Jump to content

Nuea Khlong district

Coordinates: 8°4′29″N 99°0′13″E / 8.07472°N 99.00361°E / 8.07472; 99.00361
From Wikipedia, the free encyclopedia
Nuea Khlong
เหนือคลอง
District location in Krabi province
District location in Krabi province
Coordinates: 8°4′29″N 99°0′13″E / 8.07472°N 99.00361°E / 8.07472; 99.00361
CountryThailand
ProvinceKrabi
SeatNuea Khlong
Area
 • Total
414.8 km2 (160.2 sq mi)
Population
 (2548)
 • Total
54,789
 • Density132.1/km2 (342/sq mi)
Time zoneUTC+7 (ICT)
Postal code81130
Geocode8108

Nuea Khlong (Thai: เหนือคลอง, pronounced [nɯ̌a̯ kʰlɔ̄ːŋ]) is a district (amphoe) in Krabi province, Thailand.

History

[edit]

The minor district (king amphoe) was created on 1 April 1992 by splitting off eight tambons from Mueang Krabi district.[1] It was upgraded to a full district on 5 December 1996.[2]

Geography

[edit]

Neighboring districts are (from the northwest clockwise): Mueang Krabi, Khao Phanom, Khlong Thom, and Ko Lanta. To the west is the Andaman Sea.

Administration

[edit]

The district is divided into eight sub-districts (tambons), which are further subdivided into 56 villages (mubans). Nuea Khlong is a township (thesaban tambon) which covers parts of tambon Nuea Khlong. Each tambon has a tambon administrative organization (TAO).

No. Name Thai name Villages Pop.     
1. Nuea Khlong เหนือคลอง 7 12,217
2. Ko Siboya เกาะศรีบอยา 7 4,643
3. Khlong Khanan คลองขนาน 9 7,999
4. Khlong Khamao คลองเขม้า 4 4,968
5. Khok Yang โคกยาง 7 5,835
6. Taling Chan ตลิ่งชัน 5 5,425
7. Pakasai ปกาสัย 9 7,192
8. Huai Yung ห้วยยูง 8 6,510
 Map of Tambon

Economy

[edit]

Tambon Pakasai has long been the site of an electrical power generating plant run by the Electricity Generating Authority of Thailand (EGAT). In 1964, three 20 MW coal-fired plants came on-line adjacent to a coal mine that supplied fuel for the boilers. The plants were replaced in 1995 by a 340 MW generating plant burning natural gas and petroleum. EGAT plans to build on the same site an 800 MW coal-fired plant[3] to come on-line in 2019, burning 2.3 million tonnes of coal yearly, imported from Indonesia, Australia, and South Africa. The development is estimated to cost 60 billion baht (US$2 billion). EGAT's plans have encountered significant resistance from local residents due to their health concerns and fears of detrimental environmental impact.[4] EGAT counters by claiming that the plant will be a "clean coal" facility. Critics maintain that clean coal has never been successfully demonstrated at scale.[5]

References

[edit]
  1. ^ ประกาศกระทรวงมหาดไทย เรื่อง แบ่งเขตท้องที่อำเภอเมืองกระบี่ จังหวัดกระบี่ ตั้งเป็นกิ่งอำเภอเหนือคลอง (PDF). Royal Gazette (in Thai). 109 (53 ง special): 1. April 22, 1992. Archived from the original (PDF) on March 9, 2012.
  2. ^ พระราชกฤษฎีกาตั้งอำเภอเหนือคลอง อำเภอนายายอาม อำเภอท่าตะเกียบ อำเภอขุนตาล อำเภอแม่ฟ้าหลวง อำเภอแม่ลาว อำเภอรัษฎา อำเภอพุทธมณฑล อำเภอวังน้ำเขียว อำเภอเจาะไอร้อง อำเภอชำนิ อำเภอโนนดินแดง อำเภอปางมะผ้า อำเภอสนธิ อำเภอหนองม่วง อำเภอเบญจลักษ์ อำเภอโพนนาแก้ว อำเภอบุ่งคล้า อำเภอดอนมดแดง และอำเภอลืออำนาจ พ.ศ. ๒๕๓๙ (PDF). Royal Gazette (in Thai). 113 (62 ก): 5–8. November 20, 1996. Archived from the original (PDF) on May 21, 2009.
  3. ^ Praiwan, Yuthana (4 October 2016). "Call on Krabi coal plant due in November". Bangkok Post. Retrieved 4 October 2016.
  4. ^ Paradise at Risk: The Krabi Coal-fired Power Plant Project (PDF). Bangkok: Greenpeace Southeast Asia. 2014. Archived from the original (PDF) on 4 March 2016. Retrieved 14 January 2016.
  5. ^ Meigs, James B (2011-07-14). "The Myth of Clean Coal: Analysis". Popular Mechanics. Retrieved 18 October 2016.