Jump to content

Template:Elkhorn Grade Electrification

From Wikipedia, the free encyclopedia
Elkhorn Grade
Electrification
Original electrification, completed in 1915[1]
0 mi
0 km
Bluefield
Bluefield Yard
3.62 mi
5.83 km
Graham
7.15 mi
11.51 km
Falls Mills
8.39 mi
13.5 km
Flat Top Yard
11.39 mi
18.33 km
Bluestone
Cooper Tunnel
12.9 mi
20.8 km
Cooper
14.35 mi
23.09 km
Ruth
Elkhorn Tunnel
14.95 mi
24.06 km
Coaldale
17.05 mi
27.44 km
Maybeury
18.85 mi
30.34 km
Ennis
20.45 mi
32.91 km
Elkhorn
21.85 mi
35.16 km
Powhatan
22.75 mi
36.61 km
Kyle
23.55 mi
37.9 km
North Fork Junction
24.05 mi
38.7 km
Keystone
25.15 mi
40.48 km
Eckman
26.15 mi
42.08 km
Landgraf
27.55 mi
44.34 km
East Vivian
28.25 mi
45.46 km
Vivian
28.75 mi
46.27 km
Vivian Yard
Substation

This is a route-map template for the initial segment of the Elkhorn Grade Electrification, from Bluefield to Vivian.

Note: Per consensus and convention, most route-map templates are used in a single article in order to separate their complex and fragile syntax from normal article wikitext. See these discussions [1],[2] for more information.

References

  1. ^ "Norfolk & Western Elkhorn Grade Electrification". Railway Age Gazette. 58 (23): 1153. June 4, 1915.