Jump to content

List of major power stations in Tianjin

From Wikipedia, the free encyclopedia

This article lists the major power stations located in Tianjin.

Non-renewable

[edit]

Coal-based

[edit]
Station Name in Chinese Coordinates Capacity (MW) Operational units Underconstructed units Reference
Beijiang Power Station 北疆电厂 39°13′08″N 117°55′50″E / 39.21889°N 117.93056°E / 39.21889; 117.93056 (Beijiang Power Station) 4,000 4*1000MW
Panshan Power Station 盘山电厂 39°58′47″N 117°27′41″E / 39.97972°N 117.46139°E / 39.97972; 117.46139 (Panshan Power Station) 2,200 2*500MW, 2*600MW
Junliangcheng Power Station 军粮城电厂 39°03′13″N 117°24′41″E / 39.05361°N 117.41139°E / 39.05361; 117.41139 (Junliangcheng Power Station) 1,850 4*200MW, 3*350MW
Dagang Power Station 大港电厂 38°46′30″N 117°29′38″E / 38.77500°N 117.49389°E / 38.77500; 117.49389 (Dagang Power Station) 1,314 4*328.5MW
Yangliuqing Power Station 杨柳青电厂 39°09′05″N 117°02′15″E / 39.15139°N 117.03750°E / 39.15139; 117.03750 (Yangliuqing Power Station) 1,300 2*350MW, 2*300MW [1]

Gas-based

[edit]
Station Name in Chinese Coordinates Capacity (MW) Operational units Underconstructed units Reference
Chentangzhuang Gas Power Station 陈塘庄热电厂煤改气 38°57′43″N 117°11′08″E / 38.96194°N 117.18556°E / 38.96194; 117.18556 (Chentangzhuang Gas Thermal Power Station) 1,800 2*900MW
Junliangcheng Gas Power Station 军粮城电厂 39°03′20″N 117°24′29″E / 39.05556°N 117.40806°E / 39.05556; 117.40806 (Junliangcheng Power Station) 650 650MW
Lingang Gas Thermal Power Station 天津临港燃机热电 38°55′25″N 117°43′42″E / 38.92361°N 117.72833°E / 38.92361; 117.72833 (Lingang Thermal Power Station) 477 1*477MW
Huadian Fuyuan Thermal Power Station 天津华电福源热电 39°26′05″N 116°59′03″E / 39.43472°N 116.98417°E / 39.43472; 116.98417 (Huadian Fuyuan Thermal Power Station) 400 2*200MW [2]

Renewable

[edit]

Wind

[edit]
Station Name in Chinese Coordinates Operational capacity (MW) Status Units Reference
Dashengtang Wind Power Farm 大神堂风电场 26 Operational 13*2MW [3]

References

[edit]
  1. ^ "建设能源项目 服务天津民生". China Economic Herald. 2010-05-29. Archived from the original on 2011-07-07.
  2. ^ "天津华电福源热电一期工程2号机组圆满完成168小时试运移交投产". www.hlfdw.com. Retrieved 2018-09-29.
  3. ^ "天津首座风电场投入运行". People's Daily. 2010-09-07. Archived from the original on 2011-07-19.