Draft:Crestmont (microarchitecture)
Submission declined on 26 June 2024 by MicrobiologyMarcus (talk).
Where to get help
How to improve a draft
You can also browse Wikipedia:Featured articles and Wikipedia:Good articles to find examples of Wikipedia's best writing on topics similar to your proposed article. Improving your odds of a speedy review To improve your odds of a faster review, tag your draft with relevant WikiProject tags using the button below. This will let reviewers know a new draft has been submitted in their area of interest. For instance, if you wrote about a female astronomer, you would want to add the Biography, Astronomy, and Women scientists tags. Editor resources
|
Crestmont is the codename for Intel's fifth generation out of order Atom microarchitecture, and is the successor to Gracemont. It is used as the efficient-core and low power efficient-core microarchitecture in Intel's first generation Core Ultra processors (codenamed "Meteor Lake")[1], and Xeon 6 E-core processors (codenamed "Sierra Forest")[2].
General information | |
---|---|
Launched | November 4, 2023[3] |
Marketed by | Intel |
Designed by | Intel |
Common manufacturer | |
Performance | |
Max. CPU clock rate | 0.4 GHz to 3.8 GHz |
Cache | |
L1 cache | 96 KB per core:
|
L2 cache | 2 or 4 MB per module |
L3 cache | 3 MB per module (not present in Crestmont LP)[4] |
Architecture and classification | |
Instruction set | x86-64 |
Extensions | |
Physical specifications | |
Cores |
|
Products, models, variants | |
Product code names |
|
History | |
Predecessor | Gracemont |
Successor | Skymont |
Design
[edit]Crestmont contains the following enhancements over Gracemont:[5]
- 6 wide rename and dispatch, compared to 5-wide in Gracemont
- 6144 entry L2 Branch Target Buffer, compared to 5120 in Gracemont
- Branch predictor can scan 128 bytes per cycle, compared to 32 bytes per cycle in Gracemont
- Renamer can eliminate more µops by itself
- Floating point divide latency reduced to 5 cycles, from 10 in Gracemont
- Floating point scheduler sizes increased to a total of 60 entries, from 55 in Gracemont
- L2 TLB size increased to 3072 entries with 6-way associativity, from 2048 entries with 4-way associativity
Technology
[edit]- Manufactured on Intel 4 (Meteor Lake compute tile)[1], Intel 3 (Sierra Forest compute tile)[6], or TSMC N6 (Meteor Lake SoC tile)[1]
- 2 three-wide decoders in a cluster, each capable of fetching 32 bytes per cycle from the instruction cache
- 6-wide rename/dispatch[7]
- 256 entry reorder buffer[8]
- 17 execution ports with distributed schedulers[5]
- 32 kilobyte L1 data cache with eight-way associativity and 3 cycle latency[5]
- 64 kilobyte L1 instruction cache with eight-way associativity[8]
- 2-4 megabyte L2 cache with sixteen-way associativity and 17 cycles of latency shared between up to four cores[8]
- Access to shared L3 cache with P-cores or other E-core modules on Meteor Lake and Sierra Forest
List of Crestmont processors
[edit]See also
[edit]References
[edit]- ^ a b c Alcorn, Paul (September 20, 2023). "Intel Details Core Ultra 'Meteor Lake' Architecture, Launches December 14". Tom's Hardware. Archived from the original on June 8, 2024. Retrieved June 27, 2024.
- ^ Larabel, Michael (June 3, 2024). "Intel Launches Xeon 6700E "Sierra Forest" CPUs - Initially Up To 144 Cores". Phoronix. Archived from the original on June 4, 2024. Retrieved June 27, 2024.
- ^ Smith, Ryan (September 19, 2023). "The Intel Innovation 2023 Live Blog". AnandTech. Retrieved June 10, 2024.
- ^ Smith, Ryan (September 19, 2023). "The Intel Innovation 2023 Live Blog". AnandTech. Retrieved June 27, 2024.
- ^ a b c Lam, Chester (June 10, 2024). "Meteor Lake's E-Cores: Crestmont Makes Incremental Progress". Chips and Cheese. Archived from the original on May 28, 2024. Retrieved June 10, 2024.
- ^ Conway, Adam (26 September 2023). "Intel's process roadmap to 2025: Intel 7, 4, 3, 20A, and 18A explained". XDA-Developers. Archived from the original on March 28, 2024. Retrieved March 26, 2024.
- ^ "Meteor Lake's E-Cores: Crestmont Makes Incremental Progress". Chips and Cheese. 13 May 2024. Archived from the original on May 28, 2024. Retrieved June 10, 2024.
- ^ a b c Smith, Ryan (August 28, 2023). "Hot Chips 2023: Intel Details More on Granite Rapids and Sierra Forest Xeons". Anandtech. Archived from the original on May 11, 2024. Retrieved June 27, 2024.
- in-depth (not just passing mentions about the subject)
- reliable
- secondary
- independent of the subject
Make sure you add references that meet these criteria before resubmitting. Learn about mistakes to avoid when addressing this issue. If no additional references exist, the subject is not suitable for Wikipedia.