Nalban metro station

From Wikipedia, the free encyclopedia
(Redirected from Nicco Park metro station)

Nalban
নলবন
Kolkata Metro station
General information
LocationHM Block, Sector IV, Bidhannagar, Kolkata, West Bengal 700106 (Beside of Nicco Park)
Coordinates22°34′24″N 88°25′16″E / 22.5732216°N 88.4211529°E / 22.5732216; 88.4211529
Owned byMetro Railway, Kolkata
Line(s)Orange Line
Platforms2 side platforms
Tracks2
Construction
Structure typeElevated
History
Opened2025 (expected)[1]
Electrified750 V DC third rail
Previous namesNicco Park
Services
Preceding station The logo of the Kolkata Metro. Kolkata Metro Following station
Gour Kishore Ghosh
towards Kavi Subhash
Orange Line IT Centre
towards Jai Hind
Location
Map

Nalban (Also known as Nicco Park)[2] is a station of Line 6 of the Kolkata Metro.[3][4][5] It is situated at just beside of Nicco Park. It will serve the area of Nalban, Salt Lake Sector IV and surrounding areas in Bidhannagar, Kolkata.[6][7] The station is named after its adjacent locality, Nalban.[8][9]

Location

[edit]

This station is located beside Nicco Park on the Salt Lake Bypass branch of Biswa Bangla Sarani at Nalban.[10][11] The main elevated structure of the station in the middle of Biswa Bangla Sarani with footover bridges on either side othe road.[12][13] It is geographically located at 22°33′40″N 88°24′53″E / 22.5610117°N 88.4147441°E / 22.5610117; 88.4147441.[14][15] The previous station of the station is Gour Kishore Ghosh metro station at a distance of 1.5 km (0.93 mi) and the next station is IT Centre metro station at a distance of 1.5 km (0.93 mi).[16][17]

History

[edit]

This project was sanctioned in the budget of 2010–11 by Mamata Banerjee with a project deadline of six years.[18][19] The execution of this project has been entrusted to RVNL at a cost of Rs 3951.98 crore.[20][21] It will help to reduce travel time between the southern fringes of Kolkata to Netaji Subhas Chandra Bose International Airport.[22][23] In October 2011, RVNL awarded Gammon India Limited, the tender for the construction of the metro corridor from VIP Bazar Metro Station to Nicco Park (Nalban metro station),[24][25] including stations, as part of Package-II of Line 6.[26][27][18] In early 2020s, the construction of the metro station along with the metro line started.[28][29] The station is still under construction after structural work completion.[30][31][32][33] It is slated to be completed in March 2025.[34][32][35] Alongside, there were several delays in filling viaduct gaps between Beleghata and Gour Kishore Ghosh.[36][37] These delays were caused due to road blocks as these gaps span over busy Eastern Metropolitan Bypass and Chingrighata crossing.[38][39][40] Currently, a 400 m (1,300 ft) viaduct gap between Captain Bhery Lake and Chingrighata crossing is still left to be filled, with current completion target set for March 2025.[41][42][43] The station is expected to be operational by mid-2025.[44][45]

Station

[edit]

Structure

[edit]

Nalban Metro Station is an elevated metro station and has a total of 3 levels.[46][47] Station entrances and exits begin or end at the first level or ground level.[48][49] Second-level or L1 or intermediate level houses station fare control, station agents, metro vending machines, crossovers, etc.[50] The third level or L2 or the final level houses the platforms and rail tracks. The station is 200 meters long and 25 meters wide.[16][32][51][17]

The station has four entrances and exits. The station is being built with state-of-the-art technology. In addition to staircases, it will be equipped with lifts and escalators. The station also has drinking water and toilet facilities.[16][32][51][52]

layout

[edit]
Nalban track layout
P2
P1
Station with two tracks and two side platforms
Layout
G Street Level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform doors will open on the left Disabled access
Southbound Towards →Kavi Subhash→ next station is Gour Kishore Ghosh
Northbound Towards ←Jai Hindnext station is IT Centre
Side platform doors will open on the left Disabled access
L2

Power and signal systems

[edit]

Like other stations and lines of Kolkata Metro, this station has 750 volt DC powered third rail. The electricity system will be used to operate the train.[53]

Train movement at this station will be managed by communication based train control signaling system. With this signal system, trains can be operated at intervals of 90 seconds.[54]

Services

[edit]

Services have not started from this station. Currently the station is under construction and is set to be opened in 2025.[44][34]

Connections

[edit]

See also

[edit]

References

[edit]
  1. ^ "Metro eyes full orange line operations by march 2025". Times of India. 26 July 2024.
  2. ^ "New System Map of Kolkata Metro". mtp.indianrailways.gov.in. Retrieved 24 September 2024.
  3. ^ "'7-day traffic block trial run for Metro construction work to end on June 15'". millenniumpost.in. 14 June 2024.
  4. ^ MPost (14 June 2024). "'7-day traffic block trial run for Metro construction work to end on June 15'". MillenniumPost. Retrieved 24 December 2024.
  5. ^ Desk, Editor (20 August 2023). "SEGMENT LAUNCHING WORK NEAR THE PROPOSED NALBAN METRO STATION STARTED". IBG News. Retrieved 24 December 2024. {{cite web}}: |last= has generic name (help)
  6. ^ "চিংড়িঘাটার মেট্রো স্টেশনের কাজ অনেকটা শেষ! রইল অন্দরমহলের ঝাঁ-চকচকে ফার্স্ট লুক". Hindustantimes Bangla (in Bengali). 28 October 2023. Retrieved 13 November 2024.
  7. ^ "Sec V lane on Salt Lake Bypass in Kolkata to be shut from Sunday in 7-day trial run". The Times of India. ISSN 0971-8257. Retrieved 24 December 2024.
  8. ^ "Construction of Gour Kishor Ghosh station going on in full swing". The Statesman. 8 July 2024.
  9. ^ "Metro Railway Kolkata / Indian Railways Portal". mtp.indianrailways.gov.in. Retrieved 24 September 2024.
  10. ^ "Beleghata-Ruby Section of Kolkata Metro Undergoes Inspection, Here's Why". News18. 30 March 2024. Retrieved 8 May 2024.
  11. ^ "Metro Railway Kolkata / Indian Railways Portal". mtp.indianrailways.gov.in. Retrieved 8 May 2024.
  12. ^ "Kolkata Metro: বাইপাসের উপর 'প্রায় তৈরি' নয়া মেট্রো স্টেশন, কবে জুড়বে গড়িয়া-এয়ারপোর্ট রুট?". Aaj Tak বাংলা (in Bengali). Retrieved 8 May 2024.
  13. ^ "Kolkata: Bypass Metro Pier at Chingrighata Metro Completes, Traffic to Resume Soon". Times Now. 4 June 2024. Retrieved 13 November 2024.
  14. ^ "Rail Vikas Nigam Limited plans 4 km extension from Ruby Metro to Beliaghata by puja". The Times of India. 20 February 2023. ISSN 0971-8257. Retrieved 8 May 2024.
  15. ^ "Budget boost: Metro eyes full Orange Line ops by March '25". The Times of India. ISSN 0971-8257. Retrieved 13 November 2024.
  16. ^ a b c MP, Team (30 September 2023). "Concreting work of Ritwik Ghatak Metro Station nears completion". www.millenniumpost.in. Retrieved 29 March 2024.
  17. ^ a b railanalysis3 (13 October 2023). "Kolkata Metro Update: The construction work of Ritwik Ghatak metro station of Kavi Subhash-Biman Bandar corridor going on in full swing". Rail Analysis India. Retrieved 29 March 2024.{{cite web}}: CS1 maint: numeric names: authors list (link)
  18. ^ "Kolkata: Bypass-New Town flyover plan with PWD for scrutiny". The Times of India. ISSN 0971-8257. Retrieved 24 December 2024.
  19. ^ ""Seven projects meant to change the face of Calcutta are entangled in a web of land politics and pandering. Metro explores the tunnel vision"". Telegraph india.
  20. ^ "Kolkata Metro update: Orange Line's Chingrighata-Sector 5 section inspected by General Manager – Details inside". Financialexpress. 7 December 2024. Retrieved 24 December 2024.
  21. ^ SNS (29 October 2023). "Metro Railway completes structural work of Gour Ghosh Metro station near Chingrighata". The Statesman. Retrieved 13 November 2024.
  22. ^ "Kolkata: Salt Lake Bypass flyover plan ready, awaits nod". The Times of India. ISSN 0971-8257. Retrieved 24 December 2024.
  23. ^ "বরুণ সেনগুপ্ত মেট্রো স্টেশনের নির্মাণ কাজ তুঙ্গে, অন্দরমহলটা দেখে নিন". Eisamay (in Bengali). Retrieved 8 May 2024.
  24. ^ "MSN". www.msn.com. Retrieved 24 December 2024.
  25. ^ "Details of tenders/contracts" (PDF). Archived from the original (PDF) on 19 March 2020. Retrieved 30 March 2024.
  26. ^ ""Road Ahead….. Projects sanctioned"". mtp.indianrailways.gov.in. Retrieved 28 March 2024.
  27. ^ ""Construction of VIP Bazar station begins after two years"".
  28. ^ "RVNL gets Nicco Park metro site for 90 days". The Times of India. ISSN 0971-8257. Retrieved 24 December 2024.
  29. ^ "Airport-New Garia Metro: Site visit next week to bridge VIP Bazar gap". The Times of India. 12 March 2023. ISSN 0971-8257. Retrieved 28 March 2024.
  30. ^ "Man electrocuted at construction site". The Times of India. 19 February 2024. ISSN 0971-8257. Retrieved 28 March 2024.
  31. ^ a b c d "শেষের মুখে কলকাতা মেট্রোর আরও ১ স্টেশনের কাজ! ভিতরটা কেমন হল? রইল 'ফার্স্ট লুক'". Hindustantimes Bangla (in Bengali). 28 September 2023. Retrieved 29 March 2023.
  32. ^ "মেট্রোর পথ করতে নোনাডাঙায় সরছে পুরোনো ভিআইপি বাজার". Eisamay (in Bengali). Retrieved 28 March 2024.
  33. ^ a b "CRS check till Metropolitan: No Ruby ops on Thurs, Fri". The Times of India. 27 March 2024. ISSN 0971-8257. Retrieved 29 March 2024.
  34. ^ "Kolkata: Pipe bridge lifted out of Metro alignment". The Times of India. 15 July 2020. ISSN 0971-8257. Retrieved 29 March 2024.
  35. ^ MP, Team (30 October 2023). "Structural work at Gour Kishor Ghosh Metro Station completed". MillenniumPost. Retrieved 13 November 2024.
  36. ^ "Bypass metro pier 319 ready, RVNL set to hand over Chingrighata site". The Times of India. ISSN 0971-8257. Retrieved 13 November 2024.
  37. ^ SNS (8 July 2024). "Construction of Gour Kishor Ghosh station going on in full swing". The Statesman. Retrieved 13 November 2024.
  38. ^ "Kolkata: New Garia-Airport Metro Work to Affect Traffic Near Chingrighata Junction; Check Advisory". Times Now. 28 February 2024. Retrieved 13 November 2024.
  39. ^ dev (4 June 2024). "Kolkata Metro Progress RVNL Nears Completion of Second Pier Prepares for Handover - Urban Acres". Retrieved 13 November 2024.
  40. ^ "Ritwik Ghatak Metro Station: ঋত্বিক ঘটক মেট্রো স্টেশনের কাজ শেষ পর্যায়ে, ফাস্ট লুকেই হাঁকাল ছক্কা! » Najarbandi 24X7". najarbandi.in (in Bengali). 29 September 2023. Retrieved 29 March 2024.
  41. ^ "After 6 yrs, Orange line's gap at Metropolitan bridged". The Times of India. ISSN 0971-8257. Retrieved 19 November 2024.
  42. ^ "Hanging bridge on Bypass solves Metro problem at Tagore Park". The Times of India. 3 November 2023. ISSN 0971-8257. Retrieved 29 March 2024.
  43. ^ a b "Trial run extended beyond Ruby to Metropolitan on Kolkata Metro's Airport Line | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 29 March 2024.
  44. ^ "মেট্রো থেকে বেরিয়েই নিক্কোপার্ক ও পিকনিক স্পট- কেমন দেখতে হচ্ছে নলবন স্টেশন?". Hindustantimes Bangla (in Bengali). 17 December 2023. Retrieved 24 December 2024.
  45. ^ SNS (8 July 2024). "Construction of Gour Kishor Ghosh station going on in full swing". The Statesman. Retrieved 13 November 2024.
  46. ^ "Kolkata: Deadline for Orange Line's Phase II extension revised to March 2025 due to construction delays". propnewstime.com. Retrieved 24 December 2024.
  47. ^ "Metro Railway Kolkata / Indian Railways Portal". mtp.indianrailways.gov.in. Retrieved 8 May 2024.
  48. ^ dev (19 July 2024). "Rs 727 Cr Sanctioned for Kolkata Flyover - Urban Acres". Retrieved 24 December 2024.
  49. ^ "Kolkata metro service on New Garia to airport corridor to be extended till Beleghata soon – Details inside". Financialexpress. 25 June 2024. Retrieved 24 December 2024.
  50. ^ a b "Ritwik Ghatak Metro Station: ঋত্বিক ঘটক মেট্রো স্টেশন চোখ ধাঁধানো, কাজ প্রায় শেষ, কেমন হল? দেখুন". Aaj Tak বাংলা (in Bengali). Retrieved 29 March 2024.
  51. ^ "নিউ গড়িয়া-বিমানবন্দর মেট্রো করিডোরে বড় খবর, নতুন স্টেশনের ছবি দেখুন". Eisamay (in Bengali). Retrieved 29 March 2024.
  52. ^ "Metro Railway Kolkata / Indian Railways Portal". mtp.indianrailways.gov.in. Retrieved 8 May 2024.
  53. ^ "Metro Railway Kolkata / Indian Railways Portal". mtp.indianrailways.gov.in. Retrieved 8 May 2024.