Khru Nai MRT station
Appearance
The topic of this article may not meet Wikipedia's notability guideline for geographic features. (December 2024) |
ครุใน PP33 Khru Nai | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MRT | ||||||||||||||||
General information | ||||||||||||||||
Location | Phra Pradaeng, Samut Prakan, Thailand | |||||||||||||||
Coordinates | 13°38′25.7″N 100°31′34.6″E / 13.640472°N 100.526278°E | |||||||||||||||
Owned by | Mass Rapid Transit Authority of Thailand | |||||||||||||||
Operated by | Bangkok Expressway and Metro Public Company Limited | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 2 side platforms | |||||||||||||||
Tracks | 2 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated | |||||||||||||||
Accessible | Yes | |||||||||||||||
Other information | ||||||||||||||||
Station code | PP33 | |||||||||||||||
History | ||||||||||||||||
Opening | 2027 | |||||||||||||||
Services | ||||||||||||||||
|
Khru Nai station (Thai: สถานีครุใน) is an under construction Bangkok MRT station and future southern terminus of the Purple Line.[1][2][3][4][5]
References
[edit]- ^ "โครงการรถไฟฟ้าสายสีม่วง ช่วงเตาปูน-ราษฎร์บูรณะ (วงแหวนกาญจนาภิเษก)". www.mrta-purplelinesouth.com. Retrieved 2024-11-17.
- ^ "Nearly 50% work done in crucial tunnel of Purple Line metro project". nationthailand. 2024-06-16. Retrieved 2024-11-17.
- ^ ฐานเศรษฐกิจ (2024-11-09). "อัปเดต! งานก่อสร้างรถไฟฟ้าสายสีชมพู-สีม่วง-สีส้ม คืบหน้าตามแผน". thansettakij (in Thai). Retrieved 2024-11-17.
- ^ "รถไฟฟ้าสายสีม่วงใต้ เตาปูน-ราษฎร์บูรณะ 17 สถานี ผ่านที่ไหนบ้าง เปิดใช้เมื่อไหร่". www.thairath.co.th (in Thai). 2023-06-29. Retrieved 2024-11-17.
- ^ ""รถไฟฟ้าสายสีม่วงใต้" เตาปูน-ราษฎร์บูรณะ เป้าเปิดบริการปี 71". Thai PBS (in Thai). Retrieved 2024-11-17.