7500 kW nameplate capacity. The turbines have a hub height of 135 metres (443 ft) and each new turbine can generate as much electricity as all 50 turbines of the old wind farm combined.[12] The wind farm demonstrates the growth in scale in wind power as between 1987 and 1991 it was the largest of its kind in Europe with 50 turbines and a total nameplate capacity of 15 MW. The new Zuidwester site at the wind farm will have just 12 turbines and a total nameplate capacity of 90 MW.[13] A second hand market for turbines also exists, which could grow as older turbines are replaced by larger newer ones.[14]

Timeline of developments

[edit]

2022

In February 2022 the Netherlands announced it increased its offshore wind target to 21 GW by 2030. That would meet approximately 75% of the countries electricity needs. With this, offshore wind energy makes an important contribution to achieving the increased climate target of 55% less CO2-emissions.[15]

2018

In March 2018 the Dutch government announced that it will build between 2023 and 2030 several new windfarms with a total installed capacity of 7 gigawatt.[16] Where the parks will come and how they will be built is still being discussed. However, the government wants 40% of the total electricity used in 2030 in the Netherlands to be supplied by wind.[17]

2016

In the first week of December 2016, all 150 turbines of the new 600 MW Gemini offshore windfarm began producing power, and the project is expected to be fully commissioned by mid 2017.[18] In July 2016, the first two stages of offshore wind farm development for a combined 700 MegaWatt capacity in a water area near Borssele was awarded to DONG Energy at a price of 7.27 Euro cent per kilowatt hour for 15 years. Transmission costs of 1.4 eurocent/kWh is to be added as TenneT is required to take power from sea to shore.[19] [20] [21]

2015 2015 was a record year for new installations in the Netherlands with 586 MW added of which 180 MW were offshore. This record was immediately beaten the following year with another 766 MW being added.[1]

The Dutch government has expressed the aspiration to build 4.450 MW of offshore wind power by 2023[5] which will have a considerable impact on the Dutch electricity grid, operated by TenneT. [22] As a first step, the government has determined 65 sites for offshore wind farms in the North Sea and IJsselmeer. [23]

2013

By December 2013, 1,975 wind turbines were operational on land in the Netherlands, with an aggregate capacity of 2,479 MW.[24] An additional 228 MW of capacity was installed at sea.[25]

2011

In November 2011, the Dutch government decided to no longer fund €6 billion per year to maintain subsidized wind kWh at €0.18. It sharply cut subsidies down to €1.5 billion, leaving private sector to carry over wind turbine investments should these be beneficial.[26]

Onshore wind power

[edit]

Whilst there are a growing number of large onshore wind farms in the Netherlands, most of the onshore farms in 2015 consisted of a large number of small wind farms, including many single installation turbines as well as farms of between 1–10 turbines. In total there were 3,004 MW of onshore wind power at the end of 2015. Most wind power is produced in the province of Flevoland.[24] A few of the larger wind farms are listed here.

Selection of larger onshore wind farms in the Netherlands, March 2023
Wind farm Province Capacity (MW) Turbines Commissioning Notes/Ref
Windplan Groen Flevoland 500 26 × GE Cypress 6MW
15 × Nordex N163 6MW
37 × Vestas V162 6.2MW
8 × Vestas V126 3.45MW
2024 [27][28][29][30]
Noordoostpolder Flevoland 429 38 × Enercon E-126 7.5MW
48 × Siemens 3.0DD-108 3MW
2017 [31]
Princess Ariane Windpark North Holland 360 82 × Nordex N117 3.6MW
8 × Vestas V126 3.6MW
9 × Other
2020 [32]
Windplan Blauw Flevoland 339.2 37 × EnVentus V162-5.6MW
24 × GE Cypress 5.5MW
Planned 2024 [33]
Zeewolde Flevoland 321.5 9 × Vestas 2.2MW
33 × Vestas 3.8MW
41 × Vestas 4.3MW
2022 [34]
De Drentse Monden en Oostermoer Drenthe 175.5 45 × Nordex N131 3.9MW 2021 [35]
Westereems Groningen 171 50 × Enercon E82 3MW
2 × Senvion M6 6.15MW
2 × Lagerwey L136 4.5MW
2009/2012/2020 [36]
Windpark N33 Groningen 147 35 × Siemens Gamesa DD-230 R19 4.2MW 2021 [37]
Princess Alexia Windpark Flevoland 122.4 36 × Senvion 3.4M104 2013 [38]
Windpark Maasvlakte 2 South Holland 116.7 13 × Vestas V162 6.0MW
9 × Vestas V117 4.3MW
2023 [39]
Windpark Krammer Zeeland 102 34 × Enercon E-115 3MW 2018/2019 [40]
Windpark Oostpolder Groningen 97.6 21 × Enercon E-136 4.65MW 2021
Windpark Kreekraksluis Zeeland 82.5 33 × Nordex 2.5MW 2013
Windpark Kroningswind South Holland 79.8 19 × Vestas 4.2MW 2022 [41]
Windpark Oosterhorn Groningen 77.4 18 × Vestas V136 4.3MW 2021
Windpark Delfzijl Zuid Groningen 75 34 × Enercon E70 2006
Windpark Delfzijl Zuid Uitbreiding Groningen 65 16 Planned 2024
GroWind Groningen 63 21 × Vestas 2008 [38]
Windpark Delfzijl Noord Groningen 62.7 19 × Nordex 3.3MW 2015 [38]
Windpark Geefsweer Groningen 60.2 14 × Vestas V136 4.3MW 2021
Windpark Slufterdam South Holland 50.4 14 × Vestas V112 3.6MW 2018 [42]
Energiepark Pottendijk Drenthe 50.4 14 × 3.6MW 2023
Windpark Deil Gelderland 46 11 × Vestas V136 4.2MW 2020 [43]
Windpark Koegorspolder Zeeland 42 21 × Vestas V80/2000 2007 [38]
Windpark Nij Hiddum-Houw Friesland 41.8 9 × Enercon E-136 4.65MW 2022 [44]

Noordoostpolder

[edit]

The largest wind farm in the Netherlands is Noordoostpolder with a capacity of 429 MW. The farm consists of three smaller wind farms owned by separate organisations with local community links. The wind farm's 86 wind turbines will produce 1.4 billion kWh of electricity, enough. power for over 400,000 households every day, a figure roughly equivalent to the number of households in the Northern Netherlands.[12]

Westereems

[edit]
Wind turbines at the Westereems Wind Park

The next largest onshore wind farm is the Westereems wind farm located in Eemshaven in Groningen, in the north of the Netherlands.

Princess Alexia

[edit]

Up until the Westereems Wind Park was commissioned the largest onshore wind farm was the Princess Alexia Windpark in Zeewolde (122MW),[45] consisting of 36 REpower turbines and a 3.2MW/33MWh battery storage power station of BMW i3 batteries.[46]

Eemmeerdijk

[edit]

The Eemmeerdijk wind farm consists of wind turbines with just 2 blades, manufactured by Nedwind. The 19 turbines have a combined nominal power of 18 MW.[38] The wind farm was built in 1998.

In 2006 the tower of one of the turbines had buckled. The damaged wind turbine could be safely dismantled.[47] A second wind turbine was also dismantled. In January 2023 another wind turbine collapsed due to strong winds, leaving the farm with only 16 turbines.[48]

Offshore wind power

[edit]

Current offshore wind farms

[edit]
Wind farm Nameplate capacity
(MW)
Turbines Commissioned Depth
range (m)
km to
shore
Owner Refs.
Wind farms in the North Sea
Egmond aan Zee 108 36 × Vestas V90-3MW 2007 15–18 13 Shell [49][50][51]
Princess Amalia 120 60 × Vestas V80-2MW 2008 19–24 26 Eneco [52][53]
Luchterduinen 129 43 × Vestas V112/3000 2015 18–24 24 Eneco, Mitsubishi [54]
Gemini 600 150 × Siemens SWT-4.0-130 2017 28–36 55 Northland Power, Siemens, Van Oord, HVC Groep [55][56]
Borssele I–II 752 94 × Siemens SWT-8.0-154 2020 14–40 22 Ørsted [57]
Borssele III–IV 731.5 77 × MHI Vestas V164 9.5MW 2021 14–38 22 Shell, Van Oord, Eneco, Partners Group, DGE [58]
Borssele V 19 2 × MHI Vestas V164 9.5MW 2021 Green giraffe holding, Investri Offshore, Van Oord [59]
Hollandse Kust (Zuid) I–IV 1529 139 × Siemens Gamesa 11.0-200 DD 2024 18–28 18–36 Vattenfall, BASF, Allianz [60][61]
Hollandse Kust (Noord) V 759 69 × Siemens Gamesa 11.0-200 DD 2023 15–28 18.5 Shell, Eneco [62]
Hollandse Kust (West) VI 760 52 × Vestas V236 15MW Planned 2026 53 Shell, Eneco [3][63]
Hollandse Kust (West) VII 760 53 × Vestas V236 15MW Planned 2028 53 RWE, TotalEnergies [64][65]
IJmuiden Ver Alpha 2000 Planned 2029 62 ABP, APG, SSE Renewables [66]
constructed by Smulders[67][68]
IJmuiden Ver Beta 2000 Planned 2029 62 Vattenfall, Copenhagen Infrastructure Partners [66]
Wind farms in the IJsselmeer
Lely (decommissioned 2016) 2 4 × Nedwind 500 kW/41 1994 3–4 0.8 Nuon [69]
Irene Vorrink (decommissioned 2022) 16.8 28 × Nordtank NTK600/43 1996 2–3 0.1 Vattenfall [70][71]
Westermeerwind (Noordoostpolder) 144 48 × Siemens SWT-3.0-DD 2016 4–7 0.7–1.2 Westermeerwind BV [72]
Friesland 380 89 × Siemens SWT-4.3–130 2021 3–6 2 Windpark Fryslân B.V. [73][74][75][76]
IJsselmeer Buitendijks (Windplan Blauw) 132 24 × GE Cypress 5.5 MW 2024 0.5–1.5 SwifterwinT, Vattenfall [77]
Map
Offshore wind farm locations (interactive map)

Future offshore wind farms

[edit]
Wind farm[78] Capacity (MW) Tender Planned Commissioning
IJmuiden Ver Gamma 2000 2025 2031
Nederwiek (Zuid) I 2000 2025 2030
Nederwiek (Noord) II 2000 2026 2032
Nederwiek (Noord) III 2000 2026 2031
Doordewind I 2000 2027 2032
Ten noorden van de Waddeneilanden I 700 2027 2033
Hollandse Kust (West) VIII 700 - -

Offshore grid

[edit]

Early offshore wind farms were responsible for installing their own offshore grid infrastructure to connect their wind farm to the main electricity grid. From 2016 onwards, the national grid operator TenneT has been designated as the offshore grid operator and is responsible for the construction of transmission infrastructure at sea.

Wind farms are connected via standardised connections of 700 megawatts (MW) AC or 2 gigawatts (GW) HVDC for larger wind farms located further offshore. Through the standardisation of these offshore platforms, the government hopes to significantly reduce the overall development, construction and maintenance costs.[79][80]

Luchterduinen

[edit]
Princess Amalia Wind Farm in the North Sea

The Eneco Luchterduinen wind farm was officially opened in September 2015 and is a 50/50 joint venture between Dutch energy company Eneco and Japan's Mitsubishi corporation. The 129 MW Eneco Luchterduinen wind farm is located 23 km off the coast between Zandvoort and Noordwijk cities in the Netherlands. The farm consists of 43 Vestas V112 turbines of 3 MW capacity each.[81]

Princess Amalia

[edit]

In 2008, a second, somewhat larger offshore wind farm was built: the Princess Amalia Wind Farm, consisting of 60 Vestas V80 2MW turbines totaling 120 MW, sufficient to power 125,000 homes and help the Netherlands cut 225,000 tonnes of carbon dioxide emissions.[82] [83] The wind park was developed off the coast of IJmuiden by Econcern and Eneco Energie, at a total cost of $522.3 million.[84]

Egmond aan Zee (OWEZ)

[edit]

In 2006, the Egmond aan Zee Offshore Wind Farm was built, consisting of 36 Vestas V90 3MW turbines, totaling 108 MW, sufficient to light 100,000 houses.[85] [86] [87] The project cost $272 million and is cooperatively owned by Royal Dutch Shell and the Dutch utility company Nuon.

Lely

[edit]
Lely Offshore Wind Farm

Lely was the first offshore wind farm in the Netherlands. Construction began in 1992 and the farm was completed in 1994. The nearshore wind farm had 4 Nedwind 500 KW turbines located 1 km to shore.

In 2014 one of the turbines lost its rotor with both blades due to metal fatigue.[88] The 4 wind turbines were eventually dismantled in 2016, after 22 years of service.[89]

See also

[edit]

Notes

[edit]
  1. ^ a b c d Calculated value from total installed nameplate capacity and actual electricity generation. Statistical artifacts possible if new capacity was added late in the year

References

[edit]
  1. ^ a b "WindStats". Bosch and van Rijn. Retrieved 2 May 2024.
  2. ^ a b "Renewable electricity; production and capacity". opendata.cbs.nl (in Dutch). Retrieved 5 June 2023.
  3. ^ a b Blunt, Elizabeth. "Exploiting wind power in Holland." BBC News. N.p., 13 November 2000. Web. 14 October 2009. <http://news.bbc.co.uk/2/hi/europe/1021714.stm>.
  4. ^ "Dutch government supercharges offshore wind target". 21 March 2022.
  5. ^ a b c d "Global Wind Report 2015, 61".
  6. ^ "Statistieken". windstats.nl. Retrieved 3 January 2023.
  7. ^ "Windvermogen in Nederland, 1990-2019 | Compendium voor de Leefomgeving". www.clo.nl. Retrieved 24 February 2021.
  8. ^ Diest, Erik Van (20 January 2021). "Windenergie maakt forse inhaalslag in 2020". NWEA (in Dutch). Retrieved 24 February 2021.
  9. ^ Goals Dutch Government 2020,
  10. ^ a b "IEA Wind Annual Report for 2015 (Netherlands)".
  11. ^ "The Windpower, Netherlands, Manufacturers".
  12. ^ a b "Noordoostpolder wind farm". 19 June 2018.
  13. ^ "Sun and Wind Energy". 9 November 2015.
  14. ^ "Dutchwind".
  15. ^ "New Offshore Wind Energy Roadmap | RVO.nl".
  16. ^ "Drie nieuwe windparken in de Noordzee". nos.nl (in Dutch). 27 March 2018. Retrieved 1 April 2018.
  17. ^ "Windenergie op zee". rijksoverheid.nl (in Dutch). 11 August 2016. Retrieved 1 April 2018.
  18. ^ 4C Offshore, Key project dates for Gemini [2], accessed 22 January 2017
  19. ^ https://www.government.nl/latest/news/2016/07/05/netherlands-offshore-wind-farm-borssele-cheapest-world-wide [verification needed]
  20. ^ http://www.windpoweroffshore.com/article/1401396/updated-dong-wins-borssele-tender-%e2%82%ac7270-mwh [verification needed]
  21. ^ http://www.bakermckenzie.com/en/insight/publications/2016/07/dong-energy-wins-first-borssele-offshore-wind/ [verification needed]
  22. ^ Offshore Wind Power Research, WE@Sea, accessed December 28th 2009. [verification needed]
  23. ^ "Offshore wind farm opens off the coast of the Netherlands". The New York Times. 18 April 2007. Retrieved 14 October 2009. [verification needed]
  24. ^ a b "Windenergie op land; productie en capaciteit per provincie Windenergy on land; production and capacity per province". Retrieved 16 November 2014.
  25. ^ "Windenergie; elektriciteitsproductie, capaciteit en windaanbod per maand (Windenergy; electricity production, capacity and wind per month)". CBS StatLine. Retrieved 16 November 2014.
  26. ^ Hudson, Alexandra. "Dutch build towering wind turbines out at sea." Reuters. [verification needed]
  27. ^ "Werken aan een nieuwe toekomst met windenergie". Windkoepel (in Dutch). Retrieved 2 March 2021.
  28. ^ "GE Renewable Energy's Cypress onshore wind turbine selected for repowering project in the Netherlands | GE News". www.ge.com. Retrieved 24 July 2023.
  29. ^ "Vestas adds 257 MW order in Netherlands at Windplan Groen complex". www.vestas.com. Retrieved 24 July 2023.
  30. ^ Elzo (29 March 2024). "Windplan Groen officieel in gebruik als grootste windpark op land in Nederland". Windplan Groen (in Dutch). Retrieved 2 May 2024.
  31. ^ "Feiten & cijfers". Windpark Noordoostpolder (in Dutch). Retrieved 24 February 2021.
  32. ^ "Home". Windpark Wieringermeer (in Dutch). Retrieved 25 February 2021.
  33. ^ "Home". Windplanblauw (in Dutch). Retrieved 2 March 2021.
  34. ^ "Windpark Zeewolde – Windpark Zeewolde". windparkzeewolde.nl. Retrieved 2 March 2021.
  35. ^ "Windpark De Drentse Monden en Oostermoer - Home". De Drentse Monden en Oostermoer (in Dutch). Retrieved 25 February 2021.
  36. ^ RWE. "Windpark Westereems". www.group.rwe (in Dutch). Retrieved 24 February 2021.
  37. ^ "Windpark N33". www.windparkn33.nl. Retrieved 24 February 2021.
  38. ^ a b c d e "The Windpower, List of wind farms".
  39. ^ Eneco. "Windpark Maasvlakte 2". Windpark Maasvlakte 2 (in Dutch). Retrieved 22 February 2022.
  40. ^ "Home".
  41. ^ "Windpark Kroningswind".
  42. ^ "Eneco en Vattenfall openen Windpark Slufterdam 2.0 met dubbel zoveel vermogen". Haven van Rotterdam (in Dutch). 12 February 2019. Retrieved 25 February 2021.
  43. ^ "Windpark Deil – Duurzame voorsprong in Deil" (in Dutch). Retrieved 24 February 2021.
  44. ^ "Windpark Nij Hiddum-Houw". Nij Hiddum-Houw (in Dutch). Retrieved 3 March 2023.
  45. ^ "Princess Alexia (Zuidlob) Wind Farm". Retrieved 14 March 2017.
  46. ^ "BMW drives Vattenfall storage". 14 March 2017. Retrieved 14 March 2017.
  47. ^ "Knak in windmolen 'wereldwijd eerste'". De Stentor (in Dutch). 13 February 2006. Retrieved 10 November 2023.
  48. ^ Lankhorst, Sabine (4 January 2023). "Eemmeerdijk Wind Farm turbine collapses". Windpowernl. Retrieved 11 April 2023.
  49. ^ NoordzeeWind (Egmond aan Zee)
  50. ^ "Shell NoordzeeWind". www.shell.nl (in Dutch). Retrieved 2 April 2023.
  51. ^ OWEZ (Netherlands) offshore wind farm 4C . Retrieved: 24 August 2010.
  52. ^ Prinses Amaliawindpark
  53. ^ Princess Amalia (Netherlands) offshore wind farm 4C . Retrieved: 24 August 2010.
  54. ^ Eneco project Luchterduinen
  55. ^ Gemini Offshore Wind Park
  56. ^ "Gemini Offshore Wind Farm - Fully Commissioned - Netherlands | 4C Offshore".
  57. ^ Borssele 1 & 2 generates first power. Retrieved: 1. August 2020.
  58. ^ "Homepage". Blauwwind (in Dutch). Retrieved 23 February 2021.
  59. ^ "Innovation site Borssele Wind Farm Site V fully commissioned | Van Oord/". www.vanoord.com. Retrieved 21 February 2022.
  60. ^ "Vattenfall Hollandse Kust - Windpark op de Noordzee". Windpark Hollandse Kust Zuid (in Dutch). Retrieved 23 February 2021.
  61. ^ "BASF to pay €1.6Bn for green power from offshore windfarm". Riviera.
  62. ^ "Homepage". Crosswind Hollandse Kust Noord (in Dutch). Retrieved 23 February 2021.
  63. ^ "Ecowende chooses Vestas wind turbines for Hollandse Kust West wind farm - Ecowende". ecowende.nl. Retrieved 22 December 2023.
  64. ^ "Wind energy in Europe in 2019 - Trends and statistics". WindEurope. Retrieved 12 October 2020.
  65. ^ Buljan, Adrijana (24 July 2024). "TotalEnergies Buys Into RWE's Dutch Offshore Wind Farm to Produce Green Hydrogen; Contracts Signed with Main Suppliers". Offshore Wind. Retrieved 14 August 2024.
  66. ^ a b "Noordzeker and Zeevonk II receive permits for the largest Dutch wind farms in the North Sea". RVO.nl. Retrieved 12 June 2024.
  67. ^ "Sail away of TenneT's Hollandse Kust (West Alpha) substation". YouTube. 6 September 2023.
  68. ^ "Load out of TenneT's Hollandse Kust (West Alpha)". YouTube. 10 August 2023.
  69. ^ Lely (Netherlands) offshore wind farm 4C . Retrieved: 24 August 2010.
  70. ^ "Irene Vorrink: a nearshore wind farm". Vattenfall Power Plants. Retrieved 28 February 2022.
  71. ^ "Nearshore Wind Farm to Be Dismantled". Offshore Wind. 8 March 2022.
  72. ^ "Feiten, cijfers en planning – Westermeerwind" (in Dutch). Retrieved 23 February 2021.
  73. ^ "Netherlands' Friesland province to invest in 320-MW wind park". Renewables Now. Retrieved 27 March 2017.
  74. ^ "Homepage". Windpark Fryslân (Dutch). Retrieved 27 March 2017.
  75. ^ "Largest Freshwater Offshore Wind Farm At Full Tilt". Offshore Wind. 8 December 2021.
  76. ^ "Fryslan Wind Farm, a near-shore wind project in Netherlands". Archived from the original on 12 May 2021.
  77. ^ "Waar komt het windpark?". Windplanblauw (in Dutch). Retrieved 4 April 2021.
  78. ^ Klimaat, Ministerie van Economische Zaken en (25 April 2024). "Kamerbrief over update aanvullende routekaart wind op zee - Kamerstuk - Rijksoverheid.nl". www.rijksoverheid.nl (in Dutch). Retrieved 2 May 2024.
  79. ^ "Offshore Grid". Noordzeeloket UK. Retrieved 17 March 2023.
  80. ^ "Offshore projects Netherlands". TenneT. Retrieved 17 March 2023.
  81. ^ "Power Technology.com". Power Technology.
  82. ^ "Windenergie op land; productie en capaciteit per provincie (Windenergy on land; production and capacity per province". Retrieved 16 November 2014. [verification needed]
  83. ^ Hudson, Alexandra. "Dutch build towering wind turbines out at sea." Reuters. [verification needed]
  84. ^ Hudson, Alexandra. "Dutch build towering wind turbines out at sea." Reuters. [verification needed]
  85. ^ "Offshore wind farm opens off the coast of the Netherlands". The New York Times. 18 April 2007. Retrieved 14 October 2009. [verification needed]
  86. ^ "Windenergie op land; productie en capaciteit per provincie (Windenergy on land; production and capacity per province". Retrieved 16 November 2014. [verification needed]
  87. ^ The Select Committee for Energy Independence and Global Warming. "In the sea, the Netherlands finds threats, hope." The Select Committee for Energy Independence and Global Warming. N.p., n.d. Web. 14 Oct.Q7 doesn't exist 2009.<http://globalwarming.house.gov/impactzones/netherlands>. [verification needed]
  88. ^ annevisser (30 December 2014). "Lely Shut Down as Nuon Investigates Turbine Malfunction". Offshore Wind. Retrieved 11 April 2023.
  89. ^ "offshoreWIND.biz". 28 September 2016.