Jump to content

Redwood Solar Cluster

Coordinates: 35°19′22″N 118°48′45″W / 35.3229°N 118.8124°W / 35.3229; -118.8124
From Wikipedia, the free encyclopedia

The Redwood Solar Cluster is a 100 MW photovoltaic power station that is located in Kern County, California. The final phase, named Redwood 4, was completed in March 2018, and is located 12 miles east of downtown Bakersfield. Redwood 4 is rated at 26 MW.[1][2]

References

[edit]
  1. ^ "Redwood 4 blooms in California". RE News. March 7, 2018. Retrieved July 2, 2022.
  2. ^ "Redwood 4 Solar PV Park, US". Power Technology. February 2, 2022. Retrieved July 2, 2022.

35°19′22″N 118°48′45″W / 35.3229°N 118.8124°W / 35.3229; -118.8124