KRI Raja Haji Fisabilillah
Raja Haji Fisabilillah during its launching ceremony
| |
History | |
---|---|
Indonesia | |
Name | KRI Raja Haji Fisabilillah |
Namesake | Raja Haji Fisabilillah |
Builder | Noahtu Shipyard, Bandar Lampung |
Cost | Rp 1.079 trillion |
Yard number | 406[1] |
Laid down | 16 November 2022 |
Launched | 18 September 2024 |
Identification | Pennant number: 391 |
Status | Fitting out |
General characteristics | |
Type | Raja Haji Fisabilillah-class offshore patrol vessel |
Displacement | |
Length | 98 m (321 ft 6 in) |
Beam | 13.5 m (44 ft) (breadth) |
Height | 6.5 m (21 ft) |
Draft | 4 m (13 ft) |
Propulsion | 4 × MAN 16V28/33STC diesel engines, 7,280 kW (9,760 shp) |
Speed | 28 knots (52 km/h) |
Boats & landing craft carried | 2 × RHIBs |
Complement | 70 (+24 extra personnel) |
Sensors and processing systems | Havelsan Advent CMS |
Electronic warfare & decoys | |
Armament |
|
Aircraft carried | 1 × helicopter |
Aviation facilities | Flight deck and hangar |
KRI Raja Haji Fisabilillah (391) is the lead ship of Raja Haji Fisabilillah-class offshore patrol vessel to be operated by the Indonesian Navy.
Design
[edit]Raja Haji Fisabilillah initially was designed with a length of 90 m (300 ft) and a beam of 13.5 m (44 ft),[2] however during the construction it was redesigned to a length of 98 m (322 ft).[3]
Service history
[edit]The ship's contract was awarded on 16 April 2020, with the contract worth Rp 1,079,100,000,000.[4] Its construction was began with first steel cutting on 26 August 2021 at the then PT Daya Radar Utama (later renamed to PT Noahtu Shipyard) shipyard in Bandar Lampung, Lampung.[2][5]
The ship's keel was laid on 16 November 2022.[6] The ship experienced delays during its construction, which drew some criticism. Although the ship was planned to be handed over in 2023, the construction progress was only at 35% by March 2023.[4][7]
The patrol vessel was launched on 18 September 2024,[8] and was officially given the name of Raja Haji Fisabilillah two days later on the 20 September.[9]
References
[edit]- ^ "Brigif 4 Marinir/BS Menghadiri Acara Keel Laying Kapal Offshore Patrol Vessel (OPV)". marinir.tnial.mil.id (in Indonesian). 16 November 2022. Retrieved 26 August 2024.
- ^ Ardiansyah, Yulian (18 November 2022). "PT DRU Letakkan Lunas Untuk Dua OPV Baru TNI AL". globalbusinesspress.net (in Indonesian). Retrieved 26 August 2024.
- ^ a b "Kinerja Kemenhan Jadi Sorotan, KPK Diminta Awasi Proyek Kapal OPV, Nilai Proyek 2 Triliun". merdekanews.co (in Indonesian). 11 April 2023. Retrieved 26 August 2024.
- ^ "Kemhan Pesan Kapal OPV dan OPV 90 Meter Buatan Dalam Negeri". kemhan.go.id (in Indonesian). 26 August 2021. Retrieved 26 August 2024.
- ^ "Brigif 4 Marinir/BS Menghadiri Acara Keel Laying Kapal Offshore Patrol Vessel (OPV)". mediafaktanews.com (in Indonesian). 17 November 2022. Retrieved 26 August 2024.
- ^ Rusdiyono (13 April 2023). "Dua Petinggi Perusahaan Pembuatan Kapal OPV Masih Bungkam Soal Progres Proyek Milik Kementerian Pertahanan". infoindonesia.id (in Indonesian). Retrieved 18 September 2024.
- ^ "Staf Ahli Menhan Bidang Politik Pimpin Upacara Peluncuran Kapal OPV 90M". kabarpolitik.com (in Indonesian). 18 September 2024. Retrieved 18 September 2024.
- ^ Susanti, Anita (20 September 2024). "TNI AL KEMBALI DIPERKUAT DUA KAPAL OPV 90M & OPV BUATAN INDUSTRI DALAM NEGERI". pesonalampungnews.com (in Indonesian). Retrieved 20 September 2024.