Jump to content

Nagpur-Bhandara-Gondia Expressway

From Wikipedia, the free encyclopedia
Nagpur-Bhandara-Gondia Expressway
Nagpur-Bhandara-Gondia Access Controlled Super Communication Expressway
Map
Expressway highlighted in red
Route information
Maintained by MSRDC
Length127 km (79 mi)
ExistedDec 2024 (expected)–present
Major junctions
West endGavasi Village, Nagpur district
East endSawari Village, Gondia district
Location
CountryIndia
StatesMaharashtra
Major citiesNagpur, Kuhi, Bhandara, Tirora,and Gondia
Highway system

The Nagpur-Bhandara-Gondia Expressway, officially named the Nagpur-Bhandara-Gondia Access Controlled Super Communication Expressway, is a planned four-lane greenfield project that connects the cities of Vidarbha which are Kuhi, Bhandara, Tirora and Gondia to Mumbai-Nagpur Expressway.[1] Proposed as four lanes wide, this segment will reduce the road distance between Nagpur SEZ and Bhandara-Gondia and bring down travel time between Nagpur SEZ and Bhandara-Gondia further to capital of state Mumbai.[2]

Route alignment[edit]

The Nagpur-Bhandara-Gondia Expressway will travel through Nagpur, Bhandara, and Gondia districts directly.[3]

Cities and towns[edit]

Below are the lists of cities/towns through which the Nagpur-Bhandara-Gondia Expressway will connect:

Construction[edit]

MSRDC had applied for Environmental Clearance in October 2023 and invited bids for civil construction in February 2024 with a 2.5 year construction deadline. Bids were opened in early May to reveal 8 firms had submitted a total of 20 bids..:[4]

Sr. No. Package Length in km Contractor
1. NG-01 (29.40 km): 0.000 to 29.400 29.400 Afcons Infrastructure Ltd.
2. NG-02 (29.450 km): 29.400 to 58.850 29.450 Afcons Infrastructure Ltd.
3. NG-03 (31.226 km): 94.100 to 121.500 31.226 NCC Ltd.
4. NG-04 (37.052 km): 121.500 to 144.807 37.052 NCC Ltd.

Status updates[edit]

See also[edit]

References[edit]

  1. ^ "Nagpur – Gondia Expressway – Information & Status". 7 July 2024.
  2. ^ "'Nagpur To Gondia Expressway Project: 8 Firms Play Bids For The Work'". 7 July 2024.
  3. ^ "'Direct Purchase of Land acquisition for Express Way Nagpur to Gondia, Tahsil-Gondia, Dist-Gondia'". 7 July 2024.
  4. ^ "'Nagpur – Gondia Expressway: Afcons & NCC Win Contracts'". 7 July 2024.

External links[edit]