Thiess Contractors Indonesia
Appearance
Company type | Private |
---|---|
Industry | Mining, Construction, Civil engineering |
Founded | 1988 |
Headquarters | South Quarter, Jakarta , |
Parent | Thiess Pty Ltd |
Website | www.thiess.com |
PT Thiess Contractors Indonesia is a subsidiary of Thiess Pty Ltd, which is a wholly owned subsidiary of CIMIC Group.
History
[edit]Thiess originally commenced operations in Indonesia in 1972 when it acquired a 50% in Petrosea.[1] After Thiess was taken over by CSR in 1980, the overseas operations including Indonesia operations were sold to Leighton Contractors.[2][3]
Thiess re-entered the Indoneasian market when Thiess Contractors Indonesia was established in 1988 and, working in a joint venture with PT Mintekindo Utama Into, started undertaking mining activities.[4] Its first major mining contract was awarded in March 1989 by BHP at Senakin Mine in East Kalimantan.[5]
Ownership
[edit]Thiess Pty Ltd hold a 99% shareholding in Thiess Contractors Indonesia.[6]
References
[edit]- ^ Thiess moves into S-E Asian contracting Canberra Times 26 April 1972 page 17
- ^ CSR Offer Accepted - Thiess directors give up fight Canberra Times 12 January 1980 page 16
- ^ CSR searches for stable investment opportunity with stable investment Canberra Times 5 July 1984 page 19
- ^ Into the 1980s Thiess
- ^ "Leighton scores big Indonesia coal contract". Mining Monthly. Retrieved 3 January 2020.
- ^ CIMIC Group Annual Report for year ended 30 June 2018
Further reading
[edit]- Priest, Joan (1997). The Thiess Story. Boolarong Press.
- Raymond, Robert (1999). A Vision for Australia: The Snowy Mountain Scheme 1949-1999. Focus Publishing Pty Ltd.
- King, Stephanie (1999). Leighton: 50 Years of Achievement 1949-1999. Technical Resources Pty Ltd.