Jump to content

Elias MRT station

Coordinates: 1°23′02″N 103°56′17″E / 1.384°N 103.938°E / 1.384; 103.938
From Wikipedia, the free encyclopedia

Elias
 CP2 


伊莱雅
இலியாஸ்
Future Mass Rapid Transit (MRT) station
Elias MRT station construction site
General information
Coordinates1°23′02″N 103°56′17″E / 1.384°N 103.938°E / 1.384; 103.938
Owned byLand Transport Authority
Line(s)
Platforms2 (2 side platforms)
Construction
Structure typeUnderground
Depth40 metres (130 ft)[1]
AccessibleYes
History
Opening2032; 8 years' time (2032)
ElectrifiedYes
Services
Preceding station Mass Rapid Transit Following station
Pasir Ris
Terminus
Cross Island Line
Punggol Extension
Future service
Riviera
towards Punggol
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Elias
Elias station in Singapore

Elias MRT station /ɪˈləs/ is a future underground Mass Rapid Transit station. It is on the Cross Island line (CRL), and is located in Pasir Ris, Singapore.[2][3]

This station will be part of a future extension between the Pasir Ris and Punggol stations on the Cross Island line. Elias MRT station will be situated at the junction of Pasir Ris Drive 10 and Pasir Ris Drive 3, around the military training area that will be cleared by 2022.[4]

History

[edit]

On 10 March 2020, the Land Transport Authority (LTA) announced that Elias station would be part of the proposed Cross Island line (CRL). The station will be constructed as part of Punggol extension, consisting of four stations between Pasir Ris and Punggol, and was expected to be completed in 2031.[5][6] However, the restrictions imposed on construction works due to the COVID-19 pandemic has led to delays and the dates were pushed by one year to 2032.[7]

The contract for the design and construction of Elias station and associated tunnels was awarded on 30 January 2023 to a joint venture between CES_SDC Pte. Ltd. (formerly Sembcorp Design and Construction Pte Ltd.) and Chip Eng Seng Contractors Pte Ltd for S$562 million (US$419.4 million).[1] Construction will start in the 2nd quarter of 2023 with an expected completion date of 2032.[8] A roadshow on the station's construction was held on 4 May 2024.[9]

References

[edit]
  1. ^ a b Aqil, Hamzah (30 January 2023). "LTA awards $562m contract for MRT station, tunnels; extension to benefit over 40,000 households". The Straits Times. Archived from the original on 30 January 2023. Retrieved 30 January 2023.
  2. ^ Yi, Wong Kai (10 March 2020). "Punggol residents to get four more train stations by 2031". The Straits Times. Archived from the original on 10 March 2020. Retrieved 10 March 2020.
  3. ^ "LTA | News Room | news-releases | Cross Island Line – Punggol Extension: Better Rail Connectivity for Punggol and Pasir Ris Residents". www.lta.gov.sg. Archived from the original on 10 March 2020. Retrieved 10 March 2020.
  4. ^ "Punggol extension on Cross Island Line to begin construction in 2022". CNA. Archived from the original on 10 March 2020. Retrieved 10 March 2020.
  5. ^ "LTA | News Room | news-releases | Cross Island Line – Punggol Extension: Better Rail Connectivity for Punggol and Pasir Ris Residents". www.lta.gov.sg. Archived from the original on 10 March 2020. Retrieved 10 March 2020.
  6. ^ Yi, Wong Kai (10 March 2020). "Punggol and Pasir Ris residents to get four more train stations by 2031". The Straits Times. Archived from the original on 10 March 2020. Retrieved 8 December 2020.
  7. ^ "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Updates on Thomson East Coast Line, Jurong Region Line and Cross Island Line". mot.gov.sg. Archived from the original on 17 May 2021. Retrieved 17 May 2021.
  8. ^ "LTA Awards Final Civil Contract for Cross Island Line-Punggol Extension". LTA. 30 January 2023. Archived from the original on 30 January 2023. Retrieved 30 January 2023.
  9. ^ "Elias MRT Station Roadshow @Vue8". FormSG. Archived from the original on 1 May 2024. Retrieved 27 May 2024.