Old High Court metro station
Appearance
Old High Court | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ahmedabad Metro station | ||||||||||||||||
General information | ||||||||||||||||
Location | Shreyas Colony, Navrangpura, Ahmedabad, Gujarat 380009 | |||||||||||||||
Coordinates | 23°02′14″N 72°34′01″E / 23.03733°N 72.56704°E | |||||||||||||||
Owned by | Gujarat Metro Rail Corporation Limited | |||||||||||||||
Operated by | Ahmedabad Metro | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms |
| |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated, Double track | |||||||||||||||
Platform levels | 2 | |||||||||||||||
Accessible | Yes | |||||||||||||||
Other information | ||||||||||||||||
Status | Operational | |||||||||||||||
History | ||||||||||||||||
Opened | 30 September 2022 | |||||||||||||||
Electrified | 750 V DC third rail | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Old High Court is an important elevated interchange metro station on the East-West Corridor of the Blue Line and on the North-South Corridor of the Red Line of Ahmedabad Metro in Ahmedabad, India. Around this metro station holds the main Family Court of Ahmedabad along with Sardar Patel Swimming Complex and The Times of India Main Office. It was opened to the public on 30 September 2022 and is the first interchange metro station in the whole of Ahmedabad Metro network.[1][2][3][4]
Station layout
[edit]L2 Platforms |
Platform 4 Southbound |
Towards → APMC Next Station: Gandhigram |
Island platform | Doors will open on the right | ||
Platform 3 Northbound |
Towards ← Motera Stadium
Next Station: Usmanpura | |
L1 Platforms |
Side platform | Doors will open on the left | |
Platform 1 Eastbound |
Towards → Vastral Gam Next Station: Shahpur | |
Platform 2 Westbound |
Towards ← Thaltej Next Station: SP Stadium | |
Side platform | Doors will open on the left | ||
M | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
G | Street level | Exit/Entrance |
Entry/Exit
[edit]This section is empty. You can help by adding to it. (August 2023) |
See also
[edit]References
[edit]- ^ "PM Modi inaugurates Ahmedabad Metro first phase, takes a ride". Economic Times India Times. Retrieved 3 January 2022.
- ^ www.ETRealty.com. "Prime minister inaugurates phase-1 of Ahmedabad Metro rail project - ET RealEstate". ETRealty.com. Retrieved 4 October 2022.
- ^ "Huge demand on Day 1 of Ahmedabad Metro". The Indian Express. 2 October 2022. Retrieved 4 October 2022.
- ^ "Prime Minister Modi inaugurates phase-1 of Ahmedabad Metro rail project". The Economic Times. Retrieved 4 October 2022.