Jump to content

Maple Leaf (Lehigh Valley Railroad train)

From Wikipedia, the free encyclopedia
Maple Leaf
Overview
Service typeInter-city rail
StatusDiscontinued
LocaleNortheastern United States/Ontario
PredecessorToronto
First service1937
Last serviceFebruary 3, 1961
Former operator(s)Lehigh Valley Railroad
Canadian National Railway
Reading Railroad
Route
TerminiNew York City and Philadelphia
Toronto
Distance travelled548 miles (882 km) (New York City-Toronto)
Average journey time13 hours, 50 minutes, northbound
13 hours, 25 minutes, southbound (1953)
Service frequencyDaily
Train number(s)Northbound: 7
Southbound: 8
On-board services
Seating arrangementsCoach
Sleeping arrangementsOpen-sections, double bedrooms and drawing room
Catering facilitiesDining car (New York City-Lehighton, Pennsylvania)
Observation facilitiesCafe-lounge (New York City-Lehighton); cafe-parlor car (Niagara Falls, ON-Toronto)
Technical
Track gauge4 ft 8+12 in (1,435 mm)

The Maple Leaf was an international night train between New York City and Toronto, operated by the Lehigh Valley Railroad in coordination with the Canadian National Railway.[2] It ran from Penn Station in New York City and concluded at Toronto's Union Station. The train's service began in 1937; a predecessor Lehigh Valley Railroad train, the Toronto, traveled the same route. The Maple Leaf and the John Wilkes were the last named passenger trains operated by the Lehigh Valley Railroad.[3]

The route was double tracked from New York City to Niagara Falls and the Finger Lakes Region. In contrast to the Lehigh Valley Railroad's Black Diamond and Star, it bypassed Ithaca on the northbound trip. However, in the final years of the Maple Leaf, after the discontinuance of those trains, it did stop in Ithaca. The train had an alternate section operated with the Reading Railroad, which originated at Reading Terminal in Philadelphia and linked with the main part of the Maple Leaf train in Bethlehem.[2]

The train had its final departure on February 3, 1961.[4][3]

In 1981, Amtrak and Via Rail reintroduced the Maple Leaf name for their New York–Toronto train, the first direct rail service between these cities since 1967. The modern Maple Leaf uses the Empire Corridor through New York state rather than the historic route of the Lehigh Valley train, neither entering New Jersey nor Pennsylvania.

References

[edit]
  1. ^ "Lehigh Valley Railroad Timetable". Lehigh Valley Railroad . 25 October 1959. p. 144. Retrieved 23 August 2024.
  2. ^ a b Timetable. Lehigh Valley Railroad. September 27, 1953. Tables 1, 2
  3. ^ a b "Last of the Railroad - Era Passes Tonight as Lehigh Ends Service". Geneva Times. February 3, 1961. Archived from the original on October 13, 2008.
  4. ^ "Direct Link To N.Y. CN Link To Be Cut". St. Catherines Standard. February 2, 1961.