Jump to content

Kengeri Bus Terminal metro station

Coordinates: 12°54′54″N 77°29′15″E / 12.914897547311018°N 77.48759284335294°E / 12.914897547311018; 77.48759284335294
From Wikipedia, the free encyclopedia

Kengeri Bus Terminal
Namma Metro station
A metro station connecting the Kengeri Bus Terminal
General information
Other namesKengeri Bus Station, Kengeri TTMC
LocationKengeri bus terminal Metro Station Mailasandra, Mailasandra, Bengaluru, Karnataka 560060
Coordinates12°54′54″N 77°29′15″E / 12.914897547311018°N 77.48759284335294°E / 12.914897547311018; 77.48759284335294
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Purple Line
PlatformsSide platform
Platform-1 → Whitefield (Kadugodi)
Platform-2 → Challaghatta
Tracks2
ConnectionsBus interchange Kengeri TTMC
Construction
Structure typeElevated, Double track
Platform levels2
ParkingCar parking Available
ArchitectSoma Enterprise Ltd.
Other information
StatusStaffed
Station codeMLSD
History
Opened30 August 2021; 3 years ago (2021-08-30)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Pattanagere Purple Line Kengeri
towards Challaghatta
Location
Map

Kengeri Bus Terminal is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India. It is one of the most important metro stations since it holds the Kengeri Bus Terminus in the suburban city of Kengeri. It was inaugurated on 29 August 2021 and opened to the public on 30 August 2021.[1][2]

Station layout

[edit]
Kengeri Bus Terminal track layout
P2
P1
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 1
Eastbound
Towards → Whitefield (Kadugodi)
Next Station: Pattanagere
Platform 2
Westbound
Towards ← Challaghatta
Next Station: Kengeri
Side platform | Doors will open on the left Disabled access
L2

Entry/Exit

[edit]

There are 2 Entry/Exit points - A and B. Commuters can use either of the points for their travel.

  • Entry/Exit point A - Towards Kengeri side
  • Entry/Exit point B - Towards Kengeri side

See also

[edit]

References

[edit]
  1. ^ "Kengeri metro line inaugurated, commercial operations from August 30". The Hindu. 29 August 2021. ISSN 0971-751X. Retrieved 29 August 2021.
  2. ^ "Bengaluru Metro: 7.5-km Purple line from Mysore Road to Kengeri inaugurated". www.timesnownews.com. Retrieved 29 August 2021.