Jump to content

Project Huriwaka

Coordinates: 39°31′52.02″S 175°48′25.7″E / 39.5311167°S 175.807139°E / -39.5311167; 175.807139
From Wikipedia, the free encyclopedia

Project Huriwaka
Map
Country
  • New Zealand
LocationTaihape
Coordinates39°31′52.02″S 175°48′25.7″E / 39.5311167°S 175.807139°E / -39.5311167; 175.807139
Statusproposed
OwnerManawa Energy
Power generation
Nameplate capacity300 MW

Project Huriwaka is a proposed wind farm located on the Hihitahi Plateau between Waiouru and Taihape, New Zealand. The project was originally developed and consented by Meridian Energy, but the consents were allowed to lapse. In May 2023 the rights to develop the project were acquired by Manawa Energy.

[edit]

Meridian Energy applied for resource consents for a 52 turbine farm generating 130 MW in 2008. The consent hearing was held in December and Horizons Regional Council granted the resource consents in February 2009. The decision was appealed to the Environment Court in September 2009 and in January 2010 the court ruled the wind farm project could proceed.[1] The approved consent conditions limited the number of turbines to 52 and maximum blade height to 135 m.[2] In May 2015 the resource consents were extend for five years, until 2020.[3][4]

Consent for the wind farm lapsed in May and June 2020. In 2021 Meridian planned to apply for a new consent for the site.[5]

In May 2023 Manawa Energy announced that it had secured the rights to develop the project.[6][7] Renamed Project Huriwaka, it will generate 230MW. Development of the project and gaining resource consents is expected to take three years.[8]

In October 2024 the project was included in the National government's fast-track list.[9] The project was increased to 300MW, with construction expected to begin in 2026.[10]

See also

[edit]

References

[edit]
  1. ^ "Wind farm gets go-ahead". 27 January 2010.
  2. ^ Kelly Burns (14 February 2009). "Windfarm breezes through hearing". Dominion Post.
  3. ^ Caroline Brown (28 May 2015). "Meridian Energy's Project Central Wind consent gets five-year extension". Stuff. Retrieved 27 June 2021.
  4. ^ Zaryd Wilson (25 May 2015). "Wind farm bid gets second chance". Whanganui Chronicle. Retrieved 27 June 2021.
  5. ^ "Central Wind project". Meridian Energy. Retrieved 15 February 2021.
  6. ^ Janine Rankin (3 May 2023). "Central North Island's wind power to be captured by Manawa Energy". Stuff. Retrieved 5 May 2023.
  7. ^ "Project Huriwaka Wind". Manawa Energy. Retrieved 2 May 2023.
  8. ^ "Manawa gains rights to develop 230MW Central NI wind farm". New Zealand Herald. 2 May 2023. Retrieved 2 May 2023.
  9. ^ Moana Ellis (7 October 2024). "Fast track status for big wind farm in central North Island". New Zealand Herald. Retrieved 8 October 2024.
  10. ^ Moana Ellis (26 November 2024). "Rangitīkei wind farm: 130 new jobs — $75m local spend". 1News. Retrieved 27 November 2024.