Jump to content

Line 2 (Hangzhou Metro)

From Wikipedia, the free encyclopedia
(Redirected from Line 2, Hangzhou Metro)
Line 2
 2 
A train of Hangzhou Metro Line 2
Overview
StatusOperational
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
Termini
Stations33
Service
TypeRapid transit
SystemHangzhou Metro
Operator(s)Hangzhou Metro Corporation
Depot(s)Shushan Depot
Shuangqiao Stabling Yard
Rolling stockPM066[1]
PM098
PM134
PM138
Daily ridership747,800 (2020 peak)
History
Opened24 November 2014; 10 years ago (2014-11-24)[2]
Technical
Line length42.85 km (26.63 mi)[3]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead, 1500 V DC
Operating speed80 km/h (50 mph)
SignallingAnsaldo STS CBTC[4]
Route map

Shushan Depot
1
Chaoyang
2
Caojiaqiao
3
Panshui
4
Renmin Road
5
Hangfachang
6
People's Square
 5 
7
Jiansheyi Road
8
Jianshesan Road
 7 
9
Zhenning Road
10
Feihong Road
11
Yingfeng Road
12
Qianjiang Century City
 6 
Line 4 interconnection
13
Qianjiang Road
 4   9 
14
Qingchun Square
15
Qingling Road
16
North Jianguo Road
 5 
17
North Zhonghe Road
18
Fengqi Road
 1 
Line 1 interconnection
19
Wulinmen
 3 
district Gongshu / Xihu
20
Shentangqiao
 19 
21
Xianing Bridge
22
Xueyuan Road
 10 
23
Gucui Road
24
Fengtan Road
25
Wenxin
26
Sanba
 5 
27
Xialongwei
28
Sandun
district
Xihu
Gongshu
29
Dunxiang Street
district
Gongshu
Yuhang
30
Jinjiadu
 4 
31
Baiyang
32
Dufucun
33
Liangzhu
Shuangqiao Stabling Yard

Line 2 of the Hangzhou Metro (Chinese: 杭州地铁二号线; pinyin: Hángzhōu Dìtiě Èr Hào Xiàn) is a north-south rapid transit line, connecting the downtown with the districts of Xiaoshan and Yuhang in Hangzhou.[5][6]

The first phase of the line, between Qianjiang Road and Chaoyang stations, entered operation on 24 November 2014 after six years of construction. It was extended to Gucui Road on 3 July 2017, and then to Liangzhu on 27 December in the same year.[6]

During the day, Automatic Train Operation (ATO) is used on the line, which does not require train operators to control the speed of the train manually, however, every night between the hours of 20:30 and 22:30, operators are required to drive the train manually to ensure they still have the ability to drive the train manually in case of exceptional circumstances when ATO is not functional.[7]

Opening timeline

[edit]
Segment Commencement Length Station(s) Name
Chaoyang — Qianjiang Road 24 November 2014 18.3 km (11.37 mi) 12 Phase 1 (southeastern section)
Qianjiang Century City 28 April 2016 Infill station 1
Qianjiang Road — Gucui Road 3 July 2017 11.3 km (7.02 mi) 9 Phase 1 (northwestern section)
Gucui Road — Liangzhu 27 December 2017 13.32 km (8.28 mi) 10 Phase 2 & 3
Xianing Bridge 30 June 2020[8] Infill station 1

Stations

[edit]
Station name Connections Distance
km[9]
Location
English Chinese
1 Chaoyang 朝阳 0.00 0.00 Xiaoshan
2 Caojiaqiao 曹家桥 1.34 1.34
3 Panshui 潘水 1.56 2.90
4 Renmin Road 人民路 1.18 4.08
5 Hangfachang 杭发厂 1.31 5.39
6 People's Square 人民广场  5  1.16 6.55
7 Jiansheyi Road 建设一路 1.47 8.02
8 Jianshesan Road 建设三路  7  1.15 9.17
9 Zhenning Road 振宁路 1.62 10.79
10 Feihong Road 飞虹路 1.58 12.37
11 Yingfeng Road 盈丰路 1.23 13.60
12 Qianjiang Century City 钱江世纪城  6  0.94 14.54
13 Qianjiang Road 钱江路  4   9  3.46 18.00 Shangcheng
14 Qingchun Square 庆春广场 0.93 18.93
15 Qingling Road 庆菱路 1.23 20.16
16 North Jianguo Road 建国北路  5  1.47 21.63 Gongshu
17 North Zhonghe Road 中河北路 0.93 22.56
18 Fengqi Road 凤起路  1  0.74 23.30
19 Wulinmen 武林门  3  1.29 24.59 Gongshu/Xihu
20 Shentangqiao 沈塘桥  19  1.28 25.87
21 Xianing Bridge 下宁桥 1.15 27.02 Xihu
22 Xueyuan Road 学院路  10  0.92 27.94
23 Gucui Road 古翠路 1.11 29.05
24 Fengtan Road 丰潭路 1.45 30.50
25 Wenxin 文新 1.29 31.79
26 Sanba 三坝  5  1.16 32.95
27 Xialongwei 虾龙圩 1.19 34.14
28 Sandun 三墩 1.24 35.38
29 Dunxiang Street 墩祥街 1.27 36.65 Gongshu
30 Jinjiadu 金家渡  4  0.93 37.58 Yuhang
31 Baiyang 白洋 1.79 39.37
32 Dufucun 杜甫村 1.87 41.24
33 Liangzhu 良渚 1.38 42.62

Rolling stock

[edit]
Stock Class Year built Builder Number built Numbers Formation Depots Line assigned Notes
PM066 B 2013-2015 CSR Nanjing Puzhen 162 (27 sets) 02 001 - 02 027 (020011-020276) Tc+Mp+M+M+Mp+Tc Shushan Depot
Shuangqiao Yard
 2 
PM098 2016-2017 CRRC Nanjing Puzhen 102 (17 sets) 02 028 - 02 044 (020281-020446)
PM134 2018 12 (2 sets) 02 045 - 02 046 (020451-020466)
PM138 2019-2020 120 (20 sets) 02 047 - 02 066 (020471-020666)


To scale map of Line 2 (Hangzhou Metro)

See also

[edit]

References

[edit]
  1. ^ "杭州地铁2号线车速最高80码 车厢座椅冬天能加热--浙江在线-浙江新闻".
  2. ^ 杭州地铁2号线24日试运营 列车全天运行15小时. 杭州地铁网. 2014-11-12.
  3. ^ "今天17时,地铁2号线全程开通 从头坐到尾只需77分钟". 2017-12-27.
  4. ^ "杭州地铁2号线车速最高80码 车厢座椅冬天能加热--浙江在线-浙江新闻".
  5. ^ 杭州地铁2号线铺新轨. December 22, 2012.
  6. ^ a b 杭州地铁2号线一期工程. December 11, 2012. Archived from the original on December 15, 2013.
  7. ^ Phone call with official office: 0571 5656 7007
  8. ^ "明天上午10点,下宁桥站、火车南站站同步开通!". 2020-06-29.
  9. ^ 中铁第四勘察设计院集团有限公司. 杭州地铁二号线二期工程环境影响报告书简本 (Report).