Puhang Road station
Appearance
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Sanlu Highway at Puhang Road[1] Minhang District, Shanghai China | ||||||||||
Coordinates | 31°02′35″N 121°31′35″E / 31.043175°N 121.526285°E | ||||||||||
Operated by | Shanghai Keolis Public Transport Operation Management Co. Ltd.[2] | ||||||||||
Line(s) | Pujiang line | ||||||||||
Platforms | 2 (2 side platforms) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | March 31, 2018 | ||||||||||
Services | |||||||||||
|
Puhang Road (Chinese: 浦航路; pinyin: Pǔháng Lù) is a station on the Pujiang line of the Shanghai Metro. The station is located just north of the intersection of Sanlu Highway and Puhang Road,[1] between Minrui Road and Dongchengyi Road. It began passenger trial operations with the rest of the Pujiang line on March 31, 2018.[3][4]
References
[edit]- ^ Jump up to: a b 轨交8号线三期取名“浦江线” 将与沈杜公路站接驳_大申网_腾讯网. sh.qq.com (in Chinese (China)).
- ^ "Shanghai metro line 8 phase 3 | Shanghai Keolis". shkeolis.com.
- ^ 注意!轨交浦江线预计明年一季度开通试运营! [Pujiang line to begin trial operations in first quarter of 2018]. news.163.com (in Chinese (China)).
- ^ 全自动无人驾驶!浦江线3月31日通车 全天运营约17小时. CNR.cn (in Chinese (China)).