Jump to content

Longkou–Yantai railway

From Wikipedia, the free encyclopedia
Longkou–Yantai railway
Overview
Native name龙烟铁路
StatusOperational
Termini
History
Opened19 December 2017 (2017-12-19)
Technical
Line length113 km (70 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map

(Up arrow Dajiawa–Laizhou–Longkou railway to ‹See TfM›Dajiawa)
Longkou West
(Right arrow Dajiawa–Laizhou–Longkou railway to ‹See TfM›Longkougang)
0
Lutou
8
Longkoushi
22
Beigou
32
Wangli
43
Penglaishi
53
Xizhao
62
Jiesongying
Dajijia North
71
Dajijia
Bajiao
92
Yantai West
Beizao (signal station)
Zhuji (signal station)
105
Zhuji
Yantai

The Longkou–Yantai railway (Chinese: 龙烟铁路; pinyin: Lóng–Yān tiělù) is a railway line in Yantai, Shandong, China.

History

[edit]

Construction of the line began in November 2013 and was completed in October 2017. The line opened on 19 December 2017.[1] Passenger services were introduced on 22 January 2018.[2]

Route

[edit]

The line is 113 kilometres (70 miles) long and has a maximum speed of 160 kilometres per hour (99 miles per hour).[3] The line starts at Longkou West railway station on the Dajiawa–Laizhou–Longkou railway. and continues east. It end at Zhuji railway station on the Lancun–Yantai railway.[4]

References

[edit]
  1. ^ "山东龙烟铁路正式具备通车条件 12月28日开跑 - 地方铁路 - 世界轨道交通资讯网-世界轨道行业排名领先的艾莱资讯旗下的专业轨道交通资讯网". 胶东在线. 2017-12-19. Retrieved 2023-03-26.
  2. ^ "烟台市旅发委推出乘高速火车城乡互动旅游惠民活动". 2018-01-22. Archived from the original on 2018-01-23. Retrieved 2023-03-26.
  3. ^ "新建龙口至烟台铁路开通运营 丰沙铁路改建工程完工". 2017-12-24. Archived from the original on 2018-01-08. Retrieved 2023-03-26.
  4. ^ "龙烟铁路". 山东铁路建设投资有限公司. Archived from the original on 2017-12-27. Retrieved 2023-03-26.