Interstate 80 in New Jersey
Route information | ||||
---|---|---|---|---|
Maintained by NJDOT and DRJTBC | ||||
Length | 68.3 mi[1] (109.9 km) | |||
Existed | 1958[2]–present | |||
History | Completed in 1973[3] | |||
NHS | Entire route | |||
Major junctions | ||||
West end | I-80 at the Pennsylvania state line | |||
| ||||
East end | I-95 / N.J. Turnpike / CR 56 in Teaneck | |||
Location | ||||
Country | United States | |||
State | New Jersey | |||
Counties | Warren, Sussex, Morris, Essex, Passaic, Bergen | |||
Highway system | ||||
|
Interstate 80 (I-80) is a major interstate highway in the United States, running from San Francisco, California, eastward to the New York metropolitan area. In New Jersey, I-80 runs for 68.3 miles (109.9 km) from the Delaware Water Gap Toll Bridge at the Pennsylvania state line to its eastern terminus at the interchange with the New Jersey Turnpike (I-95) in Teaneck, Bergen County. I-95 continues from the end of I-80 to the George Washington Bridge for access to New York City. The highway runs parallel to US 46 through rural areas of Warren and Sussex counties before heading into more suburban surroundings in Morris County. As the road continues into Passaic and Bergen counties, it heads into more urban areas. The New Jersey Department of Transportation identifies I-80 within the state as the Christopher Columbus Highway.[4]
A freeway along the I-80 corridor had been planned in 1936 and again in 1955 to provide relief along US 46 between the George Washington Bridge and the Delaware Water Gap. With the establishment of the interstate highway system, the planned freeway, which had been identified in some planning documents as the Bergen–Passaic Expressway (which same name is also applied sometimes to I-95/Turnpike north of the I-80 interchange), was incorporated into I-80.[5] The freeway was built across New Jersey in stages from the 1960s to 1973. The westernmost four miles (6.4 km) in New Jersey was originally a rerouting of US 611 when built, although that route was later realigned back into Pennsylvania. In the 1990s, HOV lanes had existed on a part of I-80 in Morris County, but the HOV lanes were opened to regular traffic because they were not used frequently.
Route description
[edit]Warren and Sussex counties
[edit]I-80 enters Hardwick Township, Warren County, from Pennsylvania on the Delaware Water Gap Toll Bridge over the Delaware River, maintained by the Delaware River Joint Toll Bridge Commission.[4] In addition to carrying I-80, this bridge also carries the Appalachian Trail over the Delaware River. From this point, the four-lane freeway heads south along the east bank of the river through the Delaware Water Gap, immediately reaching a westbound exit and eastbound entrance for Old Mine Road.[4][6] Now maintained by the New Jersey Department of Transportation, the road makes a sharp turn to the east and comes to a u-turn ramp in both directions that also has access to the Appalachian Trail.[4] The highway heads south again and enters Knowlton Township, where it comes to another set of U-turn ramps that also includes a weigh station in the eastbound direction. After turning southeast and leaving the Delaware Water Gap, the road has a westbound right-in/right-out for Hainesburg Road before crossing under the abandoned Delaware River Viaduct of the Lackawanna Cut-Off. East of the viaduct, I-80 widens to six lanes and reaches a complex interchange with the western terminus of US 46, Route 94, and Decatur Street in Columbia, where development near the route increases. After this interchange, the freeway turns east away from the Delaware River and crosses over Paulins Kill before it continues through wooded and hilly areas containing some farms, with the eastbound direction widening from three to four lanes, and the highway median also widens. A scenic overlook of the Delaware Water Gap is located in the westbound direction while a rest area is located in the eastbound direction.[4][6]
Upon crossing into Blairstown, the eastbound direction narrows down to three lanes.[4] In Hope Township, I-80 reaches an interchange with CR 521 that also provides access to CR 519 and the Land of Make Believe amusement park.[4][6] The highway widens to eight lanes briefly after this interchange before narrowing to six lanes. In Frelinghuysen Township, the freeway carries four lanes eastbound and three lanes westbound. Upon coming into Allamuchy, I-80 has six lanes before gaining a fourth eastbound lane as it comes to the exit for CR 517,[4] providing access to Allamuchy Mountain State Park.[6] Following this, the road runs through densely forested areas of the park, coming to two pairs of rest areas with no facilities in both directions. The eastbound direction becomes three lanes again before the road passes through Byram Township in Sussex County.[4][6]
Morris and Essex counties
[edit]Upon crossing the Musconetcong River, I-80 enters Mount Olive in Morris County and passes through more woodland with a narrower median. The road comes to a trumpet interchange with US 206 and forms a concurrency with that route as it bypasses Netcong to the south. After turning southeast and passing near suburban business parks, the highway crosses over the NJ Transit's Morristown Line/Montclair-Boonton Line and reaches a partial interchange with US 46,[4][6] which has only a westbound exit and eastbound entrance. The freeway briefly crosses through Netcong and Mount Olive again before continuing into Roxbury, where it comes to a modified cloverleaf interchange.[4] At this interchange, Route 183 heads north into Netcong and US 206 splits from I-80 by heading south. The road continues through wooded areas containing some suburban development as it comes to the interchange with Landing Road (CR 631), which also provides access to eastbound US 46.[4][6] The road crosses the NJ Transit line again and parallels it a short distance to the north as it comes into Mount Arlington and reaches the exit for Howard Boulevard (CR 615), serving Mount Arlington Station.[4] I-80 continues back into Roxbury and comes to a westbound truck rest area with the eastbound one being abandoned.[4][7][8] After this, the road heads farther north of the railroad tracks and briefly passes through Jefferson and Rockaway townships before continuing into Wharton. Here, the freeway has an eastbound exit to North Main Street (CR 634) that provides access to Route 15 before it reaches the interchange with Route 15 proper that lacks an eastbound exit.[4]
The highway continues back into Rockaway Township as it widens to eight lanes and comes to the exit for Mt Hope Avenue (CR 661) near the Rockaway Townsquare shopping mall. Suburban development near the highway becomes more dense at this point as I-80 briefly passes through Rockaway before coming to the interchange with CR 513 in Rockaway Township.[4][6] The freeway passes over the Dover and Rockaway River Railroad's Dover and Rockaway Branch and turns southeast here into Denville. In the center of Denville, it has an eastbound exit and westbound entrance serving US 46 that also provides access to Route 53. There is a westbound exit and eastbound entrance serving both US 46 and Route 53 as the road begins to turn more to the east. I-80 turns south and crosses the Montclair-Boonton Line for a third time before it enters Parsippany.[4] The highway makes a turn east as it comes into an area of business parks, with the median widening before an interchange serving US 202 and Cherry Hill Road (CR 654).[4][6] The median narrows again before I-80 reaches the interchange with I-287 that also has movements to US 46, Smith Road, and Littleton Road to and from the east.[4]
Past I-287, I-80 gains the local–express lanes with a 2-3-3-2 configuration.[4] The road continues past more commercial areas, with the local lanes having an eastbound exit and westbound entrance at South Beverwyck Road (CR 637).[4][6] After this, there is a large interchange with US 46 and the western terminus of I-280, at which point the local–express lanes end.[4] From this point, I-80 continues east through wooded areas as a six-lane freeway, crossing into Montville,[4][6] where there is a partial interchange providing access to Hook Mountain Road.[4] After a turn to the northeast, the highway comes into Fairfield, Essex County, continuing through wooded surroundings as it heads north before turning east. Development near the road increases as it comes to the westbound exit and eastbound entrance with Two Bridges Road (CR 613).[4][6]
Passaic and Bergen counties
[edit]After crossing the Passaic River again, I-80 enters Wayne in Passaic County.[4] Here, the road passes under the Montclair-Boonton Line before coming to the spaghetti junction with Route 23 and US 46 near the Willowbrook Mall. At this point, the freeway widens to eight lanes and continues into Totowa, passing near more commercial areas and over the Norfolk Southern Railway railroad line as it comes to an interchange with Minnisink Road (CR 642) that has access to and from the west.[4][6] A short distance later, there is a westbound exit and eastbound entrance serving Union Boulevard (Route 62 / CR 646).[4] I-80 crosses the Passaic River a third time and enters Woodland Park, where it turns to the northeast past suburban neighborhoods and reaches an interchange serving Squirrelwood Road (CR 636).[4][6] Passing to the north of the Garret Mountain Reservation, the freeway enters Paterson and turns east into urban areas as it comes to the interchange with Route 19. After Route 19, I-80 runs above Paterson on a viaduct, crossing over the NJ Transit's Main Line before coming to the exit for Madison Avenue (CR 649). The road returns to ground level near urban neighborhoods as it comes to an eastbound exit and westbound entrance serving Market Street before reaching an interchange with Route 20.[4][6]
After a fourth crossing of the Passaic River, I-80 comes into Elmwood Park in Bergen County and reaches the exit for CR 507.[4] It continues near suburban neighborhoods, coming to a bridge over the New York, Susquehanna and Western Railway's New Jersey Subdivision line, and passes over the NJ Transit's Bergen County Line as it comes to an interchange with the Garden State Parkway on the border of Elmwood Park and Saddle Brook that also has connections to Midland Avenue (CR 67).[4][6] At the Garden State Parkway, I-80 gains a 2-2 local–express lane configuration eastbound while the westbound direction carries four lanes. The next interchange along the road is with Saddle River Road (CR 79) and is a westbound entrance and an eastbound exit accessible from the local lanes. The freeway passes over the New York, Susquehanna and Western Railway line again and turns south along the west bank of the Saddle River, eventually crossing it into Lodi.[4] Immediately after, there is a diamond interchange at Riverview Avenue that provides access to Route 4 and Route 17. Heading southeast, I-80 passes over the New York, Susquehanna and Western Railway Lodi Branch line and comes to an interchange at Route 17, which provides access to US 46 to the south, Route 4 to the north, and various local roads. At this point, I-80 runs between the travel lanes of Route 17 as it continues into Hackensack. Past Route 17, I-80 gains a 3-2-2-3 local–express lane configuration and crosses over the NJ Transit's Pascack Valley Line before passing through industrial parks and runs briefly through South Hackensack.[4][6] Here, there is an interchange to Green Street before the highway comes into Teterboro. Turning east, the freeway runs through South Hackensack before entering Hackensack, where an exit provides access to Hudson Street (CR 124).[4] The road passes near neighborhoods before crossing the Hackensack River into Ridgefield Park, where it passes over the New York, Susquehanna and Western Railway's New Jersey Subdivision line and CSX Transportation's River Subdivision line before there is an exit for 2nd Street.[4][6] The freeway briefly passes through Bogota before it continues into Teaneck.[4][6] In Teaneck, I-80 reaches its eastern terminus at the interchange with the New Jersey Turnpike (I-95). From here, one can head southbound on I-95 on the turnpike towards Newark or head northbound towards the George Washington Bridge and New York City.[6]
History
[edit]A freeway along the I-80 corridor was first planned in 1936 as a replacement for the cross-state US 46, running from the George Washington Bridge west to the Delaware Water Gap and Scranton, Pennsylvania.[9] After World War II, New Jersey officials considered the proposal again in 1955.[10] Coming off the George Washington Bridge, Route 4 and US 46 already provided high-speed corridors, but they were overloaded, and so a new corridor in between, the Bergen–Passaic Expressway, was planned to run from the bridge to Paterson.[11][12] The planned route west to the Delaware Water Gap was designated in 1956 as Federal Aid Interstate Route 101 by the New Jersey State Highway Department.[13] It first received the I-82 designation before finally becoming a part of I-80 in 1958.[2][14] The easternmost section of the route, leading to the bridge, had become part of I-95.[14]
The section of I-80 through the Delaware Water Gap had already opened on December 16, 1953, running from the Delaware Water Gap Toll Bridge to Route 94 at Columbia.[15] This road was signed as a realignment of US 611 from Pennsylvania, later receiving the I-80 designation. The old alignment of US 611 in Pennsylvania had become US 611 Alt..[16][17] By 1966, I-80 had been completed from Netcong to Denville and from Paterson to I-95.[17] By 1969, the section between I-280 in Parsippany and Route 23 in Wayne was finished. Also around this time, US 611 was moved off I-80 and back into Pennsylvania, replacing US 611 Alt.[18] By 1971, the section between Wayne and Paterson was completed along with the part between US 202 and I-280.[19] A 3.5-mile (5.6 km) section between US 46 in Denville and US 202 in Parsippany–Troy Hills, was opened in September 1973.[20] Also in 1973, the section between US 206 in Netcong and US 46 and Route 94 in Columbia was completed, and the interchange in Columbia was realigned into a complex array of ramps.[3]
In 1982, two rest areas along I-80 were closed due to chronic use for illegal activities. The rest area in Lodi, next to westbound exit 63, closed on June 30,[21] and the rest area at Roxbury in Morris County closed in October.[22][23] However, the latter reopened on August 14, 1991, for trucks only.[24]
In the 1990s, HOV lanes were built along I-80 between Rockaway and Parsippany. These HOV lanes, along with the ones that had been built on I-287, were opened to regular traffic in 1998 due to lack of usage, and the state did not have to repay the federal government the $240 million (equivalent to $419 million in 2023[25]) to build the lanes.[26]
In 1994, the New Jersey Department of Transportation adopted and began using the Rockfall Hazard Rating System for evaluating and ranking highway rock-cut slopes. The segment of I-80 between mileposts 1.0 and 1.4, has been continually characterized as having the highest rockfall hazard rating scores in the state.[27] Nine rockfall incidents and one fatality have been reported between 2001 and 2016. In June 2019, the New Jersey Department of Transportation held a public meeting regarding a proposed rock wall along I-80 in the Delaware Water Gap National Recreation Area. The $60-million project, dubbed the "Jurassic Park fence", would involve the construction of a 60-foot (18 m) metal fence between milemarker 1.0 and 1.0 to prevent rocks from falling onto the highway.[28]
On June 22, 2001, a tanker crashed on a westbound bridge on I-80 in Denville, causing a fiery explosion that damaged the bridge and forced its demolition.[29] A temporary bridge had to be built, and traffic on this part of I-80 as well as adjacent roads was snarled; in addition, a state of emergency had been declared for Morris County.[30] The new I-80 bridge opened in September 2001.[31]
I-80, like many other highways in New Jersey, once had solar powered emergency callboxes every one mile (1.6 km), however, with the advent of cellphones, the usage of these callboxes became extremely limited. To save on maintenance costs, the New Jersey Department of Transportation removed these callboxes in 2005.[32]
In August 2012, the New Jersey Department of Transportation announced a $73-million (equivalent to $95.8 million in 2023[25]) project will completely rehabilitate and improve I-80 eastbound between US 202 and the South Beverwyck Road interchange, a very busy part of highway with an average of 159,000 vehicles traveling it daily.[33]
Exit list
[edit]County | Location | mi[4] | km | Exit | Destinations | Notes | ||
---|---|---|---|---|---|---|---|---|
Delaware River | 0.0 | 0.0 | – | I-80 west to PA 611 – Stroudsburg, Del Water Gap | Continuation into Pennsylvania | |||
Delaware Water Gap Toll Bridge (westbound toll in Pennsylvania) | ||||||||
Warren | Hardwick Township | 0.1 | 0.16 | 1 | Millbrook, Flatbrookville | Access via Old Mine Road; last westbound exit before toll | ||
Knowlton Township | 2.0 | 3.2 | WEIGH STATION | |||||
3.3 | 5.3 | – | Hainesburg Rd | Westbound exit and entrance | ||||
4.2 | 6.8 | 4A | Columbia | Eastbound exit and westbound entrance; access via Decatur Street | ||||
4.58 | 7.37 | 4 | US 46 east / Route 94 to PA 611 – Portland PA, Buttzville, Blairstown | Signed as exits 4B (SOUTH/EAST) and 4C (NORTH); western terminus of US 46 | ||||
Hope Township | 12.0 | 19.3 | 12 | CR 521 to CR 519 – Blairstown, Hope | To Land of Make Believe | |||
Allamuchy Township | 19.8 | 31.9 | 19 | CR 517 – Hackettstown, Allamuchy, Andover | To Allamuchy Mountain State Park | |||
Sussex |
No major junctions | |||||||
Morris | Mount Olive Township | 25.2 | 40.6 | 25 | US 206 north – Stanhope, Newton | Western terminus of the concurrency with US 206 | ||
Netcong | 26.2 | 42.2 | 26 | US 46 west – Budd Lake, Hackettstown | Westbound exit and eastbound entrance | |||
Roxbury | 27.1 | 43.6 | 27 | US 206 south / Route 183 north – Somerville, Netcong | Signed as exits 27A (SOUTH) and 27B (NORTH); eastern terminus of the concurrency with US 206; southern terminus of Route 183 | |||
28.9 | 46.5 | 28 | US 46 east to Route 10 – Ledgewood, Lk Hopatcong | |||||
Mount Arlington | 30.6 | 49.2 | 30 | Howard Blvd – Mt Arlington | To Mount Arlington Station; access via CR 615 | |||
Wharton | 34.0 | 54.7 | 34 (EB) 34A-B (WB) | To Route 15 – Wharton, Dover, Sparta (EB) Route 15 – Wharton, Jefferson, Sparta (WB) | Signed as exits 34A (SOUTH) and 34B (NORTH) westbound | |||
Rockaway Township | 35.3 | 56.8 | 35 | Mount Hope, Dover (U-TURN) | Signed as exits 35A (Dover) and 35B (Mount Hope) westbound; access via CR 661; to Rockaway Townsquare | |||
37.6 | 60.5 | 37 | CR 513 – Hibernia, Rockaway | |||||
Denville Township | 38.8 | 62.4 | 38 | US 46 east to Route 53 – Denville | Eastbound exit and westbound entrance; to Denville Station | |||
39.5 | 63.6 | 39 | Westbound exit and eastbound entrance; to Denville station | |||||
Parsippany–Troy Hills | 42.4 | 68.2 | 42A | US 202 south – Morris Plains | ||||
42B | To US 46 – Parsippany | No eastbound exit; access via CR 654 | ||||||
42C | US 202 north – Parsippany | Eastbound exit and westbound entrance | ||||||
43.6 | 70.2 | 43 (EB) 43A-B (WB) | I-287 – Morristown, Mahwah (EB) I-287 to US 46 / Smith Rd / Littleton Rd – Morristown, Mahwah (WB) | Signed as exits 43A (SOUTH) and 43B (NORTH) westbound; no eastbound access to US 46 / Smith Road / Littleton Road; Exits 41A-B (I-287) | ||||
Western terminus of the local-express lanes | ||||||||
45.3 | 72.9 | 45 | Lake Hiawatha, Whippany | Eastbound exit and westbound entrance; access via CR 637 | ||||
46.3 | 74.5 | 47A | I-280 east – The Oranges, Newark | Eastbound exit and westbound entrance; western terminus of I-280 | ||||
Eastern terminus of the local-express lanes | ||||||||
46.5 | 74.8 | 47B (EB) 47 (WB) | US 46 east – The Caldwells, Montclair (EB) US 46 west – Parsippany (WB) | Same-directional access only; signed as exit 47 westbound | ||||
Montville | 47.8 | 76.9 | 48 | Montville, Pine Brook | Westbound exit and eastbound entrance; access via Hook Mountain Road | |||
Essex | Fairfield Township | 52.4 | 84.3 | 52 | Lincoln Park, Fairfield, The Caldwells | Westbound exit and eastbound entrance; access via CR 613 | ||
Passaic | Wayne | 53.6 | 86.3 | 53 | US 46 east to Route 3 – Wayne, Clifton, Lincoln Tunnel | Eastbound exit and westbound entrance; access to the Meadowlands Sports Complex | ||
US 46 / Route 23 – Wayne, Butler, Verona | Westbound exit and eastbound entrance | |||||||
Totowa | 54.7 | 88.0 | 54 | Minnisink Rd – Little Falls, Totowa | Eastbound exit and westbound entrance; access via CR 642 | |||
55.2 | 88.8 | 55 | Union Blvd – Little Falls, Totowa | Westbound exit and eastbound entrance; signed as exits 55A (Little Falls) and 55B (Totowa); access via Route 62 south / CR 646 | ||||
Woodland Park | 57.0 | 91.7 | 56 | Squirrelwood Rd – Woodland Park, Paterson | Signed as exits 56A (Woodland Park) and 56B (Paterson) eastbound; access via CR 636 | |||
Paterson | 58.2 | 93.7 | 57 | Route 19 – Clifton, Downtown Paterson | Signed as exits 57A (south) and 57B (north); Route 19 north not signed | |||
58.3 | 93.8 | 57C | Main St – Paterson | Westbound exit and eastbound entrance; access via CR 509 | ||||
59.0 | 95.0 | 58 | Madison Ave – Paterson, Clifton | Signed as exits 58A (Clifton) and 58B (Paterson); access via CR 649 | ||||
60.0 | 96.6 | 59 | Market Street – Paterson | Westbound exit and eastbound entrance | ||||
60.4 | 97.2 | 60 | Route 20 to US 46 / Route 21 south – Hawthorne, Clifton (EB) Route 20 north – Hawthorne (WB) | No westbound access to Route 20 south | ||||
Bergen | Elmwood Park | 60.8 | 97.8 | 61 | CR 507 – Garfield, Elmwood Park | |||
Saddle Brook | 62.3 | 100.3 | 62A | G.S. Parkway / Midland Avenue (CR 67) – Saddle Brook | Signed as exit 62 westbound; no eastbound access to GSP south; access to Midland Avenue via Pehle Avenue; exit 159 on G.S. Parkway | |||
Western terminus of the eastbound local-express lanes | ||||||||
62B | Saddle River Rd – Fair Lawn, Lodi | Eastbound exit and westbound entrance; access via CR 79 | ||||||
Lodi | 63.8 | 102.7 | 63 | To Route 17 north – Rochelle Pk, Paramus (EB) Route 4 / Route 17 – Lodi, Fair Lawn (WB) | Access via Riverview Avenue and Essex Street; to Maywood | |||
65.0– 65.4 | 104.6– 105.3 | Western terminus of the westbound local-express lanes | ||||||
Hackensack | 64 (EB) 64A-B (WB) | Route 17 south to US 46 east – Hasbrouck Hts, Newark (EB) Route 17 to Route 4 – Rochelle Pk, Paramus, Hasbrouck Hts, Newark (WB) | Signed as exits 64A (NORTH) and 64B (SOUTH) westbound; no eastbound access to Route 17 north; Route 4 not signed eastbound | |||||
Teterboro–South Hackensack line | 65.6 | 105.6 | 65 | Green St – Teterboro, S. Hackensack | ||||
Hackensack | 66.5 | 107.0 | 66 | Hudson St – Hackensack, Little Ferry | Access via CR 124 | |||
Ridgefield Park | 67.2 | 108.1 | 67 | Bogota, Ridgefield Pk | Eastbound exit and westbound entrance; access via 2nd Street | |||
Teaneck | 68.1 | 109.6 | 68A | I-95 south / N.J. Turnpike south to US 46 – Meadowlands Sports Complex | Eastbound exit and westbound entrance; exit number not signed | |||
68.5 | 110.2 | 70 | Leonia, Teaneck | Eastbound exit and westbound entrance; signed as exits 70A (Leonia) and 70B (Teaneck); access via CR 56 | ||||
68B | I-95 north – G Washington Br, New York City | Eastern terminus; exit number not signed; exit 69 (I-95) | ||||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Auxiliary routes
[edit]- I-280, known locally as the Essex Freeway
See also
[edit]References
[edit]- ^ "Table 1: Main Routes of the Dwight D. Eisenhower National System Of Interstate and Defense Highways". FHWA Route Log and Finder List. Federal Highway Administration. December 31, 2021. Retrieved June 27, 2022.
- ^ a b Public Roads Administration; American Association of State Highway Officials (1957). Official Numbering for the National System of Interstate and Defense Highways, as Adopted by the American Association of State Highway Officials, August 14, 1957 (Map). Scale not given. Washington, DC: Federal Works Agency. Retrieved January 13, 2010 – via Wikimedia Commons.
- ^ a b "Missing Link of I-80 Opened in Ceremony Near Columbia". The New York Times. November 9, 1973. p. 86. ISSN 0362-4331.
- ^ a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj ak al New Jersey Department of Transportation (April 2014). "I-80 Straight Line Diagram" (PDF). Roadway Information and Traffic Monitoring System Program. New Jersey Department of Transportation. Retrieved March 17, 2020.
- ^ "Bergen Passaic Expressway Opens Local Traffic Lanes (Published 1964)". December 12, 1964. Retrieved August 11, 2023.
- ^ a b c d e f g h i j k l m n o p q r s t "Overview of Interstate 80 in New Jersey" (Map). Google Maps. Retrieved January 14, 2010.
- ^ "Traffic and Parking in Rest Areas: Interstate 80". NJDOT Traffic Regulations. New Jersey Department of Transportation. Retrieved January 15, 2010.
- ^ "I-80 Eastbound at Abandoned Weigh Station". Google Street View. Google Maps. September 2008. Retrieved January 15, 2010.
- ^ "Freeways Are Now Urged". The New York Times. December 13, 1936. p. 16. ISSN 0362-4331.
- ^ "Interstate 80 Toll Project Timeline". Pocono Record.
- ^ "Freeway Route in Jersey Given; Fewer Protests Than Were Expected Are Voiced Over Bergen-Passaic Artery". timesmachine.nytimes.com. July 1, 1956. Retrieved August 23, 2019.
- ^ Joint Study of Arterial Facilities. Port of New York Authority and Triborough Bridge and Tunnel Authority. 1955.
- ^ Wright, George Cable (March 5, 1958). "Jersey Acts to Speed U.S. Aid for Its $388.5 Million Freeway". The New York Times. p. 33. ISSN 0362-4331.
- ^ a b Wright, George Cable (September 19, 1958). "New Roads with New Numbers Will Parallel Old U.S. Routes". The New York Times. p. 29. ISSN 0362-4331.
- ^ "New Span Crosses Delaware River; Fine, Driscoll at Ceremonies for Water Gap Bridge—Road to Link Poconos and New York". The New York Times. December 17, 1953. p. 51. ISSN 0362-4331.
- ^ Official Road Map of Pennsylvania (back) (PDF) (Map). Pennsylvania Department of Highways. 1950. Archived from the original (PDF) on March 11, 2016. Retrieved January 16, 2014.
- ^ a b Esso; General Drafting (1966). United States featuring the Interstate Highway System (Map).[full citation needed]
- ^ Chevron Oil Company; H.M. Gousha (1969). Map of New Jersey (Map).[full citation needed]
- ^ Shipler, David K. (August 19, 1971). "New Highways Shaping Future of City's Suburbs; New Superhighways Shaping Future of City's Suburbs". The New York Times. p. 1. ISSN 0362-4331.
- ^ Burks, Edward C. (September 15, 1973). "Vital Stretch of Route 80 Opens in Jersey, Ending Big Bottleneck; Stretch of Route 80 Opens and Eliminates Bottleneck". The New York Times. p. 65. ISSN 0362-4331.
- ^ "Controversial Rest Site on Interstate is Closed". The Asbury Park Press. July 8, 1982. p. 48. Retrieved October 13, 2017 – via Newspapers.com.
- ^ Mitkwoski, Michelle (October 30, 1982). "Route 80 'Gay' Spots Shut for Time Being". The Daily Record. p. 22. Retrieved October 13, 2017 – via Newspapers.com.
- ^ McKeel, Stuart (June 10, 1990). "Roxbury Twp. Fights Proposal for Rest Areas". The Daily Record. p. 3. Retrieved October 13, 2017 – via Newspapers.com.
- ^ McKeel, Stuart (August 14, 1991). "Rt. 80 Rest Area Reopens—for Trucks". The Daily Record. Retrieved October 13, 2017 – via Newspapers.com.
- ^ a b Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
- ^ Berger, Joseph (December 1, 1998). "Our Towns; H.O.V. Lanes: A 30-Mile Test That Failed". The New York Times. Retrieved December 22, 2009.
- ^ "I-80 Rockfall Mitigation Project - Rockfall Hazards Overview".
- ^ Cassi, Sarah (June 14, 2019). "Controversial I-80 project in Delaware Water Gap, dubbed the 'Jurassic Park fence,' goes before the public". lehighvalleylive.com. Retrieved August 22, 2019.
- ^ Murphy, Dean E. (June 24, 2001). "Drivers May Face Months of Delays After Fiery Crash Forces Demolition of I-80 Span". The New York Times. Retrieved January 15, 2010.
- ^ "New Jersey: Trenton: Route 80 Emergency Declared". Metro Briefing. The New York Times. July 4, 2001. Retrieved January 15, 2010.
- ^ New Jersey Department of Transportation (September 5, 2001). "NJDOT Will Begin Work to Re-Open I-80 in Morris County" (Press release). New Jersey Department of Transportation. Retrieved January 15, 2010.
- ^ Barlas, Thomas (February 28, 2007). "Last Call for N.J.'s Roadside Call Boxes". The Press of Atlantic City.
- ^ "NJDOT announces major Interstate 80 roadway rehabilitation in Parsippany-Troy Hills Interchanges with I-287 and Route 202 to be upgraded as well". state nj.
External links
[edit]
- Interstate Highways in New Jersey
- Interstate 80
- Transportation in Bergen County, New Jersey
- Transportation in Passaic County, New Jersey
- Transportation in Essex County, New Jersey
- Transportation in Morris County, New Jersey
- Transportation in Sussex County, New Jersey
- Transportation in Warren County, New Jersey