Jiaohuachang station
Appearance
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Chaoyang District, Beijing China | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Line 7 | ||||||||||
Platforms | 2 (2 side platforms) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 28, 2014 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Jiaohuachang Station[1] (simplified Chinese: 焦化厂站; traditional Chinese: 焦化廠站; pinyin: Jiāohuàchǎng Zhàn) is a station on Line 7 of the Beijing Subway. It was opened on December 28, 2014.[2] It is located in the former site of the Beijing Jiaohuachang (Coking plant) complex.[3] The station was the terminus of Line 7 until the opening of the phase 2 eastern extension to Huazhuang on December 28, 2019.
Station layout
[edit]The station has 2 underground side platforms.
Exits
[edit]There are 4 exits, lettered A, B, C, and D. Exits A and C are accessible.
Gallery
[edit]-
Concourse
References
[edit]- ^ "Jpg格式线路图下载 | 北京地铁官方网站".
- ^ "Beijing opens four new subway lines". Xinhua. 2014-12-28.
- ^ 北京市规划委员会关于轨道交通7号线沿线车站站名命名预案的公示书. Beijing Municipal Planning Committee (北京市规划委员会). 2013-08-29. Archived from the original on 2015-09-23. Retrieved 2015-01-05.
39°51′20″N 116°32′14″E / 39.855488°N 116.537247°E