The Beacon (Cleveland)
The Beacon | |
---|---|
General information | |
Status | Completed |
Type | Residential |
Location | 515 Euclid Avenue Cleveland, Ohio |
Country | United States |
Coordinates | 41°30′01″N 81°41′23″W / 41.500262°N 81.689845°W |
Construction started | 2017 |
Completed | November 6, 2019 |
Cost | $95 million |
Height | |
Roof | 350 feet |
Technical details | |
Floor count | 29 |
Design and construction | |
Architect(s) | Westlake Reed Leskosky, Nadaaa and Vocon |
Developer | Stark Enterprises |
Website | |
www |
The Beacon is a residential skyscraper in downtown Cleveland that began construction at 515 Euclid Avenue in late 2017 and was completed in late 2019.[1] The tower rises 350 feet (110 m) tall, with approval from the city council to exceed the city's 250 feet (76 m) limit.[2] The Beacon sits at 29 floors; 8 floors of parking garage, 19 floors of one- and two-bedroom residential suites and rooftop lounge.[3]
Development and design
[edit]Part of the need for the tower was due to a resurgence of interest in downtown Cleveland, spearheaded by a 77% increase of new housing units and 95% occupancy rate from 2000 to 2015.[4][speculation?] It is the fourth-tallest residential building in the city behind the Terminal Tower, which was converted into a mixed-use residential building in 2019, The Lumen, and The 9 Cleveland.[5]
The chosen site, on the lot behind 200 Public Square on East Roadway and Euclid, had been the location of an earlier proposed apartment tower. For various reasons, mostly due to financing and design flaws, an eight-story parking garage was erected but the tower never rose.[citation needed] The winning design presented to the Cleveland City Council was by Cleveland architecture firm of Westlake Reed Leskosky and the Boston firm NADAA.[citation needed]
The Beacon is the first new residential high rise erected in Cleveland's central business district since 1974.[6] The Beacon features a façade interlocked with colored interchanging metal panels that reflects the sun.[7]
See also
[edit]References
[edit]- ^ Kosich, John (September 13, 2017). "As Beacon apartment construction begins a look at the status of other Downtown Cleveland projects". News5Cleveland.com. Retrieved November 2, 2017.
- ^ "First look: Beacon apartment tower planned atop 515 Euclid garage in downtown Cleveland (photos)". Cleveland.com. July 13, 2016. Retrieved November 2, 2017.
- ^ "Home". thebeaconcleveland.com.
- ^ "Market update" (PDF). www.downtowncleveland.com. 2017. Retrieved July 17, 2019.
- ^ Jordyn Grzelewski, The Plain Dealer (June 28, 2019). "First Look: Inside the new Terminal Tower Residences". cleveland. Retrieved November 29, 2022.
- ^ "Cleveland's first apartment addition to the downtown skyline since 1973" (PDF). Suites Magazine. Northern Ohio Apartment Associ. March 2020. Retrieved April 7, 2023.
- ^ "Start of $62 million apartment tower in downtown Cleveland set for June - Crain's Cleveland Business". CrainsCleveland.com. March 27, 2017. Retrieved November 2, 2017.