Leaning Juniper Wind Project
Appearance
The Leaning Juniper Wind Project is an electricity generating wind farm facility located in Gilliam County, Oregon, United States with a total generating capacity of 301.5 megawatts. It is owned by PacifiCorp and began operations in 2006. Leaning Juniper I became operational in September 2006 with 67 1.5 MW wind turbines with a capacity of 100.5 megawatts.[1] "Leaning Juniper II includes 133 GE 1.5 MW wind turbines with a capacity of 201 MW. This phase came online in 2011."[2][3][4][5][6] The Jones Canyon Substation was built as part of this project and to support other wind projects in the area.[7]
See also
[edit]References
[edit]- ^ "Leaning Juniper I". www.pacificorp.com. Retrieved 2019-03-14.
- ^ "Leaning Juniper II". www.pacificpower.net. Archived from the original on 2019-03-10. Retrieved 2019-03-14.
- ^ "AWEA - Projects". Archived from the original on 2010-08-07. Retrieved 2010-07-28. Retrieved 2009-12-26
- ^ www.allbusiness.com http://www.allbusiness.com/energy-utilities/utilities-industry-electric-power-power/5404507-1.html. Retrieved 2009-12-26.
{{cite web}}
: Missing or empty|title=
(help)[title missing] - ^ www.transmission.bpa.gov http://www.transmission.bpa.gov/PlanProj/Wind/completed.cfm?page=juniper. Retrieved 2009-12-26.
{{cite web}}
: Missing or empty|title=
(help)[title missing] - ^ NBC News Retrieved 2009-12-26
- ^ "Home".