China National Highway 580
Appearance
National Highway 580 | ||||
---|---|---|---|---|
580国道 | ||||
Major junctions | ||||
From | Aksu | |||
G217 Aral G315 Hotan | ||||
To | G219 Kangxiwar | |||
Location | ||||
Country | China | |||
Highway system | ||||
|
China National Highway 580 will run from Aksu in Xinjiang to Kangxiwar, also in Xinjiang. As of 2021[update] the route is still partially under construction[1] and scheduled to be completed in 2022.[2] The route will traverse the Hindutash through a tunnel.[3]
See also
[edit]References
[edit]- ^ Zeng, Tao-rui; Wang, Lin-feng (2019). "The Reliability and Stability Analysis of High Shear Slope in Cold Region Based on First Order Quadratic Matrix". Science Technology and Engineering (21). kns.ccpd.cnki.net. ISSN 1671-1815. Retrieved 7 January 2020.
Taking the K86 + 780 ~ K86 + 840 soil high cut slope of the highway section from Hetian to Kangxiwa of G580 line as an example,the reliability calculation of soil high cut slope in the cold region was carried out
[permanent dead link ] - ^ 中国交通新闻网 (2019-11-18). "580国道和康项目一标完成路面摊铺" [G580 Hotan-Kangxiwar Project first milestone completed, road surface paved]. Ministry of Transport of the People's Republic of China. Retrieved 7 January 2020.
日前,580国道新疆和田至康西瓦公路项目一标主线沥青路面完成摊铺,为2022年全线通车奠定了坚实基础。
[permanent dead link ] - ^ "新疆G580线和田至康西瓦公路PPP项目施工总承包指挥部" [Xinjiang G580 line Hotan to Kangxiwar road PPP project construction general contracting HQ] (in Chinese). gonglutielu.com. 2017-08-28. Archived from the original on 2022-04-09. Retrieved 7 January 2020.
于印地他什达坂设隧道,出洞后沿等高线展线而下,最终与G219相接。