Jump to content

Garden Reach Flyover

Coordinates: 22°31′33″N 88°18′24″E / 22.5257°N 88.3068°E / 22.5257; 88.3068
From Wikipedia, the free encyclopedia

Garden Reach Flyover
Coordinates22°31′33″N 88°18′24″E / 22.5257°N 88.3068°E / 22.5257; 88.3068
CarriesBikes, cars
LocaleKolkata, West Bengal, India  india
Characteristics
MaterialSteel, Concrete
Total length4.4 kilometres (2.7 mi)
History
Construction start2014 (2014)
Construction end2018 (2018)
Opened9 Mar 2018; 6 years ago (9 Mar 2018)
Statistics
TollNo
Location
Map

The Garden Reach Flyover is a flyover connecting the Garden Reach area and Majherhat in the port area of South Kolkata.[1] The 4.4 kilometres (2.7 mi) long and four-lane flyover was inaugurated by Chief Minister of West Bengal Mamata Banerjee on 9 March 2018.[2] Flyover connecting Brooklyn crossing, close to Ramnagar at the Garden Reach end and terminating near Majherhat railway station. The four-lane flyover that has been set up by the Kolkata Metropolitan Development Authority (KMDA) at a cost of Rs 340 crore.[3]

Background

[edit]

Khidirpur and Garden Reach are two of the crowded areas of Kolkata. For being densely populated, traffic is one of the major problems in the region. The main cause of the traffic is the large trailers and trucks entering and exiting the port area. Patients often have to get stuck in this traffic. Residents have long been demanding the construction of a flypool to relieve the suffering.[4]

Chief Minister Mamata Banerjee at a ceremony in Khidirpur in the morning, witnessed a severe traffic congestion on Garden Reach Road. The road is the main route to Khidirpur. At that time, MLA and Urban Development Minister Firhad Hakim had proposed to the Chief Minister to construct a flyover. The Chief Minister also agreed immediately.[4]

History

[edit]

Construction of this four-lane flyover began in February 2014. The work was supposed to be completed in August 2016. Due to land problems, the work is often delayed. Finally, it was decided that the flyover would be launched by July 2017.[citation needed]

The Kolkata Metropolitan Development Authority (KMDA) was appointed for the construction of the flyover. A Central Government firm RITES was appointed to prepare a Detailed Project Report (DPR). West Bengal government approved INR 339 crore for the construction of the flyover. The Kolkata Port Authority gave the land.[4]

References

[edit]
  1. ^ "One more flyover". The Telegraph. 7 March 2018. Retrieved 10 March 2018.[dead link]
  2. ^ "CM inaugurates 4.4 km Garden Reach flyover". www.millenniumpost.in. 9 March 2018. Retrieved 10 February 2020.
  3. ^ Suman Chakraborti & Dwaipayan Ghosh (8 March 2018). "Garden Reach flyover to be thrown open tomorrow". timesofindia.indiatimes.com. Retrieved 10 February 2020.
  4. ^ a b c "নয়া উড়ালপুল খিদিরপুরে". আনন্দবাজার পত্রিকা. 25 January 2018. Retrieved 10 February 2020.