Handri-Neeva

Coordinates: 15°54′31″N 78°14′08″E / 15.90861°N 78.23556°E / 15.90861; 78.23556 (Handri Neeva Canal)
From Wikipedia, the free encyclopedia

Handri Neeva Sujala Sravanthi project
Map
The main canal of length 550km
Location
CountryIndia
Physical characteristics
SourceSrisailam reservoir
 • location15°54′31″N 78°14′08″E / 15.90861°N 78.23556°E / 15.90861; 78.23556 (Handri Neeva Canal)
 • elevation253 m (830 ft)
MouthMalyala
Length569 km (354 mi)
Discharge 
 • locationAdivipalli
 • average164.8 m3/s (5,820 cu ft/s)

Handri-Neeva Sujala Sravanthi project is the longest water canal project in the region of Rayalaseema, Andhra Pradesh, India. The project was conceived to provide a reliable irrigation and drinking water supply for the region through drawing flood waters from the Srisailam reservoir.[1][2]

The first phase of the canal begins at Malyala and irrigates six lakh acres in four districts of Rayalaseema, while the second phase provides irrigation facilities and drinking water for Chittoor district.[3] This canal links the Handri, Penna, Chitravathi, Papagni, Mandavya, Bahuda, Cheyyeru, Gargeya, Vedavati, Palar and several smaller rivers in the Rayalaseema region. The canal is located in the Kurnool, Ananthapur, Kadapa, and Chittoor districts.[1] The canal feeds several reservoirs and water tanks in the region. More than 50 Tmcft of water is required to meet the region's drinking and irrigation water requirements.

History

[edit]

The project was originally conceived by Englishman Sir Arthur Cotton in the late 19th century.[4] However, designs were only finalised during the term of N. T. Rama Rao in the 1980s and 1990s.[5] Budget allocation began in 2004 during the tenure of Y.S.Rajasekhara Reddy.[6]

The first phase of construction of the project began in 2005, during the tenure of Shri Y. S. Rajasekhara Reddy [7][8] The project is designed to utilise surplus water from the Krishna River;[1][8] however, this river is unreliable and does not ensure consistent allocation of water to the drought-prone Rayalaseema and Nellore districts. Several political members had previously demanded speedy completion of irrigation projects in Rayalaseema.[7] The two riparian states of the Krishna River, Andhra Pradesh and Telangana, are involved in a dispute over sharing water of the river.[9]

The Project

[edit]

The lift canal has a length of nearly 550 km. The canal starts from the back waters of the Srisailam reservoir at Malyala and is routed along the hill ridges up to the highlands in Chittoor district via the many lifts and pumping stations in the Kurnool, Ananthapur and Kadapa districts, ending at the Adavipalli Reservoir.[10][11] The canal feeds many tanks used for drinking water and irrigation. The project plans to draw nearly 40 Tmcft of water annually from the Krishna River.

The minimum draw down level for the Malyala pump house is 830 feet (253 m) MSL.[12] The project's annual operational requirement is 653 MW and 1.9 billion KWh of electrical energy, which is used to pump nearly 30 Tmcft of water.

The first phase of the canal (220 kilometers in length), from Srisailam to Jeedipalli reservoir, has been completed. This reservoir is located at Chinna Mushtur village in Ananthapur district. 3 balancing reservoirs constructed in Phase 1. These include Krishnagiri (Kurnool District), Pathikonda Reservoir (Kurnool District), and Jeedipalli Reservoir (Anantapuramu District).

A view of Gollapalli Reservoir

The second phase (349 kilometers in length, 75% completed) of the main canal leading up to Adivipalli Reservoir in Chittoor district. Running at full capacity, it is predicted to give IP to 404,500 acres and drinking water facilities for 23 lakh people in 293 villages in the region. It will use 26 Tmcft of water to this effect, diverted through the 3 branch canals Madakasira, Punganur and Niva and the 3 distributaries Atmakuru, Thamballapalli, Vayalpadu. In the upland areas of Rayalaseema District (Anantapur, Kadapa and Chittoor), the canal will fill six reservoirs - Veligallu Dam Reservoir and 5 balancing reservoirs constructed in Phase-II, Gollapalli Reservoir (Anantapuramu), Cherlopalli Reservoir (Anantapuramu), Marala Reservoir (Anantapuramu), 4. Srinivasapuram Reservoir (Kadapa), and Adivipalli Reservoir (Chittoor).

The Handri-Neeva can also feed by gravity the Tungabhdra high level canal and many other medium & minor tanks in Penna River basin to provide drinking water during severe droughts. This canal also feeds water to Bhairivani Tippa reservoir and other medium & minor irrigation tanks located in Krishna river basin of Ananthapur district to ensure the sufficient water in the area even during droughts. Thus, the canal also serves as an alternate source to feed Krishna river water to major, medium & minor irrigation projects, which have access to nearly 45 Tmcft of Krishna water under Bachawat tribunal award allocations.

To make the lift canal operational for catering to drinking water needs even during a severe drought year, K.C. Canal water sourced from Sunkesula Barrage can be fed to the canal's pump house by gravity when water level in the Srisailam reservoir is below the minimum draw down level required by the water pumps.

A supplementary pump house at Mutchumarri, which will draw water from Srisailam reservoir at 800 feet (244 m) MSL is in an advanced stage of construction.[when?] This pump house with its pipelines and canals can feed the nearby K.C. canal in addition to the Malyala pump house of Handri Neeva lift canal from dead storage water even during very poor monsoon year.[12][13]

Map

[edit]

Google interactive Map for Rayalaseema Irrigation Projects.[1]

See also

[edit]

References

[edit]
  1. ^ a b c Govt. of Andhra Pradesh, Water Resources Department. "HANDRI NIVA SUJALA SRAVANTHI PROJECT- PHASE I". HANDRI NIVA SUJALA SRAVANTHI PROJECT- PHASE I. Retrieved 10 September 2016.
  2. ^ "The Hindu : Andhra Pradesh / Hyderabad News : Handri-Neeva Sujala Sravanthi project to irrigate four lakh acres more". www.hindu.com. Archived from the original on 17 July 2009. Retrieved 17 January 2022.
  3. ^ Hindu, The (27 May 2015). "Handri-Neeva project". The Hindu. Retrieved 10 September 2016 – via www.google.com.
  4. ^ "Jalayagnam can be fruitful only in unified State: JAC". The Hindu. 10 April 2010. ISSN 0971-751X. Retrieved 10 September 2016.
  5. ^ "Hundri-Neeva: lifeline of parched Rayalaseema". The Hindu. 18 November 2012. ISSN 0971-751X. Retrieved 10 September 2016.
  6. ^ "Handri-Neeva details".
  7. ^ a b Hindu, The (16 March 2016). "Handri Neeva, Galeru Phase I to be completed by June". The Hindu. Retrieved 10 September 2016 – via www.google.com.
  8. ^ a b Indian Express, The New (9 December 2013). "Handri-Neeva, Galeru-Nagari Projects in Rayalaseema May Go Without Water". Archived from the original on 11 December 2013. Retrieved 10 September 2016 – via www.google.com.
  9. ^ Chronicle, Deccan (9 September 2014). "Water brings Telangana State and Andhra Pradesh close". Retrieved 10 September 2016 – via www.google.com.
  10. ^ India, The Hans (13 September 2020). "HNSS waters to Chittoor district soon: Deputy CM K Narayana Swamy". www.thehansindia.com. Retrieved 9 September 2024.
  11. ^ "Handri Neeva Sujala Sravanti (HNSS) JI00011". Archived from the original on 23 February 2016. Retrieved 9 May 2016.
  12. ^ a b "Handri Neeva Sujala Sravanti (Phase I) project". Retrieved 22 September 2015.
  13. ^ "Devineni inspects Muchumarri project works". 29 December 2015. Retrieved 29 December 2015.