Parbatipur–Panchagarh line
Appearance
Parbatipur- Panchagarh line | |
---|---|
Overview | |
Status | Operational |
Owner | Bangladesh Railway |
Locale | Bangladesh |
Termini | |
Stations | 20 |
History | |
Opened | Parbatipur-Ruhia
1913 |
Technical | |
Line length | 150 kilometres (93 mi) |
Track gauge | Dual gauge |
Parbatipur- Panchagarh Line is a 150 km long railway line in Rangpur division. It was opened by Pakistan Eastern Railway in 1967. The line has 20 station and 5 station in planning.[1][2][3][4][5]
History
[edit]In 1913, Bengal Dooars Railway built Parbatipur-Ruhia meter-gauge Line, then After partition Pakistan Eastern Railway built Ruhiya- Panchagarh meter-gauge line in 1967. In 2018 Ministry of Railways convert the route into dual gauge line. [6][7][8]
References
[edit]- ^ "পার্বতীপুর-দিনাজপুর-পঞ্চগড় ব্রডগেজ লাইন উদ্বোধনের অপেক্ষায় আধুনিক রেল যোগাযোগ সুবিধা পাবে ২ জেলার মানুষ | -। সফল বাংলাদেশ ।-". 2020-01-26. Archived from the original on 26 January 2020. Retrieved 2024-12-06.
- ^ "দেশের দীর্ঘতম রেলপথে ট্রেন চলাচল শুরু". দেশের দীর্ঘতম রেলপথে ট্রেন চলাচল শুরু. Retrieved 2024-12-06.
- ^ রিপোর্টার, স্টাফ. "অচিরেই বাংলাবান্ধা পর্যন্ত রেললাইন সম্প্রসারণের কাজ তেঁতুলিয়ায় রেলমন্ত্রী". DailyInqilabOnline. Retrieved 2024-12-06.
- ^ "পঞ্চগড়-বাংলাবান্ধা রেললাইন সম্প্রসারণ কাজ শুরু শিগগিরই". মানবজমিন. Retrieved 2024-12-06.
- ^ "Parbatipur-Panchagarh- Banglabandha Line". February 5, 2022.
- ^ "সাড়ে ১৩ ঘণ্টা পর পার্বতীপুর-পঞ্চগড় রুটে ট্রেন চালু". banglanews24.com (in Bengali). 2022-01-05. Retrieved 2024-12-06.
- ^ Sangbad, Protidiner. "দীর্ঘতম রেলপথে ট্রেন চলাচল শুরু". Protidiner Sangbad (in Bengali). Retrieved 2024-12-06.
- ^ "১৩ ঘণ্টা পর পার্বতীপুর-পঞ্চগড় ট্রেন চলাচল শুরু". Bangla Tribune (in Bengali). Retrieved 2024-12-06.