Jump to content

Line 11 (Shanghai Metro)

From Wikipedia, the free encyclopedia
(Redirected from Shanghai Metro Line 11)
Line 11
Qilianshan Road Station
Overview
Other name(s)R3 (planned name);
Shenjia line (Chinese: 申嘉线)
Native name上海地铁11号线
StatusOperational
OwnerShanghai Rail Transit Shenjia Line Development Co., Ltd. (Shanghai segment)
Kunshan Rail Transit Investment Development Co., Ltd. (Kunshan segment)
LocalePudong; Xuhui, Changning, Putuo, and Jiading districts, Shanghai, China
Kunshan, Jiangsu, China
Termini
Stations39
Service
TypeUrban rail transit in China Rapid transit
SystemShanghai Metro Shanghai Metro
ServicesMainline: Disney ResortNorth Jiading
Branchline: Disney ResortHuaqiao
Operator(s)Shanghai No. 2 Metro Operation Co. Ltd.
Depot(s)Shanghai Circuit Depot;
North Jiading parking lot;
Chuanyang River parking lot
Rolling stock82 Class A 6-car trains
Daily ridership1.012 million (2019 peak)[1]
History
CommencedDecember 30, 2005; 18 years ago (2005-12-30)
OpenedDecember 31, 2009; 14 years ago (2009-12-31)
Last extensionApril 26, 2016; 8 years ago (2016-04-26)
Technical
Line length82.4 km (51.20 mi)
Number of tracks2
CharacterUnderground, open cut + elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts DC)
Operating speed100 km/h (62 mph)
Average speed: 40.3 km/h (25 mph)[citation needed] (mainline) 38.8 km/h (24 mph)[citation needed] (branchline)
SignallingThales’ SelTracTM CBTC
Route map
Route on the Shanghai map:
To scale geographic map:

Line 11 is a northwest–southeast line of the Shanghai Metro network. Since October 2013, Line 11 serves Kunshan city, making it is the second intercity metro in China after the Guangfo Metro and the first that crosses a provincial boundary. [citation needed]With a single-line mileage of 82.386 kilometres (51.192 mi), it is the third-longest single-line subway line in China, after Line 6 in Chongqing, which is 85.6 km (53.2 mi) long and Line 7 in Wuhan with a length of 83.6 km (51.9 mi). The line is colored brown on system maps.

History

[edit]

The line 11 was originally planned to be from Jiading to Nanhui New City, with a total length of 120 kilometres (75 mi), the south part of the line has been transferred to line 16.

The 1st phase of line 11, which runs from North Jiading to Jiangsu Road, opened on 31 December 2009.[2][3] A branch line from Anting opened on 29 March 2010.[4]

The 2nd phase runs from Jiangsu Road to Luoshan Road. It opened on 31 August 2013.[5]

The 3rd phase connects Luoshan Road and the Disney Resort. This section is 9.4 kilometres (5.8 mi) long with 3 stations. All new stations except for the Disney Resort station opened on December 19, 2015.[6] The Disney Resort started to trial operation on April 26, 2016.[7]

From January 26, 2020 until March 24,[8] the Kunshan section of line 11 (Anting to Huaqiao) was suspended due to the COVID-19 pandemic.[9]

On August 25, 2020, an infill station Chenxiang Highway was opened.[10]

On February 14, 2022, the Kunshan section of line 11 was again suspended due to the COVID-19 pandemic.[11] It was reopened on the 4th of July, 2022. [12]

On September 28, 2024, an infill station Kangheng Road was opened.[13]







Shanghai Metro Line 11 opening history
Segment Commencement Opened Length Station(s) Name Investment
Jiangsu Road — North Jiading 30 Dec 2005 31 Dec 2009 33.0 km (20.51 mi) 16 Phase 1 (main section) ¥18.95 billion
Jiading Xincheng — Anting 30 Dec 2005 29 Mar 2010 12.8 km (7.95 mi) 3 Phase 1 (branch section)
East Changji Road 26 Apr 2011 Infill station 1
Luoshan Road — Jiangsu Road 19 Dec 2008 31 Aug 2013 19.2 km (11.93 mi) 12 Phase 2 ¥12.965 billion
Anting — Huaqiao 27 Oct 2010 16 Oct 2013 7.0 km (4.35 mi) 3 Huaqiao extension ¥1.849 billion
Kangxin Highway — Luoshan Road 28 May 2013 19 Dec 2015 4.10 km (2.55 mi) 2 Disney extension (1st section) ¥4.371 billion
Disney Resort — Kangxin Highway 28 May 2013 26 Apr 2016 5.08 km (3.16 mi) 1 Disney extension (2nd section)
Chenxiang Highway 25 Aug 2020 Infill station 1
Kangheng Road 28 Sep 2024 Infill station 1

Controversy

[edit]

Due to the long length of line 11 and high passenger volumes, it is common for line 11 passengers to be forced to stand on the train for their entire trip. In response to this, around early 2014, some passengers that travelled long distances between urban area and the suburban areas of Jiading or Sanlin that cannot bear standing for a long time started bringing their own small folding seats into the carriages. In the following years, the official Weibo of Shanghai Metro reminded passengers involved phenomenon to be safe and civilized as Shanghai Metro maintains that these foldable seats can be a safety hazard on trains and reduces capacity. Beginning in 2019, line 11 started having announcements in carriages to remind passengers to not bring and use their own seats on the train.[14][15]

Stations

[edit]

Service routes

[edit]


Future expansions

[edit]

Kangheng Road station

[edit]

Although Kangheng Road station is part of the second phase of Line 11, it did not open with the other stations on August 31, 2013.[26] Instead, it has been left as a reserved station under construction that will open in the future pending development in the area.[27][28] It opened on 28 September 2024.[29]

Station name change

[edit]

Headways

[edit]
Shanghai Metro Line 11 headway[30]
Time North Jiading -
Jiading Xincheng
& Huaqiao - Jiading Xincheng
Jiading Xincheng -
Nanxiang
Nanxiang -
Luoshan Road
Luoshan Road -
Disney Resort
Monday - Friday (Working Days)
AM peak 7:30-9:00 Southbound: 6 - 10 min
Northbound: 7 min and 30 sec - 10 min
Southbound: 3 min
Northbound: 3 min and 45 sec
Southbound: 2 min
Northbound: 2 min and 30 sec
Southbound: 6 min
Northbound: 7 min and 30 sec
Off-peak 9:00–17:00 About 12 min About 6 min
PM peak 17:00–19:00 Southbound: 7 min
Northbound: 6 min
Southbound: 3 min and 30 sec
Northbound: 2 min and 30 sec
Southbound: 7 min
Northbound: 6 min
Other
hours
Before 7:30
After 19:00
About 12-18 min About 5 – 7 min
Saturday and Sunday (Weekends)
Peak 8:00–20:00 10 min About 5 min
Other
hours
Before 8:00
After 20:00
About 10-12 min About 6-8 min

Technology

[edit]

Rolling Stock

[edit]
Shanghai Metro Line 11 rolling stock
Fleet numbers Manufacturer Time of
manufac-
turing
Class No
of
car
Assembly[i] Rolling stock Number Notes
396 CRRC Zhuzhou Locomotive Co., Ltd. 2008-2011 A[ii] 6 Tc+Mp+M+M+Mp+Tc 11A01 1101-1166
(110011-113961)
[31] Some of the trains are Disney-themed trains, and the inside and outside of the trains are packaged with Disney cartoon elements.
Original name: AC16.
36 CNR Changchun Railway Vehicles Co., Ltd. 2015-2016 A[ii] 6 Tc+Mp+M+M+Mp+Tc 11A02 1167-1172
(113971-114321)
60 CRRC Zhuzhou Locomotive Co., Ltd. 2015-2016 A[ii] 6 Tc+Mp+M+M+Mp+Tc 11A03 1173-1182
(114331-114921)

114381 was wrecked on December 22, 2024.[32]

  1. ^ Tc: Trailer with cab; Mp: EMU with pantograph; M: EMU without pantograph.
  2. ^ a b c Class A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.

Accident

[edit]

On 22 December 2024, a northbound train (set 1173) hit the lifting arm of a tower crane which collapsed and fell towards the track between Chenxiang Highway station and Malu station. The train's head suffered serious damages and the train stopped. Shanghai Metro announced the service suspended between Wuwei Road station and Malu station. Emergency bus shuttle service is provided after the crash. Ministry of Emergency Management sends a working group to deal with the accident.[33]

References

[edit]
  1. ^ 【 1329.4万人次】3月8日上海地铁客流创历史新高 (in Chinese). Shanghai Metro. 2019-03-09. Archived from the original on 2020-05-22. Retrieved 2019-03-09.
  2. ^ "International Railway Journal - Rail and Rapid Transit Industry News Worldwide". Archived from the original on 2009-01-22. Retrieved 2008-11-11.
  3. ^ "沪轨交9号线二期、11号线北段一期31日开通试运营".
  4. ^ 11号线支线下周一试运营 Archived 2014-01-03 at the Wayback Machine, news.163.com. Retrieved 28 March 2010.
  5. ^ "Metro extension to open next year".
  6. ^ 上海市城市快速轨道交通近期建设规划(2010-2020年)环评报告 (in Chinese). Archived from the original on April 5, 2009. Retrieved 2009-04-06.
  7. ^ "上海地铁迪士尼站下周二开站 末班车最晚22:30". Xinmin.cn. 2016-04-21. Archived from the original on 2016-05-09. Retrieved 2016-04-21.
  8. ^ "24日起上海轨交11号线恢复跨省运营". CCTV. 2020-03-23. Archived from the original on 2020-03-23. Retrieved 2020-03-24.
  9. ^ Yihong, Dong (2020-01-27). "为阻断疫情传播,上海轨交11号线花桥站至安亭站区段停运_新民社会_新民网". Xinmin.cn. Archived from the original on 2020-01-26. Retrieved 2020-01-26.
  10. ^ "上海轨道交通11号线陈翔公路站将于8月25日开通". 2020-08-23. Archived from the original on 2021-05-07. Retrieved 2020-08-24.
  11. ^ Hui, Liu (2022-02-14). "上海轨交11号线昆山段3站暂停运营". eastday.com. Archived from the original on 2022-02-19. Retrieved 2022-04-28.
  12. ^ ""又可以乘地铁上班了!"上海轨交11号线昆山段今起恢复运营". www.yzwb.net. Archived from the original on 2024-05-21. Retrieved 2024-04-16.
  13. ^ 轨道交通11号线康恒路站9月28日起开通初期运营. Shanghai Metro official WeChat account (in Chinese (China)). 2024-09-25.
  14. ^ Shanghai line 11 warns the "bench family" for the first time: Do not use your own small bench in the carriage. Xinmin Evening News. 2019-02-20
  15. ^ Xiong Yingqi. Passengers of Shanghai Metro Line 11 board the train with a bench and become a unique warning. Beijing Youth Daily. 2019-02-21.
  16. ^ 乘车指南 > Station信息. Shanghai Metro Official Site. Archived from the original on 2014-06-12. Retrieved 2015-12-17. Instructions: 点击相应线路,选择Station,点击"站层图"可查看相应Station的站台结构。
  17. ^ 上海地铁迪士尼站下周二开站 末班车最晚22:30. 新民网. 2016-04-21. Archived from the original on 2016-05-09. Retrieved 2016-04-21.
  18. ^ 11号线迪士尼段正式命名 地铁"迪士尼"站亮相. 东方网. 2014-12-10. Archived from the original on 2017-02-20. Retrieved 2021-07-12.
  19. ^ 上海地铁运管中心 (2015-12-17). 12月19日起 11、12、13号线新延伸段建成试运营. Shanghai Metro Official Site. Archived from the original on 2015-12-21. Retrieved 2015-12-17.
  20. ^ a b 上海地铁运管中心 (2013-08-29). 11号线二期8月31日起通车试运营. Archived from the original on 2013-09-01. Retrieved 2013-08-29.
  21. ^ a b c 上海轨交9号线2期11号线北段1期12月31日开通. Tencent (QQ) News. 2009-12-28. Archived from the original on 2015-12-22. Retrieved 2021-07-12.
  22. ^ "上海轨道交通11号线陈翔公路站将于8月25日开通". 2020-08-23. Archived from the original on 2021-05-07. Retrieved 2020-08-24.
  23. ^ a b 3月29日11号线支线嘉定新城—安亭通车试运营 11号线"Y型"线路运营同步覆盖早晚高峰. Shanghai Metro Official Site. 2010-03-26. Archived from the original on 2015-09-24. Retrieved 2021-07-12.
  24. ^ 11号线昌吉东路站开通 方便周边乘客. Shanghai Metro Official Site. 2011-04-28. Archived from the original on 2016-08-06. Retrieved 2021-07-12.
  25. ^ 上海地铁11号线今开通花桥段 安亭到花桥仅10分钟. 东方网. Archived from the original on 2013-10-19. Retrieved 2013-10-17.
  26. ^ Shanghai Metro (2013-08-29). 11号线二期8月31日起通车试运营 (in Chinese). Archived from the original on 2013-09-01. Retrieved 2013-08-29.
  27. ^ 途经5个区可换乘11条轨交 11号线北段二期今年内完工. Eastday (in Chinese (China)). 2012-08-05. Archived from the original on 2012-08-09. Retrieved 2021-07-07.
  28. ^ 上海市轨道交通11号线北段工程补充环境影响评价公示 Archived 2013-03-20 at the Wayback Machine (in Chinese)
  29. ^ 轨道交通11号线康恒路站9月28日起开通初期运营. Shanghai Metro official WeChat account (in Chinese (China)). 2024-09-25.
  30. ^ "Schedule" (in Chinese). Shanghai Metro. 2021-07-07. Archived from the original on 2017-11-13. Retrieved 2021-07-07.
  31. ^ 上海市轨道交通十一号线北段车辆. 中车株洲电力机车有限公司 (in Chinese). 2013-11-24. Retrieved 2020-03-20.
  32. ^ 腾讯网 (2024-12-22). "上海地铁一列车撞上"侵入"的塔吊,事发现场曝光,官方通报_腾讯新闻". news.qq.com (in Chinese (China)). Retrieved 2024-12-22.
  33. ^ "上海地铁11号线遭吊车侵入 应急管理部派出工作组赶赴现场". 央视网. 2024-12-22. Retrieved 2024-12-22.