Line 13 (Chengdu Metro)
Appearance
This article needs additional citations for verification. (January 2021) |
Line 13 | |
---|---|
13 | |
Overview | |
Status | Under construction |
Owner | Chengdu |
Locale | Chengdu, China |
Termini | |
Stations | 21 |
Service | |
Type | Rapid transit |
System | Chengdu Metro |
Services | 1 |
Operator(s) | Chengdu Metro Limited |
Rolling stock | 8-car Type A (Driverless)[1] |
Technical | |
Line length | 29.06 km (18.06 mi) |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 140 kilometres per hour (87 mph) |
Line 13 of the Chengdu Metro (Chinese: 成都地铁13号线) is a metro line in Chengdu, Sichuan, China. The first phase of the line is currently under construction and is entirely underground.
History
[edit]- On 11 November 2019, construction on line 13 began.[2]
- On 16 December 2022, Line 13 Phase 1 finished Sanguantang to Jiuyanqiao Section tunnel construction, marking the success of the longest underwater/river tunnel work in Chengdu Metro history.[3]
- On 13 January 2023, 15 stations finished structural construction and tunnel finished 62%, railroad finished 10% [4]
- On 30 March 2023, Line 13 Jiuyanqiao~Xinnanmen section's tunnel boring machine finished construction.[5]
- On 20 September 2023, Line 13's first train is finished. This is Chengdu's second metro line to use driverless automatic trains.[6]
Incidents
[edit]- In June 2024 a part of Line 13 collapsed, destroying the road above.[7]
Opening timeline
[edit]Segment | Commencement | Length | Stations | Name |
---|---|---|---|---|
Wayaotan — Long'an | Under construction | 29.06 km (18.06 mi) | 21 | Phase 1 |
Stations
[edit]Station name | Connections | ||||||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
Wayaotan | 瓦窑滩 | ||||||
Wanjiawan | 万家湾 | ||||||
Peifeng | 培风 | 9 | |||||
Wanshouqiao | 万寿桥 | ||||||
Dongpo Road | 东坡路 | 7 | |||||
Guanghuacun | 光华村 | ||||||
Dufu Thatched Cottage | 杜甫草堂 | ||||||
Qingyang Taoist Temple | 青羊宫 | 5 | |||||
Xiaonan Street | 小南街 | 17 | |||||
Wenwengshishi | 文翁石室 | 10 | |||||
Huaxiba | 华西坝 | 1 | |||||
Xinnanmen | 新南门 | 3 | |||||
Jiuyanqiao | 九眼桥 | ||||||
Sanguantang | 三官堂 | 6 | |||||
Jingju Temple | 净居寺 | 8 | |||||
Sichuan Normal University | 四川师大 | 7 | |||||
Jiaozi Flyover | 娇子立交 | 30 | |||||
Xingfumeilin | 幸福梅林 | ||||||
Sanshenghuaxiang | 三圣花乡 | ||||||
Longhua Temple | 龙华寺 | ||||||
Long'an | 龙安 | ||||||
References
[edit]- ^ "成都地铁13号线有最新消息 不止是一条全自动地铁线路" (in Chinese).
- ^ "成都地铁13号线最新消息!" [The latest news on Chengdu Metro Line 13!]. The Paper (in Chinese). 14 December 2020. Retrieved 17 January 2021.
- ^ "成都地铁再上新!首个四线换乘车站揭秘" (in Chinese). 21 December 2022.
- ^ "10号线三期、17号线二期、18号线三期……成都轨道交通9条在建线路进展→" (in Chinese).
- ^ "成成都地铁13号线九新区间顺利完成盾构吊装". 13 January 2023. Retrieved 2 April 2023.
- ^ "成都地铁13号线有最新消息 不止是一条全自动地铁线路" (in Chinese).
- ^ https://www.reuters.com/world/china/subway-under-construction-collapses-chinas-chengdu-creating-sinkhole-2024-06-21/ [bare URL]