Jump to content

Guangxi Bailong Nuclear Power Project

Coordinates: 21°32′43″N 108°17′38″E / 21.54528°N 108.29389°E / 21.54528; 108.29389
From Wikipedia, the free encyclopedia
Guangxi Bailong Nuclear Power Project
Map
CountryPeople's Republic of China
LocationBailong, Jiangshan Peninsula, Gangkou, Fangchenggang, Guangxi
Coordinates21°32′43″N 108°17′38″E / 21.54528°N 108.29389°E / 21.54528; 108.29389
StatusProposed
OperatorGuangxi Nuclear Power Company
Nuclear power station
Reactor typeCAP1000, CAP1400
Power generation
Units planned4 × 1400 MW
Units under const.2 × 1250 MW
Nameplate capacity2,500 MW

Guangxi Bailong Nuclear Power Project (simplified Chinese: 广西白龙核电项目; traditional Chinese: 廣西白龍核電項目; pinyin: Guǎngxī bái lóng hédiàn xiàngmù) is a nuclear power plant proposed in Fangchenggang, near Bailong Village ( 白龙村 ), autonomous region of Guangxi (Guangxi Zhuang Autonomous Region) in China. A total of six reactors are planned to operate at the Bailong site. Units 1 and 2 are both CAP1000s, units 3–6 are planned to be based on CAP1400 reactors.

The plant is located about 24 kilometres from the border with Vietnam, about 30 km (19 mi) from Fangchenggang Nuclear Power Plant,

The signing ceremony for the construction of the first phase was held in Nanning in July 2006 with construction to commence in 2008.[1]

Latest report indicates that reactor 1 will start construction on 12/30/21, with reactor 2 starting construction 10 months later. Reactor 1 is scheduled to be commissioned by August 2026, while reactor 2 will be commissioned by June 2027. Total project cost will be 390 billion yuan, or about $61.1 billion at current exchange rate (Oct 2021).[2]

Reactor data

[edit]

The Guangxi Bailong Nuclear Power Plant consist of 2 reactors under construction, and 4 reactors planned.

Unit Type Construction start Operation start Notes
Phase I
Bailong 1 CAP-1000 unknown
Bailong 2 CAP-1000 unknown
Phase II
Bailong 3 CAP-1400
Bailong 4 CAP-1400
Bailong 5 CAP-1400
Bailong 6 CAP-1400

See also

[edit]

References

[edit]
  1. ^ "Guangxi builts 6-mln-kw nuclear power station". China Daily. 25 July 2006. Retrieved 25 September 2019.
  2. ^ "广西白龙核电最新进展! - 北极星核电网". news.bjx.com.cn. Retrieved 2021-10-23.