Jump to content

Yerwada metro station

Coordinates: 18°32′43″N 73°53′11″E / 18.545265°N 73.886498°E / 18.545265; 73.886498
From Wikipedia, the free encyclopedia

Yerwada
logo of Pune Metro Pune Metro station
General information
LocationYerwada, Pune, Maharashtra 411006
Coordinates18°32′43″N 73°53′11″E / 18.545265°N 73.886498°E / 18.545265; 73.886498
Owned byMaharashtra Metro Rail Corporation Limited (MAHA-METRO)
Operated byPune Metro
Line(s)Aqua Line
PlatformsSide platform
Platform-1 → Ramwadi
Platform-2 → Vanaz
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes Disabled access
Other information
Station codeYER
History
Opened21 August 2024; 4 months ago (2024-08-21)
Electrified25 kV 50 Hz AC overhead catenary
Services
Preceding station logo of Pune Metro Pune Metro Following station
Bund Garden
towards Vanaz
Aqua Line Kalyani Nagar
towards Ramwadi
Location
Map

Yerwada metro station is the elevated eastern terminal metro station on the East - West corridor of the Aqua Line of Pune Metro in Pune, India. It is connected to Rainbow Bus Rapid Transit System.[1] Aqua Line operates between Vanaz and Ramwadi stations.[2] The facade of the station showcases an illustration of Dandi March and a charkha, both of which are inspired by and a tribute to Mahatma Gandhi.[3]

The three metro stations on the extended stretch of the Aqua Line were inaugurated on 6 March 2024. However, the work on revised entry-exit points of Yerwada station delayed its initial commercial operation for more than a month.[4][5] Later, it was expected to open in May 2024 as the work was supposed to complete by the end of April 2024.[6] Due to ongoing work and pending inspection, the opening was further delayed to July 2024.[7] The inspection by CMRS was slated to be completed by 20 July 2024 and then opened to public by the end of July 2024.[8] Eventually, it was inaugurated for commercial operation on 21 August 2024.[9] The shuttle service of bus no.19 by PMPML from Ramwadi metro station to Pune Airport was shifted to Yerwada with immediate effect after the latter was inaugurated.[10]

Station layout

[edit]
Bund Garden track layout
P2
P1
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 1
Eastbound
Towards → Ramwadi
Next Station: Kalyani Nagar
Platform 2
Westbound
Towards ← Vanaz
Next Station: Bund Garden
Side platform | Doors will open on the left Disabled access
L3

Entry/Exit

[edit]

See also

[edit]

References

[edit]
  1. ^ "Feeder buses to link Yerawada Metro station with Pune airport". The Indian Express. 12 December 2023. Retrieved 7 March 2024.
  2. ^ "Comfortable, convenient & economic: Citizens on Metro launch till Ramwadi". The Times of India. 7 March 2024. ISSN 0971-8257. Retrieved 7 March 2024.
  3. ^ "With wadas, pagdis and Dandi March, Pune Metro to offer a ride through city's culture, history". The Indian Express. 21 December 2022. Retrieved 21 April 2024.
  4. ^ "Demand grows to replan entry-exit points to Yerawada Metro station in Pune". The Times of India. 6 October 2023. ISSN 0971-8257. Retrieved 7 March 2024.
  5. ^ "Month-long wait before Yerawada Metro station becomes operational". The Times of India. 28 February 2024. ISSN 0971-8257. Retrieved 7 March 2024.
  6. ^ Dastane, Sarang (17 April 2024). "Yerawada station likely to start operations next month". The Times of India. p. 6.
  7. ^ Jedhe, Eeshwari (16 May 2024). "Yerwada Metro Station Opening Delayed: Commuters Urge Swift Completion". Pune Mirror. Retrieved 21 August 2024.
  8. ^ "Yerawada Metro station likely to open in two weeks, say officials". The Times of India. 12 July 2024. ISSN 0971-8257. Retrieved 21 August 2024.
  9. ^ "Pune Metro's Vanaz Ramwadi phase fully functional Yerwada station opens today". The Indian Express. 20 August 2024. Retrieved 21 August 2024.
  10. ^ "Pune Metro Airport Shuttle Bus Service No. 19 Moves to Yerwada Metro Station". Pune Mirror. 24 August 2024. Retrieved 25 August 2024.
[edit]