Healy Clean Coal Project
Healy Clean Coal Project | |
---|---|
Country | United States |
Location | Healy, Alaska |
Coordinates | 63°51′17″N 148°57′02″W / 63.85472°N 148.95056°W |
Status | Shutdown in 2000, sale to GVEA pending |
Commission date | 1998 |
Owners | Alaska Industrial Development and Export Authority (AIDEA) |
Thermal power station | |
Primary fuel | Usibelli Sub-bituminous coal |
Turbine technology | Clean coal technology |
Power generation | |
Nameplate capacity | 50 MW |
Healy Clean Coal Project was a clean coal technology demonstration program consisting of a coal fired electrical power station located in Healy, Alaska in Denali Borough. The project was a demonstration of the TRW Clean Coal Combustion System and the Babcock & Wilcox/Joy Spray Dryer Absorber (SDA) System designed to reduce oxides of nitrogen (NOX) and sulfur dioxide (SO2) emissions while burning a variety of coal types, including waste coal. The plant still operates as Healy Unit 2 but without the emissions-reduction technology.
The project constructed a plant adjacent to Golden Valley Electric Association (GVEA) 25 MW coal plant Healy Unit 1. Construction occurred from 1995 to 1997 at a cost of around $300 million. The facility operated briefly following its construction as part of the demonstration program, but has been shut down since 2000.[1] The research project is considered "complete" by the Department of Energy. The plant was sold in 2012 to the GVEA to resume power production.[2] It restarted in 2015, only to close the next year after an explosion. It resumed commercial operation in November 2018.[3]
Healy Unit 2 will be shut down in 2024 and Unit 1 will receive an emissions control system.[4]
Costs
[edit]According to Golden Valley Electric Association (GVEA) the facility cost around $300 million, with the United States Department of Energy contributing $120 million, the Alaska Legislature contributing $25 million, the Alaska Industrial Development and Export Authority (AIDEA) contributing $150 million and both GVEA & Usibelli Coal Mine contributing $10 million in addition to in-kind contributions.[2]
See also
[edit]References
[edit]- ^ Alaska's Wild Resource Web: Healy Coal Plant #2
- ^ a b "Golden Valley Electric Association (GVEA) HCCP page". Archived from the original on 2008-09-19. Retrieved 2008-07-20.
- ^ POWER (2019-08-01). "Healy 2: The Story of a Coal Unit's Remarkable Resiliency". POWER Magazine. Retrieved 2022-03-28.
- ^ "GVEA changes course, OKs Healy 2 shutdown, Healy 1 upgrade". KUAC. 2022-06-28. Retrieved 2022-06-30.
External links
[edit]- US DOE Clean Coal Demonstrations - Healy Clean Coal Project
- Golden Valley Electric Association (GVEA) HCCP page
- Alaska Industrial Development and Export Authority (AIDEA) HCCP page
- Data on generation and fuel consumption from the Energy Information Administration Electricity Data Browser