List of generating stations in Alberta
This is a list of electrical generating stations in Alberta, Canada.
In 2023 Alberta produced 74% of its electricity through natural gas.[1] Alberta has a deregulated electricity market[2] which allows a large number of private companies to participate in electricity production, particularly in the cases of cogeneration and renewable energy. Alberta's electricity mix is changing towards lower carbon intensity. As of 2013, Alberta's electricity was 52% coal, 38% natural gas and 10% renewable. Ten years later in 2023, this had changed to 74% gas, 8% coal, and 18% renewable.[1] As of June 18, 2024, Capital Power announced that the last coal capable generator was now 100% natural gas-fueled and coal is no longer a source of electricity in Alberta.[3] Alberta has a legislated goal of achieving 30% renewable electricity by 2030.[4]
Fossil fuel
[edit]Natural gas
[edit]Renewable
[edit]Biomass, biogas, and waste heat recovery
[edit]Name | Location | Capacity (MW) |
Date | Owner | Type | Ref |
---|---|---|---|---|---|---|
Alberta Pacific Forest (AFG1) | Athabasca | 131 | 1993–2012 | Alberta Pacific Forest | Biomass | [51] |
Bonnybrook (BON1) | Calgary | 10 | 2021 | City of Calgary | Biomass | [52][53] |
Bear Creek 2 (BCR2) | Grande Prairie | 36 | 2002 | TransCanada | Biomass+Waste Heat | [54] |
Cancarb Waste Heat Recovery Plant (CCMH) | Medicine Hat | 42 | 2000 | Tokai Carbon Co. Ltd. | Waste heat | [55] |
Clover Bar Landfill Gas | Edmonton | 5 | 2005 | Capital Power | Biogas | [56] |
DAI1 Daishowa (DAI1) Peace River Pulp Mill |
Peace River | 52 | 1990–2012 | Daishowa-Marubeni International | Biomass | [57] |
Gold Creek Generation Facility (GOC1) | 54°49′59″N 118°39′10″W / 54.83306°N 118.65278°W | 5 | 1999 | Maxim Power | Waste heat | [58] |
Grande Prairie EcoPower (GPEC) | Grande Prairie | 18 | 2005 | Canadian Forest Products Ltd. | Biomass | [59] |
NRGreen (NRG3) | Whitecourt | 16 | 2015 | NRGreen Power Limited Partnership | Waste Heat | [60] |
Slave Lake (SLP1) | Slave Lake | 9 | 2016 | West Fraser Mills Ltd. | Biomass | [61][62] |
Weldwood #1 (WWD1) Hinton Pulp Units 1 & 2 |
Hinton | 50 | 1985–2011 | West Fraser Timber | Biomass | [63] |
Westlock (WST1) Dapp Biomass Project |
Dapp | 16 | 1999 | Fortistar | Biomass | [64][65] |
Weyerhaeuser (WEY1) Grande Prairie Pulp Mill |
Grande Prairie | 48 | 2011 | International Paper Canada Pulp Holdings | Biomass | |
Whitecourt Power (EAGL) | Whitecourt | 25 | 1994 | Macquarie Power & Infrastructure | Biomass | [66] |
Judy Creek ORC | Swan Hills | 2.2 | 2012 | Genalta Power | Waste Heat | [67] |
Valley Power | Drayton Valley | 12 | 1996 | Algonquin Power | Biomass | [68] |
Wheatland BioFuel Facility | Wheatland County | 1 | 2022 | Carbon Clean Energy Inc. | Biogas | [69] |
East Calgary Landfill Gas to Electricity Facility | Calgary | 1 | 2023 | City of Calgary | Biogas | [70] |
Geothermal
[edit]List of all geothermal power stations in Alberta. More than 388,500 MW of geothermal generation potential remains untapped, which is approximately 24 times Alberta's total installed generating capacity in 2019.[71]
Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Greenview Geothermal Power Plant (Alberta No. 1) | Municipal District of Greenview No. 16 | 5 | 2023 | Terrapin Geothermics | [72] |
Hydroelectric
[edit]List of all hydroelectric power stations power plants in Alberta. More than 11,500 MW of hydroelectric potential remains untapped.[73]
Wind
[edit]Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Ardenville Wind Farm (ARD1) | Fort Macleod | 66 | 2010 | TransAlta | [96][97] |
Blackspring Ridge (BSR1) | Vulcan County | 300 | 2014 | EDF Renewables, Enbridge | [98][99] |
Blue Trail (BTR1) | Fort Macleod | 66 | 2009 | TransAlta | [100] |
Buffalo Atlee (BFL1) | Special Area No. 2 | 18 | 2023 | Capstone Infrastructure | [101][102] |
Buffalo Atlee (BFL2) | Special Area No. 2 | 18 | 2023 | Capstone Infrastructure | [101][102] |
Buffalo Atlee (BFL3) | Special Area No. 2 | 18 | 2023 | Capstone Infrastructure | [101][102] |
Buffalo Atlee (BFL4) | Special Area No. 2 | 18 | 2023 | Capstone Infrastructure | [101][102] |
Buffalo Plains Wind Farm (BPW1) | Lomond | 466 | 2024 | Copenhagen Infrastructure Partners | [103] |
Bull Creek (BUL1 and BUL2) | Provost | 29 | 2015 | BluEarth Renewables | [104] |
Castle River (CR1) | Pincher Creek | 44 | 2000 | TransAlta | [105] |
Castle Rock Wind Farm (CRR1) | Drumheller | 77 | 2012 | Enel | [96] |
Castle Rock Ridge 2 (CRR2) | Pincher Creek | 29 | 2020 | Enel Green Power | [106] |
Chin Chute (SCR3) | Taber | 30 | 2006 | Acciona, Enbridge, Suncor Energy | [107][108] |
Cowley Ridge (CRE3) | Cowley | 20 | 2001 | TransAlta | [109] |
Cypress 1 (CYP1) Cypress Wind Power Project |
Forty Mile | 196 | 2023 | EDF Renewables | [110][111] |
Cypress 2 (CYP2) | Forty Mile | 46 | 2023 | EDF Renewables | [110][111] |
Forty Mile Bow Island (FRM1) | Forty Mile | 266 | 2024 | RES | [112][113][114] |
Forty Mile Granlea (FMG1) | Forty Mile | 220 | 2022 | ATCO | [115] |
Garden Plain (GDP1) Garden Plain |
County of Paintearth No. 18 | 130 | 2023 | TransAlta | [116] |
Ghost Pine Wind Energy Centre (NEP1) | Drumheller | 82 | 2010 | NextEra | [117] |
Grizzly Bear Creek (GRZ1) Grizzly Bear Wind Power Project |
Minburn County No. 27 | 152 | 2023 | Enel Green Power | [118] |
Halkirk (HAL1) | Halkirk | 150 | 2012 | Capital Power | [119] |
Halkirk Wind Project Phase 2 (HAL2) | Paintearth County No. 18 | 126 | 2024 | CapitalPower | [120][121] |
Hand Hills (HHW1) Hand Hills |
Starland County | 145 | 2023 | BluEarth Renewables | [122] |
Hilda Wind (HLD1) Hilda Wind |
Cypress County | 100 | 2023 | RES Canada | [123] |
Jenner 1 (JNR1) Jenner Wind Project (Phase 1) |
Special Area No. 2 | 122 | 2023 | Potentia Renewables Inc. | [124][125] |
Jenner 2 (JNR2) Jenner Wind Project (Phase 2) |
Special Area No. 2 | 71 | 2023 | Potentia Renewables Inc. | [124][126] |
Jenner 3 (JNR3) Jenner Wind Project (Phase 3) |
Special Area No. 2 | 109 | 2023 | Potentia Renewables Inc. | [124][127] |
Kettles Hill (KHW1) | Pincher Creek | 63 | 2006 | Enmax | [128] |
Lanfine Wind (LAN1) | Special Area No. 3 | 151.2 | 2023 | Pattern Energy | [129][130] |
Macleod Flats | Fort Macleod | 3 | 2004 | TransAlta | [131] |
Magrath (SCR2) | Magrath | 30 | 2004 | Acciona, Enbridge, Suncor Energy | [107][108] |
McBride Lake (AKE1) | Fort Macleod | 75 | 2003 | Enmax, TransAlta | [132][133] |
Oldman River Wind Project | Pincher Creek | 3.6 | 2007 | Alberta Wind Energy Corporation | [134] |
Oldman 2 (OWF1) | Pincher Creek | 46 | 2014 | Mainstream Renewable Power | [135] |
Paintearth Wind Project (PAW1) | Special Area No. 18 | 198 | 2023 | Potentia Renewables Inc. | [136] |
Rattlesnake Ridge (RTL1) | Whitla | 130 | 2022 | Berkshire Hathaway Energy Canada | [137] |
Riverview (RIV1) | Pincher Creek | 105 | 2020 | Enel Green Power | [138] |
Sharp Hills (SHH1) | Special Area 3 | 297.1 | 2023 | EDP Renewables | [139][140] |
Sinnott | Cowley | 7 | 2001 | TransAlta | [141] |
Soderglen (GWW1) | Fort Macleod | 70.5 | 2006 | Nexen, TransAlta | [142] |
Stirling Wind Phase 1 (SWP1) | Warner County No. 5 | 113 | 2023 | Greengate Power Corporation | [143][144] |
Summerview 1 (IEW1) | Pincher Creek | 70 | 2004 | TransAlta | [145] |
Summerview 2 (IEW2) | Pincher Creek | 66 | 2010 | TransAlta | [146] |
Taber Wind Farm (TAB1) | Taber | 80 | 2007 | Enmax | [147] |
Whitla Wind 1 (WHT1) | Forty Mile | 202 | 2019 | Capital Power | [148] |
Whitla Wind 2 (WHT2) | Forty Mile | 151 | 2021 | Capital Power | [149] |
Windrise (WRW1) | Fort Macleod | 206.4 | 2021 | TransAlta | [150] |
Wild Rose 2 | Cypress County | 192 | 2024 | Capstone Infrastructure | [151] |
Winnifred Wind Project (WIN1) | Forty Mile | 136 | 2024 | Enerfin Energy | [152] |
Wheatland (WHE1) | Wheatland County | 122.4 | 2022 | Greengate Power Corporation | [153] |
Wintering Hills Wind Farm (SCR4) | Drumheller | 88 | 2011 | Suncor | [154] |
Forty Mile Wind Project Phase 2 | Forty Mile | 119.7 | Q3 2025 | RES | [112][113] |
Northern Valley Wind Project | Two Hills County No. 21 | 75 | 2024 | Elemental Energy | [155][156] |
Bull Trail Wind | Cypress County | 270 | 2026 | EDF Renewables | [157] |
Solar
[edit]Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Barlow Solar (BLS1) Barlow Solar Park |
Calgary | 31 | 2023 | DP Energy | [158] |
Big Sky Solar (ACD1) | Acadia No. 34 | 140 | 2024 | RES | [159] |
Brooks Solar (BSC1) | Brooks | 15 | 2017 | Elemental Energy | [160] |
Brooks Solar 1 (BRK1) Brooks Solar II Project |
Brooks | 13 | 2022 | Elemental Energy | [161] |
Brooks Solar 2 (BRK2) Brooks Solar II Project |
Brooks | 14 | 2022 | Elemental Energy | [161] |
Burdett (BRD1) Alberta Solar One Project |
Burdett | 10.5 | 2021 | Enbridge, Morgan Solar Inc | [162][163] |
Burdett Solar (BUR1) | Burdett | 20 | 2021 | BluEarth Renewables | [164] |
Chappice Lake (CHP1) Chappice Lake Solar Storage Project |
Cypress County | 14 | 2023 | Elemental Energy | [165][166] |
Claresholm 1 (CLR1) Claresholm Solar Project |
Claresholm | 58 | 2021 | Capstone Infrastructure | [167][168] |
Claresholm 2 (CLR2) Claresholm Solar Project |
Claresholm | 75 | 2021 | Capstone Infrastructure | [167][168] |
Clydesdale 1 (CLY1) Clydesdale Solar Project |
Municipal District of Taber | 41 | 2022 | Capital Power | [169] |
Clydesdale 2 (CLY2) Clydesdale Solar Project |
Municipal District of Taber | 34 | 2022 | Capital Power | [169] |
Coaldale (COL1) Coaldale Solar Project |
Lethbridge County | 23 | 2022 | ACFN, Concord Coaldale Partnership | [170][171] |
Conrad 1 (CRD1) Wrentham Solar Project |
Wrentham | 23 | 2023 | Solar Krafte | [172] |
Conrad 2 (CRD2) Wrentham Solar Project |
Wrentham | 18 | 2023 | Solar Krafte | [172] |
Deerfoot Solar Park (DFT1) | Calgary | 41 | 2023 | DP Energy | [173][174] |
East Strathmore Namaka (NMK1) East Strathmore Solar Project |
Wheatland County | 20.5 | 2022 | Elemental Energy | [175] |
Empress | Empress | 39 | 2023 | Achernar GP Ltd | [176] |
Fox Coulée Solar Project (FCS1) | Starland County | 80 | 2023 | Neoen \ Subra LP | [177][178] |
Hays (HYS1) Canadian Solar Solutions Project |
Hays | 23 | 2021 | BluEarth Renewables | [179][180] |
Hull (HUL1) Prairie Sunlight II Project |
Vauxhall | 25 | 2020 | Solar Krafte Utilities | [181] |
Innisfail (INF1)
Innisfail Solar |
Innisfail | 22 | 2020 | Elemental Energy | [182] |
Jenner (JER1)
Canadian Solar Solutions Project |
Jenner | 23 | 2021 | BluEarth Renewables | [183][184] |
Joffre Solar 1 (JFS1) | Joffre | 25 | 2023 | PACE Canada LP | [185][186] |
Joffre Solar 2 (JFS2) | Joffre | 22 | 2023 | PACE Canada LP | [185][187] |
kisikaw-pisim 1 (KKP1)
kīsikāw pīsim Project |
Edmonton | 7 | 2022 | Epcor | [188][189] |
kisikaw-pisim 2 (KKP2)
kīsikāw pīsim Project |
Edmonton | 7 | 2022 | Epcor | [188][189] |
Kneehill Solar (TRH1)
Kneehill Solar Generation Facility |
Kneehill County | 25 | 2023 | Capstone Infrastructure | [190] |
Lethbridge Solar (CLD1) | Lethbridge | 9 | 2024 | Lethbridge One Solar Corp | [191] |
Michichi Creek (MCH1)
Drumheller Solar and Battery Storage Project |
Drumheller | 14 | 2023 | Concord Green Energy | [192][193] |
Michichi Solar (MIC1)
Michichi Solar Generation Facility |
Starland County | 25 | 2023 | Capstone Infrastructure | [194] |
Monarch (MON1)
Monarch Solar |
Lethbridge County | 24 | 2022 | Concord Coaldale Partnership | [195] |
Saddlebrook Solar Project (SDL1) | Foothills County | 81 | 2023 | TC Energy Corporation | [196] |
Scottford Refinery Solar Farm[note 2] | Strathcona County | 58 | 2023 | Silicon Ranch | [197][198] |
Sollair Solar Energy Plant (SCR1) | Airdrie | 75 | 2024 | General Land and Power | [199][200] |
Spring Coulee Solar (SGC1) | Spring Coulee | 30 | 2023 | Solar Krafte | [201] |
Strathmore 1 (STR1)
Strathmore Solar |
Strathmore | 18 | 2022 | Capital Power | [202] |
Strathmore 2 (STR2)
Strathmore Solar |
Strathmore | 23 | 2022 | Capital Power | [202] |
Stavely (STV1) | Stavely | 17 | 2023 | Concord Stavely Partnership | [203] |
Suffield (SUF1)
Suffield Solar |
Suffield | 23 | 2020 | Suffield Solar GP Inc. | [204] |
Three Nations Energy Solar Farm | Fort Chipewyan[note 2] | 2.2 | 2020 | Three Nations Energy (joint venture) | [205] |
Travers (TVS1) | Vulcan County | 465 | 2022 | Greengate Power | [206] |
Vauxhall (VXH1)
Prairie Sunlight III Project |
Taber | 22 | 2020 | Solar Krafte Utilities | [207] |
Westfield Yellow Lake (WEF1)
Yellow Lake Solar |
Forty Mile | 19 | 2021 | BluEarth Renewables | [208] |
Wheatcrest Solar Project (WCR1) | Taber | 50 | 2023 | BluEarth Renewables | [209] |
Youngstown Solar (YNG1) | Youngstown | 6 | 2023 | PACE Canada LP | [210][211] |
Brooks Solar Farm | Brooks | 360 | Q4 2023 | Solar Krafte | [212][213] |
Dunmore Solar Project | Cypress County | 216 | Q2 2025 | Ascent Energy Partners | [214][215] |
Enterprise Solar | Vulcan | 65 | Q4 2024 | Pattern Energy | [216][217] |
Forty Mile Granlea Phase 2 | Forty Mile | 220 | 2025 | ATCO | [218] |
Jurassic Solar + | Special Area No. 2 | 220 | Q2 2024 | Greengate | [219][220] |
Métis Crossing Solar Farm Project | Smokey Lake County | 4.86 | Q1 2024 | Métis Nation of Alberta | [221][222] |
Moon Lake Solar Project | Parkland County | 24.9 | 2025 | Voltarix Group | [223][224] |
Peace River Energy Project | Peace River | 5 | Q4 2025 | Peace Energy Cooperative | [225][226] |
Tilley Solar | Tilley | 24 | TBD | Concord Tilley Partnership | [227] |
Vauxhall Solar | Taber | 60 | Q4 2025 | Solar Krafte | [228][229] |
Vulcan Community Solar Project | Vulcan | 15 | 2025 | Fortis Alberta | [230] |
Airport City Solar | Leduc | 120 | 202x | Alpin Sun | [231][232] |
Caroline Solar | Caroline | 14 | Q2 2024 | PACE Canada LP | [233][234] |
Creekside Solar Project | Leduc County | 24.9 | Q4 2023 | Voltarix Group | [235][236] |
Dolcy Solar+ Project | Edgerton | 200 | 2024 | Westbridge Energy | [237][238] |
Georgetown Solar Project | Vulcan County | 278 | Q1 2025 | MYTILINEOS Energy & Metals | [239][240] |
Hanna Sheerness Solar | Hanna | 13 | Q4 2023 | PACE Canada LP | [241][242] |
Lathom Solar Project | Lathom | 120 | Q3 2023 | Greengate Power | [243][244] |
Luna Solar+ Phase I | Newell County | 465 | Q2 2024 | Greengate | [245][246] |
Luna Solar+ Phase II | Newell County | 465 | Q2 2025 | Greengate | [247][248] |
Saamis Solar | Medicine Hat | 325 | 2024 | DP Energy | [249][250] |
Vulcan Solar | Vulcan County | 77 | 2023 | EDF Renewable Energy | [251][252] |
Rocktree Solar Project | Parkland County | 22.6 | Q3 2023 | Voltarix Group | [253][254] |
High River Solar | Foothills County | 19 | Q4 2023 | Elemental Energy | [255] |
Nova Solar Project | Carseland | 150 | Q3 2024 | Renewable Energy Systems | [256][257] |
Sylvan Solar Farm (Phoenix) | Sylvan Lake | 170 | 2024 | Kiwetinohk Energy | [258][259] |
Homestead Solar Project | Claresholm | 400 | 2024 | Kiwetinohk Energy | [260][261] |
Aira Solar Project | Bow Island | 450 | Q1 2025 | Aria | [262] |
Estuary Solar Project | Cypress County | 200 | Q4 2025 | Greencells IndyGen Alberta Ltd | [263][264] |
Storage
[edit]Battery
[edit]Name | Location | Power Capacity (MW) |
Energy Capacity (MWh) |
Date | Owner | Ref |
---|---|---|---|---|---|---|
eReserve1 Rycroft (ERV1) | Spirit River | 20 | 35 | 2020 | Teric Power Ltd | [265] |
eReserve2 Buffalo Creek (ERV2) | Wainwright | 20 | 35 | 2021 | Teric Power Ltd | [266] |
eReserve3 Mercer Hill (ERV3) | Grande Prairie | 20 | 35 | 2022 | Teric Power Ltd | [267] |
eReserve4 (ERV4) | Hardisty | 20 | 35 | 2023 | TERIC Power Ltd | [268] |
eReserve5 Hughenden (ERV5) | Hughenden | 20 | 35 | January 16, 2023 | TERIC Power Ltd | [269] |
eReserve6 (ERV6) | Hardisty | 20 | 35 | 2023 | TERIC Power Ltd | [268] |
eReserve7 (ERV7) | Wapiti | 20 | 20 | 2023 | [270] | |
eReserve8 (ERV8) | Wapiti | 20 | 20 | 2023 | [271] | |
eReserve9 (ERV9) | Hythe | 20 | 20 | 2023 | [272] | |
Summerview (SUM1) WindCharger |
Pincher Creek | 10 | 20 | 2020 | TransAlta | [273] |
Whitla Storage Project | Whitla | 200 | 2400 | 202x | Teric Power Ltd | [274] |
Flow battery
[edit]Name | Location | Power Capacity (MW) | Energy Capacity (MWh) | Date | Owner | Ref |
---|---|---|---|---|---|---|
Saddlebrook Storage Project | Foothills County | 6.5 | 40 | Q4 2024 | TC Energy | [275] |
Pumped hydroelectric
[edit]List of all pumped hydroelectric storage plants in Alberta.
Name | Location | Power Capacity (MW) | Energy Capacity (MWh) | Date | Owner | Ref |
---|---|---|---|---|---|---|
Canyon Creek | Yellowhead County | 75–400[note 3] | ~2775 | 202x | Turning Point Generation, TC Energy | [276][277] |
Brazeau Hydro Pumped Storage[note 4] | 52°57′59″N 115°34′44″W / 52.96639°N 115.57889°W | 900 | 5,000 | 2025–2026 | TransAlta | [278][279] |
Geomechanical pumped
[edit]List of all geomechanical pumped storage plants in Alberta.
Name | Location | Power Capacity (MW) | Energy Capacity (MWh) | Date | Owner | Ref |
---|---|---|---|---|---|---|
Brooks | 202x | Quidnet | [280] |
Historical
[edit]Coal
[edit]Partial list of retired coal power plants in Alberta. There are no active coal generating stations in Alberta.
Name | Location | Capacity (MW) | Date | Owner | Ref |
---|---|---|---|---|---|
Genesee Generating Station unit 2 | 53°20′35″N 114°18′11″W / 53.34306°N 114.30306°W | 420 | (2024) | Capital Power | [281][282] |
Genesee Generating Station unit 3 | 53°20′35″N 114°18′11″W / 53.34306°N 114.30306°W | 466 | (2024) | Capital Power | [283] |
Battle River Generating Station units 1 & 2 | Forestburg | (56) | (1998) | Heartland Generation | [284] |
Keephills Generating Station unit 1 | Duffield | 395 | (2021) | TransAlta | - |
Keephills Generating Station unit 3 | Duffield | 466 | (2021) | Capital Power | [286] |
Sundance Power Station units 4 & 5 | 53°30′27″N 114°33′26″W / 53.50750°N 114.55722°W | 812 | (2021) | TransAlta | [44] |
H. R. Milner Generating Station | Grande Cache | (158) | (2019) | Milner Power | [287] |
Wabamun Generating Station Units 1–4 | Wabamun | (570) | (2003–2010) | TransAlta | [288] |
See also
[edit]Notes
[edit]References
[edit]- ^ a b "Total Generraton" (PDF). media.auc.ab.ca. 2023. Retrieved October 4, 2024.
- ^ "Guide to understanding Alberta's electricity market". AESO.
- ^ "Genesee Generating Station is off coal – all units 100% natural gas-fueled". Capital Power. Retrieved 2024-06-19.
- ^ "Renewable Electricity Act - Open Government". open.alberta.ca.
- ^ Maxim Power Corp., Alberta Power Project (APP), retrieved 2010-08-27
- ^ "CCGT Plants in Canada - Alberta", Power Plants Around the World, archived from the original on January 26, 2013, retrieved 2010-08-22
{{citation}}
: CS1 maint: unfit URL (link) - ^ Jones, Jeffrey (2009-06-23), "Nexen may sell gas, power marketing businesses", Reuters, retrieved 2010-08-27
- ^ a b Heartland Generation, Battle River Generating Station, retrieved 2022-06-02
- ^ TransCanada, Assets, retrieved 2010-08-27
- ^ Alberta Utilities Commission, Genalta Construction GP Ltd. - AUC.ab.ca (PDF), retrieved 2015-03-08
- ^ The Alberta Utilities Commission (2013-05-02), Decision 2013-165 – Genalta Power Systems Inc.; 15 MW natural gas-fired power plant (PDF), retrieved 2015-03-06
- ^ Enmax, Calgary Energy Centre, archived from the original on 2011-07-10, retrieved 2010-08-22
- ^ The Alberta Utilities Commission (2014-06-19), DA2014-145 – Transfer of Ownership of a 15-MW Gas-Fired Turbine Power Plant (PDF), retrieved 2015-03-05
- ^ Kineticor, Cascade Power Project, retrieved 2020-09-07
- ^ Alberta, Government of. "Cascade Power Project". majorprojects.alberta.ca. Retrieved 2024-02-26.
- ^ Capital Power Corporation, Clover Bar Energy Centre, archived from the original on 2010-09-04, retrieved 2010-08-22
- ^ Enmax, Crossfield Energy Centre, retrieved 2010-08-22
- ^ "Empress Cogeneration Power Facility". Alberta Major Projects. Government of Alberta. Retrieved 2021-07-10.
- ^ TransAlta, Plants in Operation, retrieved 2012-02-28
- ^ "Genesee Power Plant Natural Gas Conversion". Alberta Major Projects. Government of Alberta. Retrieved 2021-07-10.
- ^ Capital Power, Genesee Generating Station, retrieved 2021-07-10
- ^ "Harvest Operations Gas Fired Power Plant". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
- ^ Heartland Petrochemical Complex, retrieved 2021-12-05
- ^ Milner Power, H. R. Milner Generating Station, retrieved 2021-08-01
- ^ ATCO Power, Joffre Cogeneration Plant, archived from the original on 2010-07-27, retrieved 2010-08-21
- ^ The Alberta Utilities Commission (2014-06-20), DA2014-146 – Transfer of Ownership of 15-MW Gas-fired Power Plant (PDF), retrieved 2015-03-05
- ^ TransAlta, SemCAMS Cogeneration Project, retrieved 2020-09-07
- ^ AESO, Keephills Generating Station 2, retrieved 2021-08-01
- ^ TransAlta, Keephills Generating Station 2, retrieved 2021-08-01
- ^ ATCO Power, Muskeg River Cogeneration Plant, retrieved 2010-08-27
- ^ SaskPower, Cogeneration Stations, retrieved 2010-10-09
- ^ Constellation Energy, Northern Prairie Power Project – Project Description (PDF), retrieved 2010-08-27
- ^ Genaltapower, Genalta Power and Baytex Energy announce activation of first phase in 20MW gas conservation power project, retrieved 2015-03-05
- ^ Genalta Power
- ^ ATCO Power, Poplar Hill Generating Plant, archived from the original on 2009-02-07, retrieved 2010-08-21
- ^ ATCO Power, Primerose Cogeneration Plant, retrieved 2010-08-21
- ^ ATCO Power, Rainbow Lake Generating Station 1, 2 and 3, retrieved 2010-08-21
- ^ ATCO Power, Rainbow Lake Generating Station 4 and 5, retrieved 2010-08-21
- ^ ATCO Power, Scotford Cogeneration Plant, retrieved 2010-08-21
- ^ AESO, Sheerness Generating Station, retrieved 2021-08-01
- ^ gem.wiki, Sheerness Generating Station, retrieved 2021-08-01
- ^ ENMAX, Shepard Energy Centre, retrieved 2015-09-16
- ^ ATCO Power, Sturgeon Generating Plant, retrieved 2010-08-21
- ^ a b "Sundance". TransAlta Power. Retrieved 2022-01-01.
- ^ "Sundance Coal to Gas". TransAlta Power. Retrieved 2021-02-25.
- ^ "Three Creeks Power Plant". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
- ^ University of Alberta, Heating Plant, retrieved 2011-09-26
- ^ University of Calgary, Central Heating and Cooling Plant, retrieved 2019-05-24
- ^ University of Calgary, New U of C power plant will slash emissions, retrieved 2019-05-24
- ^ ATCO Power, Valleyview 1 and 2 Generating Plants, retrieved 2010-08-21
- ^ Alberta Pacific Forest, Chemical Recovery & Utilities, retrieved 2010-08-27
- ^ Alberta, Government of. "Bonnybrook WWTP Cogeneration Expansion". majorprojects.alberta.ca. Retrieved 2023-11-17.
- ^ Services, Water Resources and Water. "Bonnybrook Wastewater Treatment Plant Upgrades and Expansion". www.calgary.ca. Retrieved 2023-11-17.
- ^ "TC Energy — Bear Creek Cogeneration Plant". www.tcenergy.com. Retrieved 2023-10-29.
- ^ "Cancarb Sold: Medicine Hat Facility Purchased By Japanese Firm For $190 Million". HuffPost Canada. Retrieved 2017-07-07.
- ^ Capital Power Corporation, Clover Bar Landfill Gas, retrieved 2010-08-27
- ^ Daishowa-Marubeni International Ltd, Green Power Enhancement Project, retrieved 2012-10-16
- ^ Maxim Power Corp., Gold Creek, Alberta, retrieved 2010-08-27
- ^ "Energy - Pellets and Energy Generation | Canfor". www.canfor.com. Retrieved 2023-11-17.
- ^ "Whitecourt Energy Efficiency Project". Emissions Reduction Alberta. Retrieved 2023-12-27.
- ^ "Energy Initiatives - West Fraser".
- ^ Snook, Andrew (2016-03-31). "Slave Lake creates green power from biogas". Canadian Biomass Magazine. Retrieved 2023-12-27.
- ^ DNatural Resources Canada, Government of Canada Investing in Environmental Improvements at Hinton Pulp Mill, retrieved 2012-10-16
- ^ Verdant Energy, Dapp Biomass Project, retrieved 2010-08-27
- ^ Hager, Heather (2011-10-31). "Power to the People at Dapp". Canadian Biomass Magazine. Retrieved 2023-12-27.
- ^ Macquarie Power & Infrastructure Income Fund, Whitecourt, retrieved 2010-08-22
- ^ Genaltapower, Genalta Power Aggravated heat recovery, retrieved 2015-03-06
- ^ Algonquin Power, Valley Power, retrieved 2010-08-22
- ^ Alberta Major Projects, Project Wheatland BioFuel Facility, retrieved 2021-12-10
- ^ Alberta Major Projects, East Calgary Landfill Gas to Electricity Facility, retrieved 2021-12-10
- ^ Duncanson, Sander; Kennedy, Jessica; Baker, Jesse (2020-11-02). "Alberta government introduces Bill 36: The Geothermal Resource Development Act". Osler, Hoskin & Harcourt. Retrieved 2021-02-06.
- ^ "Greenview Geothermal Power Plant (Alberta No. 1)". Alberta Major Projects. Retrieved 2021-01-12.
- ^ "Hydroelectricity in Alberta Today - Electricity & Alternative Energy - Alberta's Energy Heritage". www.history.alberta.ca. Retrieved 2021-02-06.
- ^ "Home". AMISK Hydroelectric Project. Retrieved 2021-01-02.
- ^ Berrade, David (2020-06-09). "Amisk Hydroelectric Project Update" (PDF).
- ^ TransAlta, Barrier Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Bearspaw Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Belly River Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Bighorn Dam, retrieved 2021-08-01
- ^ TransAlta, Brazeau Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Cascade Hydroelectric Dam, retrieved 2021-08-01
- ^ "IRRICAN POWER GENERAL OVERVIEW" (PDF). St. Mary River Irrigation District. Archived from the original (PDF) on 2012-03-11. Retrieved 2010-08-27.
- ^ Algonquin Power, Dickson Dam, retrieved 2010-08-25
- ^ TransAlta, Ghost Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Horseshoe Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Interlakes Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Kananaskis Hydroelectric Dam, retrieved 2021-08-01
- ^ ATCO Power, Oldman River Hydroelectric Plant, retrieved 2010-08-25
- ^ TransAlta, Pocaterra Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Rundle Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Spray Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, St. Mary Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Taylor Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Three Sisters Hydroelectric Dam, retrieved 2021-08-01
- ^ TransAlta, Waterton Hydroelectric Dam, retrieved 2021-08-01
- ^ a b Government of Alberta, "Electricity Statistics", Alberta Energy, archived from the original on 2010-08-26, retrieved 2010-08-27
- ^ TransAlta, Ardenville, retrieved 2012-10-02
- ^ EDF Renewables, Blackspring Ridge Wind, retrieved 2020-09-06
- ^ Enbridge, Blackspring Ridge, retrieved 2020-09-06
- ^ TransAlta, Blue Trail, retrieved 2010-08-23
- ^ a b c d Buffalo Atlee, Buffalo Atlee (Phase 1-4), retrieved 2021-06-05
- ^ a b c d Alberta, Government of. "Buffalo Atlee Wind Project (Phase 1 - 4)". majorprojects.alberta.ca. Retrieved 2024-01-31.
- ^ "New Asset Buffalo Plains (BPW1 Notice)". AESO.
- ^ BluEarth Renewables, Bull Creek Wind, retrieved 2020-09-06
- ^ TransAlta, Castle River, retrieved 2010-08-22
- ^ Enel Green Power (27 March 2019), Castle Rock Ridge 2, retrieved 2020-09-06
- ^ a b Acciona Energía, Own facilities, archived from the original on 2009-01-14, retrieved 2010-08-22
- ^ a b Suncor Energy, Wind Energy, retrieved 2010-08-22
- ^ TransAlta, Cowley North, retrieved 2010-08-22
- ^ a b EDF Renewables, Cypress Wind Power Project, retrieved 2021-05-08
- ^ a b Alberta, Government of. "Cypress Wind Power Project". majorprojects.alberta.ca. Retrieved 2023-04-15.
- ^ a b "Forty Mile Wind Project Phase 1". RES. Retrieved 2023-01-20.
- ^ a b Alberta, Government of. "Forty Mile Wind Project (ACCIONA Energía)". majorprojects.alberta.ca. Retrieved 2023-12-03.
- ^ "New Asset Forty Mile Bow Island (FRM1) Notice". AESO. Retrieved 2024-06-02.
- ^ https://www.aeso.ca/market/market-updates/2024/fmg1-forty-mile-granlea-mc-increase-notice
- ^ TransAlta, Garden Plain Wind Projet, retrieved 2023-07-04
- ^ NextEra Energy, Ghost Pine Wind Energy Centre Fact Sheet (PDF), retrieved 2012-10-02
- ^ Grizzly Bear Wind Power Project, Grizzly Bear Wind Power Project, retrieved 2021-07-05
- ^ Capital Power, Halkirk Wind Project, retrieved 2012-10-04
- ^ CapitalPower, Halkirk Wind Project Phase 2, retrieved 2021-12-10
- ^ "New Asset Halkirk 2 (HAL2 Notice)". AESO. Retrieved 2024-10-04.
- ^ BluEarth Renewables, Hand Hills Wind Project, retrieved 2021-12-10
- ^ RES Canada, Hilda Wind, retrieved 2021-12-10
- ^ a b c Jenner Wind Project, Jenner Wind Project (Phase 1-3), retrieved 2021-06-05
- ^ "New Asset Jenner (JNR1) Notice". AESO. Retrieved 2023-10-29.
- ^ "New Asset Jenner (JNR2) Notice". AESO. Retrieved 2023-08-30.
- ^ "New Asset Jenner (JNR3) Notice". AESO. Retrieved 2023-10-29.
- ^ Enmax, Kettle Hills Wind Farm, retrieved 2010-08-22
- ^ Lanfine Wind Power Project, Lanfine Wind Power Project, retrieved 2023-01-20
- ^ Alberta, Government of. "Lanfine North Wind Power Project". majorprojects.alberta.ca. Retrieved 2023-04-15.
- ^ TransAlta, Macleod Flats, retrieved 2010-08-22
- ^ TransAlta, McBride Lake, retrieved 2010-08-22
- ^ Enmax, McBride Lake Wind Farm, archived from the original on 2010-07-13, retrieved 2010-08-22
- ^ Alberta Wind Energy Corporation, Projects, archived from the original on 2010-04-21, retrieved 2010-08-23
- ^ Mainstream RP, Oldman Wind Plant, retrieved 2010-08-22
- ^ Paintearth Wind Project, Paintearth Wind Project, retrieved 2023-01-20
- ^ Berkshire Hathaway Energy Canada, Rattlesnake Ridge Wind Project, retrieved 2022-02-27
- ^ Enel Green Power, Riverview, retrieved 2010-08-22
- ^ EDP Renewables, Sharp Hills Wind Farm, retrieved 2021-08-20
- ^ "New Asset Sharp Hill Wind (SHH1) Notice". AESO. Retrieved 2023-08-30.
- ^ TransAlta, Sinnott, retrieved 2010-08-22
- ^ TransAlta, Soderglen, retrieved 2010-08-22
- ^ Stirling Wind, Stirling-Wind, retrieved 2023-07-04
- ^ "New Asset Stirling Wind (SWP1) Notice". AESO. Retrieved 2023-07-21.
- ^ TransAlta, Summerview, retrieved 2010-08-22
- ^ TransAlta, Summerview 2, retrieved 2010-08-22
- ^ Enmax, Taber Wind Farm, retrieved 2010-08-22
- ^ Capital Power, Whitla Wind, retrieved 2020-09-06
- ^ Capital Power, Whitla Wind 2, retrieved 2020-09-07
- ^ TransAlta, Windrise, retrieved 2020-11-29
- ^ https://www.aeso.ca/market/market-updates/2024/wild-rose-2-wind-inc-wir1-notice/
- ^ https://www.aeso.ca/market/market-updates/2024/new-asset-winnifred-wind-win1-notice
- ^ Greengate Power Corporation, Wheatland Wind Project, retrieved 2020-09-07
- ^ Suncor Energy, Wind Power, retrieved 2012-10-02
- ^ Alberta, Government of. "Northern Valley Wind Project". majorprojects.alberta.ca. Retrieved 2023-12-03.
- ^ "Northern Valley Wind". Elemental Energy. Retrieved 2023-12-03.
- ^ EDF Renewables, Bull Trail Wind, retrieved 2020-11-29
- ^ DP Energy, Barlow Solar Park, retrieved 2020-09-07
- ^ https://www.aeso.ca/market/market-updates/2024/new-asset-big-sky-solar-acd1-notice
- ^ Elemental Energy, Brooks Solar, retrieved 2020-09-01
- ^ a b Elemental Energy, Brooks Solar II, retrieved 2020-09-07
- ^ Enbridge, Alberta Solar One Project, retrieved 2021-02-25
- ^ Morgan Solar Inc, Alberta Solar One, retrieved 2021-02-25
- ^ BluEarth Renewables, Burdett Solar Project, retrieved 2020-09-01
- ^ "Chappice Lake Solar Storage Project". Elemental Energy. Retrieved 2021-12-10.
- ^ "New Asset Chappice Lake (CHP1) Notice". AESO. Retrieved 2023-04-24.
- ^ a b AESO, New Assets Claresholm (CLR1 and CLR2) Notice, retrieved 2021-01-26
- ^ a b Capstone Infrastructure, Claresholm, retrieved 2021-02-25
- ^ a b "Clydesdale Solar". Clydesdale Solar. Retrieved 2023-01-25.
- ^ AESO, Coaldale Solar, retrieved 2022-04-18
- ^ Kiehlbauch, Pat. "ACFN Green Energy LP". Greenplanet Energy Analytics. Retrieved 2023-04-15.
- ^ a b Solar Krafte, Wrentham Solar Project, retrieved 2020-09-07
- ^ DP Energy, Deerfoot Solar Park, retrieved 2020-09-07
- ^ "New Asset Deerfoot (DFT1) Notice". AESO. Retrieved 2023-07-21.
- ^ Elemental Energy, East Strathmore Solar Project, retrieved 2022-06-02
- ^ "New Asset Empress Solar Park (EMP1) Notice". AESO. Retrieved 2023-04-30.
- ^ "New Asset Fox Coulee Solar (FCS1) Notice". AESO. Retrieved 2023-10-13.
- ^ "ATB finances Subra Limited Partnership and Fox Coulee Solar Project | McCarthy Tétrault". www.mccarthy.ca. 2023-12-22. Retrieved 2024-01-31.
- ^ Canadian Solar, Hays Solar Project, retrieved 2020-11-29
- ^ "Hays Solar Facility | Projects". BluEarth Renewables. Retrieved 2023-04-15.
- ^ Solar Krafte Utilities, Prairie Sunlight II, retrieved 2020-09-01
- ^ Elemental Energy, Innisfail Solar, retrieved 2020-09-01
- ^ Canadian Solar, Jenner Solar Project, retrieved 2020-11-29
- ^ "Jenner Solar Facility | Projects". BluEarth Renewables. Retrieved 2023-04-15.
- ^ a b PACE Canada LP, Joffre Solar - 47 MW, retrieved 2020-11-29
- ^ "New Asset Joffre Solar 1 (JFS1) Notice". AESO. Retrieved 2023-07-21.
- ^ "New Asset Joffre Solar 2 (JFS2) Notice". AESO. Retrieved 2023-07-21.
- ^ a b Epcor, Kisikaw Pisim, retrieved 2020-09-07
- ^ a b Alberta, Government of. "kīsikāw pīsim Solar Farm (formerly E.L. Smith Solar Farm)". majorprojects.alberta.ca. Retrieved 2023-04-15.
- ^ "Kneehill Solar Capstone Infrastructure". Retrieved 2021-07-05.
- ^ "New Asset Lethbridge Solar (CLD1) Notice".
- ^ "New Asset Michichi Creek (MCH1) Notice". AESO. Retrieved 2023-04-15.
- ^ DrumhellerMail.com, Pat Kolafa | © (2021-07-08). "Drumheller solar project changes hands". DrumhellerMail. Retrieved 2023-04-15.
- ^ "Michichi Solar Capstone Infrastructure". Retrieved 2021-07-05.
- ^ AESO, Monarch Solar, retrieved 2022-04-18
- ^ "Saddlebrook Solar and Storage Project". TC Energy. Retrieved 2021-07-27.
- ^ CBC Canada, Scottford Refinery Solar Farm, retrieved 2021-12-10
- ^ Alberta, Government of. "Scotford Refinery Solar Farm". majorprojects.alberta.ca. Retrieved 2024-01-31.
- ^ "GL&P". GL&P. Retrieved 2023-12-03.
- ^ Alberta, Government of. "Sollair Solar Energy Project". majorprojects.alberta.ca. Retrieved 2023-12-03.
- ^ Solar Krafte, Spring Coulee Solar Project, retrieved 2020-09-07
- ^ a b Solar Krafte, Strathmore Solar Farm, retrieved 2020-09-07
- ^ "New Asset Stavely (STV1) Notice". AESO. Retrieved 2023-04-30.
- ^ Suffield Solar GP Inc, Suffield Solar (PDF), retrieved 2020-09-01
- ^ Omstead, Jordan (2020-11-19). "Indigenous-owned solar farm opens in remote northern Alberta community". CBC. Retrieved 2020-11-29.
- ^ Greengate Power, Travers Solar, retrieved 2021-08-13
- ^ Solar Krafte Utilities, Prairie Sunlight III, retrieved 2020-09-01
- ^ BluEarth Renewables, Yellow Lake Solar Project, retrieved 2020-09-07
- ^ "BluEarth Renewables". Retrieved 2021-12-10.
- ^ "Youngstown Solar Project". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
- ^ "New Asset Youngstown Solar (YNG1) Notice". AESO. Retrieved 2023-07-21.
- ^ Solar Krafte, Brooks Solar Farm, retrieved 2021-04-11
- ^ Alberta, Government of. "Brooks Solar Farm". majorprojects.alberta.ca. Retrieved 2023-06-13.
- ^ "Dunmore Solar Project". Dunmore Solar Project. Retrieved 2021-12-10.
- ^ Alberta, Government of. "Dunmore Solar Project". majorprojects.alberta.ca. Retrieved 2023-12-03.
- ^ "Enterprise Solar Project". www.enterprise-solar.com. Retrieved 2021-12-10.
- ^ "Enterprise Solar". Pattern Energy. Retrieved 2023-12-03.
- ^ Alberta, Government of. "Forty Mile Wind Farm (Granlea Phase 2)". majorprojects.alberta.ca. Retrieved 2023-12-03.
- ^ Greengate, Jurassic Solar +, retrieved 2022-08-21
- ^ Alberta, Government of. "Jurassic Solar and Battery Storage". majorprojects.alberta.ca. Retrieved 2024-01-31.
- ^ Métis Nation of Alberta, Métis Crossing Solar Farm Project, retrieved 2022-12-23
- ^ "CBC News Métis Crossing Solar Project".
- ^ Voltarix Group, Moon Lake Solar Project, retrieved 2021-12-10
- ^ Alberta, Government of. "Moon Lake Solar Project". majorprojects.alberta.ca. Retrieved 2024-01-31.
- ^ Alberta, Government of. "Peace River Energy Project". majorprojects.alberta.ca. Retrieved 2024-06-02.
- ^ "Peace River Energy Project – Peace Energy Cooperative". Retrieved 2024-06-02.
- ^ https://www.aeso.ca/market/market-updates/2024/gnr2-genesee-repower-2-mc-increase-and-change-in-fuel-type-notice-2
- ^ Solar Krafte, Vauxhall Solar Farm, retrieved 2021-12-10
- ^ Alberta, Government of. "Vauxhall Solar Farm". majorprojects.alberta.ca. Retrieved 2024-01-31.
- ^ Alberta, Government of. "Vulcan Community Solar Project". majorprojects.alberta.ca. Retrieved 2023-12-03.
- ^ EIA, World's-largest airport solar farm arriving at EIA, retrieved 2020-09-07
- ^ Alberta, Government of. "Airport City Solar". majorprojects.alberta.ca. Retrieved 2024-01-31.
- ^ PACE Canada LP, Caroline Solar - 9 MW, retrieved 2020-11-29
- ^ Alberta, Government of. "Caroline Solar Project". majorprojects.alberta.ca. Retrieved 2023-12-03.
- ^ Voltarix Group, Creekside Solar Project, retrieved 2021-12-10
- ^ Alberta, Government of. "Creekside Solar Project". majorprojects.alberta.ca. Retrieved 2024-01-31.
- ^ "Dolcy | Dolcy Solar Inc". Dolcy Solar. Retrieved 2023-09-19.
- ^ Alberta, Government of. "Dolcy Solar Project". majorprojects.alberta.ca. Retrieved 2024-01-31.
- ^ Georgetown Solar Project, retrieved 2022-12-23
- ^ Alberta, Government of. "Georgetown Solar Project". majorprojects.alberta.ca. Retrieved 2024-01-31.
- ^ PACE Canada LP, Hanna Sheerness Solar - 13 MW, retrieved 2020-11-29
- ^ Alberta, Government of. "Hanna Sheerness Solar Project". majorprojects.alberta.ca. Retrieved 2024-01-31.
- ^ Lathom Solar Project, Lathom Solar Project, retrieved 2021-05-12
- ^ Alberta, Government of. "Lathom Solar Project". majorprojects.alberta.ca. Retrieved 2024-01-31.
- ^ Luna Solar+ Phase I, retrieved 2022-12-23
- ^ Alberta, Government of. "Luna Solar Project (Phase One)". majorprojects.alberta.ca. Retrieved 2024-01-31.
- ^ Luna Solar+ Phase II, retrieved 2022-12-23
- ^ Alberta, Government of. "Luna Solar Project (Phase Two)". majorprojects.alberta.ca. Retrieved 2024-01-31.
- ^ DP Energy, Saamis Solar, retrieved 2022-08-21
- ^ Alberta, Government of. "Saamis Solar Farm". majorprojects.alberta.ca. Retrieved 2024-01-31.
- ^ EDF Renewable Energy, Vulcan Solar, retrieved 2020-09-07
- ^ Alberta, Government of. "Vulcan Solar Project". majorprojects.alberta.ca. Retrieved 2024-01-31.
- ^ Voltarix Group, Rocktree Solar Project, retrieved 2021-12-10
- ^ "Rocktree Solar Inc. Rocktree Solar Project, AUC Decision 27445-D01-2022 - Regulatory Law Chambers". 2022-12-15. Retrieved 2024-01-31.
- ^ "High River Solar". Elemental Energy. Retrieved 2022-08-21.
- ^ "The Nova Solar Power Project | Nova solar - about the project". www.novasolarproject.com. Retrieved 2023-05-17.
- ^ "Nova Solar Power Plant and Transmission Connection Project". AUC. Retrieved 2024-01-31.
- ^ "Public gets look at Sylvan Lake solar power project - Red Deer Advocate". www.reddeeradvocate.com. 2023-08-18. Retrieved 2023-09-19.
- ^ Alberta, Government of. "Kiwetinohk Energy Sylvan Solar Farm". majorprojects.alberta.ca. Retrieved 2024-01-31.
- ^ Alberta, Government of. "Homestead Solar Project". majorprojects.alberta.ca. Retrieved 2024-01-31.
- ^ "Granum Solar Energy Project". AUC. Retrieved 2024-01-31.
- ^ "Aira Solar Project Connection (2461)". AESO. Retrieved 2023-04-24.
- ^ "Estuary Solar Project Connection (2418)". AESO. Retrieved 2023-05-17.
- ^ "Home". Estuary Solar - Alberta. Retrieved 2023-05-17.
- ^ Teric Power Ltd, eReserve1, retrieved 2020-11-29
- ^ Teric Power Ltd, eReserve2, retrieved 2020-11-29
- ^ Teric Power Ltd, eReserve3, retrieved 2020-11-29
- ^ a b "New Assets eReserve4 and eReserve6 (ERV4 and ERV6) Notice". AESO. Retrieved 2023-08-30.
- ^ "New Asset eReserve5 Hughenden (ERV5) Notice". AESO. Retrieved 2023-02-09.
- ^ "eReserve7 — Enfinite". Enfinite. Retrieved 2024-01-12.
- ^ "eReserve8 — Enfinite". Enfinite. Retrieved 2024-01-12.
- ^ "eReserve9 — Enfinite". Enfinite. Retrieved 2024-01-12.
- ^ TransAlta, WindCharger Battery Storage, retrieved 2020-09-06
- ^ Teric, Whitla Storage Project Storage, retrieved 2024-01-25
- ^ Strand, Stephen (2024-01-30). "The Saddlebrook Solar and Storage project is moving onto phase two". Okotoks Online. Retrieved 2024-02-01.
Phase two is expected to be completed by the end of the year.
- ^ Turning Point Generation, The Canyon Creek Project, retrieved 2020-11-29
- ^ Masha Scheele, Canyon Creek Project eyes 2021 build, retrieved 2020-11-29
- ^ "Management's Discussion and Analysis" (PDF). TransAlta. March 2019. p. 1. Retrieved 2020-02-06.
- ^ "TransAlta Renewables Inc. Investor Presentation" (PDF). TransAlta Renewables. March 2018. pp. 19–22. Retrieved 2021-02-06.
- ^ Shumkov, Ivan (2021-06-18). "Quidnet Energy plans multi-gigawatt geologic storage project in Alberta". Renewables Now. Retrieved 2021-07-22.
- ^ CapitalPower, Genesee 1 and 2, retrieved 2021-08-01
- ^ "Notice re. Status of Genesee Re-Powering Project and Genesee Units 1 (GN1) and 2 (GN2)". AESO. Retrieved 2023-06-29.
- ^ CapitalPower, Genesee 3, retrieved 2021-08-01
- ^ ATCO Power, Battle River Coal-Fired Generating Station, archived from the original on 2010-07-27, retrieved 2010-08-27
- ^ TransAlta, Keephills 1, retrieved 2022-01-01
- ^ TransAlta, Keephills 3, retrieved 2022-01-01
- ^ Alberta Energy Regulator, Coal Demand, retrieved 2020-10-07
- ^ TransAlta (2010-04-01), TransAlta fully retires all units of its Wabamun power-plant, retrieved 2010-09-06