Liffey Service Tunnel

Coordinates: 53°20′48″N 6°13′49″W / 53.34667°N 6.23028°W / 53.34667; -6.23028
From Wikipedia, the free encyclopedia

River Liffey Service Tunnel
Recovery of the TBM after tunnel completion
Overview
LocationDublin, Ireland
Coordinates53°20′48″N 6°13′49″W / 53.34667°N 6.23028°W / 53.34667; -6.23028
Operation
Work begun2006
ConstructedPipe Jacking
Opened2008
OwnerDublin City Council
Technical
Length260 m (280 yd)
Tunnel clearance2.5 m (8 ft 2 in) ID

The Liffey Service Tunnel (Irish: Tollán Sheirbhísí na Life) is a service tunnel for various pipelines in Dublin, Ireland, owned by Dublin City Council.[1]

Project

[edit]

The tunnel was designed by British company Atkins[2] and constructed by a joint venture of the German contractor Züblin and the Irish contractor Cleary & Doyle of Wexford. Its construction took place from September 2006 until October 2008.[citation needed]

Tunnel design

[edit]

The tunnel is 260 m (280 yd) long and consists of a single bore of diameter 2.96 m (9 ft 9 in). It was built in pipe-jacking using a Herrenknecht tunnel-boring machine and 2.5 m (8 ft 2 in)-long precast reinforced-concrete pipes. The tunnel leads from the southern edge of the East Link Bridge, underneath the River Liffey towards the North Quay Wall, approximately 150 m (160 yd) west of 3Arena. The drive and reception shafts are respectively 19 m (62 ft) and 22 m (72 ft) deep, leaving the tunnel passing approximately 8 m (26 ft) below the shipping channel of the river.[citation needed]

An access cover near the northern end of the tunnel

References

[edit]
  1. ^ "Tuarascáil ar Mheasúnacht Tionchair Timpeallachta (TMTT) Clongriffin to City Centre Scheme January 2022 SUSTAINABLE TRANSPORT FOR A BETTER CITY. Scéim Chroíchonaire Bus na Rinne go Lár na Cathrach Imleabhar 1 Achoimre Neamhtheicniúil" (PDF). Ringsend Scheme. July 2023.
  2. ^ "Liffey Services Tunnel, Dublin". Atkins. Retrieved 29 November 2017.