Jump to content

Brown Line (Bangkok)

From Wikipedia, the free encyclopedia
MRT Brown Line
รถไฟฟ้าสายสีน้ำตาล

 13 
Overview
StatusDesign phase, planned tender in late 2024
OwnerMass Rapid Transit Authority of Thailand
LocaleBangkok and Nonthaburi, Thailand
Termini
Stations20
Service
TypeMonorail
SystemMRT
Daily ridershipest. 70,000-80,000
Technical
Line length22.1 kilometers (13.7 mi) (est.)
Number of tracks2 monorail tracks
CharacterElevated
Operating speed80 km/h (50 mph)
Route map

MRT Purple Line Bang Krasor Right arrow
Nonthaburi Civic Center
MRTA Pink Line Khae Rai Right arrow
MRT Purple Line Ministry of Public Health Right arrow
Ngam Wong Wan 2 Akkanee
Ngam Wong Wan 18 Chulakasem
Chinnakhet
Dark Red Line Left arrow Wat Samian Nari - Thung Song Hong Right arrow
Airport Link
Bang Khen
Kasetsart Gate 2
Sukhumvit Left arrow Royal Forest DepartmentSena Nikhom Right arrow
Yaek Kaset(Kasetsart University)
Klong Bang Bua
Prasert Manukitch - Lat Pla Klao
Prasert Manukitch - Sena Nikhom
Satriwithaya 2
Grey Line Left arrow Nuanchan – Klong Lamchiak Right arrow
Chalong Rat Expressway
Klong Lamchiak
Nuanchan
Prasert Manukitch - Nawamin
Pho Kaew
Inthrarak
Nawaminphirom Park
National Housing Authority
MRT Orange Line Left arrow Si Burapha - Ram Khamhaeng 34 Right arrow
MRTA Yellow Line Left arrow Si KrithaBang Kapi Right arrow
Yaek Lam Sali

The MRT Brown Line is a 22.1 km rapid transit line in Bangkok, Thailand proposed monorail mass transit line from Nonthaburi Civic Centre, Nonthaburi Province to Lam Sali intersection, Bang Kapi District. 20 stations are proposed for the line and the expected cost for the project is 48 billion baht. The line has been integrated for 7.2 km with the N2 expressway project and a feasibility study has been completed. The MRT Brown line will interchange with 7 other mass transit lines.

The MRT Brown line investment plan was approved by the MRTA Board in June 2019 for final detailed design,[1] which was expected to be completed by December 2020. However, the detailed design will take longer and is not expected to be completed until September 2022.[2] In mid May 2022, the MRTA received updated consultants studies and started drafting the TOR for the project.[3] On 18 May 2023, the MRTA Board meet to approve the updated designs & analysis and draft tender documents for the line. The documents will be submitted to the Ministry of Transport in the coming months.[4]

The project will seek final Cabinet approval in early 2024 and is now planned to be tendered as a PPP project in late 2024.

Route Alignment

[edit]

The MRT Brown Line starts at Nonthaburi Civic Centre where it interchanges with both the MRT Purple Line & MRT Pink Lines. It heads east along Ngam Wong Wan road through Khae Rai intersection and then Vihavadi-Rangsit road to interchange with the SRT Dark Red Line at Bang Khen. The Brown line continues past Kasetsart University to interchange with the BTS Sukhumvit Line at Kasetsart University on Phahon Yothin Road.

The line continues east along Prasote Manukitch Road (AKA Kaset-Nawamin Road) past Chalong Rat Expressway (interchanging with the proposed BMA Grey Line) to Nawamin Road. The line then turns south along Nawamin Road over Lam Phang Phuai lake and past Klong Chan Stadium. The line continues further southeast along Nawamin Road where it then terminates at Ramkhamhaeng rd (soi 129/1), Lam Sali junction to interchange with the MRT Orange Line and MRT Yellow Line.

History

[edit]

The line was first proposed as the Gold Line by the Pheu Thai party (พรรคเพื่อไทย) for the Bangkok Governors election held in March 2013. This was in response to objections by Kasetsart University and as an alternative to a long-proposed elevated Expressway extension, the N2 expressway project.[5] However, the Pheu Thai candidate did not win the election and the Gold Line proposal was dropped with the then Deputy Minister of Transport stating that land appropriation costs were too high.[6] (The Gold Line name was later used for the BMA Gold Line ).

Subsequently, the Office of Transport and Traffic Policy and Planning (OTP) reworked the Gold Line proposal into a new MRT Brown Line monorail proposal and this was endorsed by the MRTA Board in August 2013.[7] The route was under preliminary study by OTP from June 2013, but did not progress much before the May 2014 coup and change of government.[8] Subsequently, the route was finalised by OTP and public hearings into the project were held during 2017 as the government proposed integrating the design with a new expressway. In mid-2017, the MOT announced that a final feasibility study would be completed over 14 months.

Note: This line is not to be confused with the original OTP 2004 13 km MRT Brown Line proposal from Bangkapi to Min Buri which was taken to the 2005 election. In 2009, this plan was subsequently changed and the original 13  km Brown Line was merged into an extended MRT Orange Line, which is currently under construction.

Progress

[edit]

In August 2013, the MRTA approved the MRT Brown line in principle to complete the design by 2016 with an expected 3-year construction period for a 2021 opening.[9] However, the line was delayed while a long planned expressway along much of the same route was prioritized.[10] Public hearings on the Brown line was held in 2017. The MOT announced that a 14-month feasibility study into the line would be completed by 2018.[11]

The feasibility study was undertaken during the same period where design for the N2 expressway (which runs along Kaset-Namawin rd) was being finalised by EXAT without catering for the MRT Brown Line. Work was expected to commence on the expressway in 2019.[12] OTP and MOT subsequently proposed an integrated design and construction of the Brown Line jointly with the N2 expressway which was approved by Cabinet. However, the Brown Line crossing of Vihavadi-Rangsit rd and the Don Muang elevated expressway might require a diversion of the Brown Line further north for the line to pass at this point depending on the final route design of the N2 expressway.[13] In February 2018, OTP confirmed that the study integrating the MRT Brown Line with the Expressway design would be done by June 2018.[14]

By August 2018, OTP had completed the feasibility study and conducted public hearings. Although, there was much public support for building the MRT Brown line, public opposition to the N2 expressway remained high. OTP intended to submit the project for Cabinet approval by the end of October 2018.[15] In early June 2019, the MRTA Board approved the investment plan for the Brown Line and integrated design with the N2 Expressway conducted by EXAT.[16] The design process was expected to be completed by late 2020 after further discussions regarding land access around Kasetsart University were conducted between EXAT, the MRTA, the Rural Highways Department and Kasetsart University in June 2020.[17] In early November 2020, the MRTA Governor stated that the OTP had submitted the preliminary Environment (EIA) to the National Environment Board for review and that land expropriation surveys in some areas along the route were still being finalised.[18] Final design was expected to be completed by December 2020.[19] However, the detailed design will take longer and is not expected to be completed until September 2022.[20]

The line will require the 435 plots of land along the route to be appropriated in order for the line to be built.[21]

In May 2023, the MRTA approved another feasibility study to be completed by December 2023 with construction tentatively starting from 2025.[22]

Stations

[edit]

The 22.1 km Brown line is proposed to have 20 stations:

Note: Station names are provisional.

Code Station Name Transfers Province
BR01 Nonthaburi Civic Center  MRT   MRT  Nonthaburi
BR02 Khae Rai
BR03 Khlong Yat Lao (Ngam Wong Wan 12) Bangkok
BR04 Pracha Chuen intersection
BR05 Chinnakhet
BR06 Bang Khen  SRT  Bang Khen Station
BR07 Kasetsart University (Gate 2)
BR08 Kasetsart University  BTS  Kasetsart University
BR09 Bang Bua
BR10 Lat Pla Khao
BR11 Prasoet Manu Kit 18
BR12 Sukhonthasawat
BR13 Chalong Rat  MRL  Kaset Nawamin (proposed)
BR14 Khlong Lamchiak
BR15 Nuan Chan 11
BR16 Yaek Nawamin
BR17 Inthrarak
BR18 Nawamin Phirom
BR19 Seri Thai/Khlong Chan Stadium
BR20 Yaek Lam Sali  MRT  (under construction)  MRT 

Network Map

[edit]

See also

[edit]

References

[edit]
  1. ^ "บอร์ดรฟม.ไฟเขียวควักเอง 1.4 พันล้านสร้างฐานรากรถไฟฟ้าสายสีน้ำตาล คาดสร้าง". 6 June 2019.
  2. ^ "รฟม.จ้างทบทวนออกแบบโมโนเรลสายใหม่"สีน้ำตาล"". Daily News. 29 November 2021.
  3. ^ "ได้เวลาลุย! รถไฟฟ้าสายใหม่ "สีน้ำตาล" 4.8หมื่นล้าน". Daily News. 15 May 2022.
  4. ^ "รถไฟฟ้าสายใหม่ "สีน้ำตาล" วัดใจรัฐบาลได้ไปต่อหรือล้ม". Daily News. 23 May 2023.
  5. ^ "Changing MRT line near Kasetsart will cost B10bn". Bangkok Post. 7 December 2019.
  6. ^ "City expressway plan redrawn to go north". Bangkok Post.
  7. ^ "MRTA endorses Brown Line (Khae Rai-Lam Salee)". The Nation. 21 August 2013.
  8. ^ Brown Line on Facebook
  9. ^ "MRTA endorses Brown Line (Khae Rai-Lam Salee)". The Nation. Bangkok. 21 August 2013. Retrieved 6 November 2013.
  10. ^ "ผู้จัดการออนไลน์ รวดเร็ว สด ทุกเหตุการณ์".
  11. ^ "Govt mulls Brown Line feeder route to connect rail network". Bangkok Post. 27 July 2017.
  12. ^ "กทพ.ลุ้น สผ.เคาะ EIA ทางด่วน N2 จ่อชง ครม.ปลายปีนี้ เริ่มก่อสร้างปี 61". 18 September 2017.
  13. ^ "เคาะรถไฟสายสีน้ำตาล เสนอ'บิ๊กตู่'พิจารณามี.ค.นี้.... อ่านต่อได้ที่". Post Today. 24 January 2018.
  14. ^ "Brown Line monorail, expressway take shape". Bangkok Post. 20 February 2018.
  15. ^ "Monorail plan heads to cabinet". Bangkok Post. 24 August 2018.
  16. ^ "บอร์ดรฟม.ไฟเขียวควักเอง 1.4 พันล้านสร้างฐานรากรถไฟฟ้าสายสีน้ำตาล คาดสร้าง". 6 June 2019.
  17. ^ "โมเดล "โดมครอบทางด่วน" ลุ้น "ม.เกษตร" เปิดทางปักตอม่อ". Prachachat.net. 23 June 2020.
  18. ^ "รฟม.เดินหน้าออกแบบฐานรากตอม่อสายสีน้ำตาล พร้อมลุยเปิดประมูลปี 66". Matichon Online. 4 November 2020.
  19. ^ "บอร์ดรฟม.ไฟเขียวควักเอง 1.4 พันล้านสร้างฐานรากรถไฟฟ้าสายสีน้ำตาล คาดสร้าง". 6 June 2019.
  20. ^ "รฟม.เดินหน้าออกแบบฐานรากตอม่อสายสีน้ำตาล พร้อมลุยเปิดประมูลปี 66". Daily News. 29 November 2021.
  21. ^ "รถไฟฟ้าสายใหม่ "สีน้ำตาล" วัดใจรัฐบาลได้ไปต่อหรือล้ม". Daily News. 23 May 2023.
  22. ^ "Brown Line work could start in 2025". inkl. 2023-05-23. Retrieved 2024-02-28.
[edit]